Sie sind auf Seite 1von 5

Autodesk Robot Structural Analysis Professional 2014

Author: File: southport2.rtd


Address: Project: southport2

1 Spread footing: Foundation1 Number: 1


1.1 Basic data

1.1.1 Assumptions

 Geotechnic calculations according to : ACI


 Concrete calculations according to : ACI 318-08
 Shape selection : without limits
 Limited by adjacent foundation :
in the x axis direction : from left Dx <= 27.84 (in)
in the y axis direction : from bottom Dy <= 27.84 (in)

1.1.2 Geometry:

A = 12.33 (ft) a = 1.33 (ft)


B = 12.33 (ft) b = 1.33 (ft)
h1 = 2.00 (ft) ex = -4.00 (ft)
h2 = 1.83 (ft) ey = -4.00 (ft)
h4 = 0.17 (ft)

a' = 14.00 (in)


b' = 14.00 (in)
c1 = 2.00 (in)
c2 = 2.00 (in)

1.1.3 Materials

 Concrete : CONCR_4; Characteristic strength = 4.00 ksi


Unit weight = 0.15 (kip/ft3)
 Longitudinal reinforcement : type Grade 60 Characteristic strength
= 60.00 ksi
 Transversal reinforcement : type Grade 60 Characteristic strength
= 60.00 ksi

1.1.4 Loads:

Foundation loads:
Case Nature Group N Fx Fy Mx My
(kip) (kip) (kip) (kip*ft) (kip*ft)
DL1 dead load 1 75.00 0.00 0.00 0.00 0.00
LL1 live load 1 25.00 0.00 0.00 0.00 0.00

Date : 20/09/18 Page : 1


Autodesk Robot Structural Analysis Professional 2014
Author: File: southport2.rtd
Address: Project: southport2

Backfill loads:
Case Nature Q1
(kip/ft2)

1.1.5 Combination list


1/ SLS : 1.00DL1+1.00LL1
2/ SLS : 1.00DL1
3/* ULS : 1.20DL1+1.60LL1
4/* ULS : 1.40DL1
5/* ULS : 0.90DL1
6/* SLS : 1.00DL1+1.00LL1
7/* SLS : 1.00DL1

1.2 Geotechnical design

1.2.1 Assumptions

 Foundation design for:


• Capacity
• Rotation
• Uplift
• Average settlement
 Take account of plastic redistribution of allowable stresses

1.2.2 Soil:

Soil level: N1 = 0.00 (ft)


Column pier level: Na = 0.00 (ft)
Minimum reference level: Nf = -4.00 (ft)

silty clays
• Soil level: 0.00 (ft)
• Unit weight:0.12 (kip/ft3)
• Unit weight of solid: 0.12 (kip/ft3)
• Internal friction angle: 35.0 (Deg)
• Cohesion: 0.01 (ksi)

1.2.3 Limit states

Stress calculations

Take account of plastic redistribution of allowable stresses


Soil type under foundation: not layered
Design combination SLS : 1.00DL1+1.00LL1
Load factors: 1.00 * Foundation weight
1.00 * Soil weight
Calculation results: On the foundation level
Weight of foundation and soil over it: Gr = 79.28 (kip)
Design load:
Nr = 179.28 (kip) Mx = 400.39 (kip*ft) My = -400.39 (kip*ft)
Stress in soil: 0.02 (ksi)
Design soil pressure 0.02 (ksi)
Safety factor: 1.036 > 1

Uplift

Date : 20/09/18 Page : 2


Autodesk Robot Structural Analysis Professional 2014
Author: File: southport2.rtd
Address: Project: southport2

Uplift in SLS
Design combination: SLS : 1.00DL1+1.00LL1
Load factors: 1.00 * Foundation weight
1.00 * Soil weight
Contact area: s = 3.46
slim = 1.00

Average settlement

Soil type under foundation: not layered


Design combination SLS : 1.00DL1+1.00LL1
Load factors: 1.00 * Foundation weight
1.00 * Soil weight
Weight of foundation and soil over it: Gr = 79.28 (kip)
Average stress caused by design load: q = 0.01 (ksi)
Thickness of the actively settling soil: z = 12.33 (ft)
Stress on the level z:
- Additional: zd = 0.00 (ksi)
- Caused by soil weight: z = 0.01 (ksi)
Settlement:
- Original s' = 0.27 (in)
- Secondary s'' = 0.00 (in)
- TOTAL S = 0.27 (in) < Sadm = 2.00 (in)
Safety factor: 7.319 > 1

