1. Purpose
The common thread throughout the SOP and HWD Policies and Procedures in general is
the identification of responsibilities. This manual is intended to clearly and concisely
identify the steps required by employees to complete any given operation in a manner
that is consistent with Horizontal Well Drillers standards. It will document progressive
steps required in sequence that are to be followed, an authorizing company department or
position, and an author that is to be consulted if there are questions in any portion of the
SOP standards.
2. Scope
ALL RIG PERSONNEL
3. Prerequisites
Personnel are required to wear proper personal protective equipment, follow job safety
rules, and have the appropriate experience and certifications to carry out their job
functions satisfactorily.
4. Responsibilities
Tool pusher is responsible to ensure procedure is being followed. Tool pusher must
ensure procedure is followed and the safety of all personnel is paramount. Steam is very
dangerous and if not handled accordingly, may result in serious injury or death. Tool
pusher is to ensure procedure is followed in a timely manner if the Boiler is to
accidentally shut down, or need shut down for repairs.
5. Procedure
1. Ensure JSA is properly filled out for the task to be performed.
2. Ensure that pre-job safety meeting is conducted with all necessary personnel prior to
any operations.
3. If Boiler must be shut down for repair the following procedure must be followed.
SOP #: 07.10
Horizontal Well
Revision #: 1
Drillers
Implementation Date: 2012/10/25
Last Reviewed/Update
Page #: 2 of 7 2012/10/25
Date:
HWD Executive HWD Executive
SOP Owner: Approval:
Management Management
6. References
HWD Employee Handbook
7. Definitions
NA
Return line (condensation water) each head is equipped with the same, Y strainer
with ¾ plug, steam trap, check valve, cut off valve.
SOP #: 07.10
Horizontal Well
Revision #: 1
Drillers
Implementation Date: 2012/10/25
Last Reviewed/Update
Page #: 6 of 7 2012/10/25
Date:
HWD Executive HWD Executive
SOP Owner: Approval:
Management Management