PT PEMBANGKITAN JAWA BALI
Review on Feasibility Study of
Lasolo Hydro Power Plant

Overview of Lasolo River

Top View of Lasolo River Near Dam Site

Draft Final Report


PT PEMBANGKITAN JAWA BALI
Review on Feasibility Study of
Lasolo Hydro Power Plant

Location of
Dam Site

Top View of Dam Site Location

Location of
Dam Site

Top View of Dam Site Location

Draft Final Report


PT PEMBANGKITAN JAWA BALI
Review on Feasibility Study of
Lasolo Hydro Power Plant

Upstream
Cofferdam

Top View of Dam Site Location

Situation near The Dam Site Location

Draft Final Report


PT PEMBANGKITAN JAWA BALI
Review on Feasibility Study of
Lasolo Hydro Power Plant

Situation near The Dam Site Location

Lasolo River

The Last Access


Point by Road

The Last Access Point by Road

Draft Final Report


Gedung Tatapuri Lt. 7
Jl. Tanjung Karang 3-4A, Kebon Melati
Jakarta Pusat 10230
Telp. +62 21 314 8372, Fax. +62 21 314 8370
www.reconsult.co.id

AF-CONSULT SWITZERLAND
Täfernstrasse 26
5405 Baden/Dättwil

Das könnte Ihnen auch gefallen