Settlement difference

Design combination SLS : 1.00DL1+1.00LL1


Load factors: 1.00 * Foundation weight
1.00 * Soil weight
Settlement difference: S = 0.06 (in) < Sadm = 2.00 (in)
Safety factor: 35.12 > 1

Rotation

About OX axis
Design combination SLS : 1.00DL1
Load factors: 1.00 * Foundation weight
1.00 * Soil weight
Weight of foundation and soil over it: Gr = 79.28 (kip)
Design load:
Nr = 154.28 (kip) Mx = 300.39 (kip*ft) My = -300.39 (kip*ft)
Stability moment: Mstab = 652.96 (kip*ft)
Rotation moment: Mrenv = 0.00 (kip*ft)
Stability for rotation: 

About OY axis
Design combination: SLS : 1.00DL1
Load factors: 1.00 * Foundation weight
1.00 * Soil weight
Weight of foundation and soil over it: Gr = 79.28 (kip)
Design load:
Nr = 154.28 (kip) Mx = 300.39 (kip*ft) My = -300.39 (kip*ft)
Stability moment: Mstab = 652.96 (kip*ft)
Rotation moment: Mrenv = 0.00 (kip*ft)
Stability for rotation: 

Date : 20/09/18 Page : 3


Autodesk Robot Structural Analysis Professional 2014
Author: File: southport2.rtd
Address: Project: southport2

1.3 RC design

1.3.1 Assumptions

 Concrete exposed to earth and weather : no

1.3.2 Analysis of punching and shear

Punching

Design combination ULS : 1.20DL1+1.60LL1


Load factors: 0.90 * Foundation weight
0.90 * Soil weight
Design load:
Nr = 201.35 (kip) Mx = 520.35 (kip*ft) My = -520.35
(kip*ft)
Length of critical circumference: 7.47 (ft)
Punching force: 79.52 (kip)
Section effective height heff = 1.80 (ft)
Shear stress: 0.04 (ksi)
Admissible shear stress: 0.19 (ksi)
Safety factor: 4.624 > 1

1.3.3 Required reinforcement

Spread footing:

bottom:

ULS : 1.20DL1+1.60LL1
My = 37.24 (kip*ft) Asx = 0.52 (in2/ft)

ULS : 1.20DL1+1.60LL1
Mx = 37.24 (kip*ft) Asy = 0.52 (in2/ft)

As min = 0.52 (in2/ft)

top:
A'sx = 0.00 (in2/ft)
A'sy = 0.00 (in2/ft)

As min = 0.00 (in2/ft)

Column pier:
Longitudinal reinforcement A = 2.55 (in2) A min. = 2.55 (in2)
A = 2 * (Asx + Asy)
Asx = 0.64 (in2) Asy = 0.64 (in2)

1.3.4 Provided reinforcement

2.3.1 Spread footing:

Date : 20/09/18 Page : 4


Autodesk Robot Structural Analysis Professional 2014
Author: File: southport2.rtd
Address: Project: southport2

Bottom:
Along X axis:
33 Grade 60 #4 l = 12.00 (ft) e = 1*-5.31 + 32*0.33
Along Y axis:
33 Grade 60 #4 l = 12.00 (ft) e = 1*-5.31 + 32*0.33
Top:

2.3.2 Pier
Longitudinal reinforcement
Along X axis:
3 Grade 60 #5 l = 9.07 (ft) e = 1*-4.36 + 2*0.36
Along Y axis:
3 Grade 60 #5 l = 9.28 (ft) e = 1*-4.36 + 2*0.36
Transversal reinforcement
6 Grade 60 #3 l = 4.45 (ft) e = 1*0.64 + 3*0.67 + 2*0.42

2 Material survey:
 Concrete volume = 307.47 (ft3)
 Formwork = 108.42 (ft2)

 Steel Grade 60
 Total weight = 0.60 (kip)
 Density = 0.00 (kip/ft3)
 Average diameter = 0.5 (in)
 Survey according to diameters:

Diameter Length Number:


(ft)
#3 4.45 6
#4 12.00 66
#5 9.07 3
#5 9.28 3

Date : 20/09/18 Page : 5

Das könnte Ihnen auch gefallen