A. Preparation for Installation


Before installation, engineer has to confirm contents as below:
1) Installation Environment Requirements, Electrical Environment Requirements,
Temperature and Humidity Requirements are all fulfilled. (For this part,
engineer can enquire the customer or check by self)
i. Installation Environment Requirements:

ii. Electrical Environment Requirements


Power supply: AC 220/110V±10%, 50/60Hz, properly grounded.
The BS-400 analyzer should be connected to a properly grounded power socket, its
maximum power consumption is 2kVA. The power socket neutral-to-ground voltage
should less than 5V. If possible, connect the BS-400 analyzer to a power line
specially designed for medical instruments.
iii. Temperature and Humidity Requirement
The BS-400 analyzer is for indoor use only.
The bearing platform (or ground) should be level (gradient less than 1/400).
The bearing platform (or ground) should be able to bear 100Kg weight.
The installation site should be well ventilated.
The installation site should be dust free.
The installation site should be free from corrosive and flammable gases.
The bearing platform (or ground) should be free from mechanical vibration.
The installation site should be free from large noises and power
interference.
The BS-400 analyzer should not be placed near brush-type motors and
electrical contacts that are frequently turned on/off.
The BS-400 analyzer should not be exposed to direct sunshine or heat
source and wind source.
The above-sea-level height of the site should be lower than 4000 meters.
Store BS-400 analyzer in 0 ℃ ~40 ℃ environment. When the BS-400
analyzer is running, be sure to fix the ambient temperature between 15℃~
30℃ with fluctuation less than ±2℃/H.
The relative humidity should be in range of 35%RH ~ 80%RH and no
condensation.

Caution

i.When used in conditions other than the specified above, the BS-400 analyzer
may not provide reliable test results. If the temperature or relative humidity
does not meet the above-mentioned requirements, be sure to use
air-conditioning equipment.
ii.The BS-400 analyzer radiates heat from its rear side when running. A
well-ventilated environment helps keep the room temperature stable. Use
ventilation equipment if necessary. If so, be sure not to expose the BS-400
analyzer to the direct draft that may lead to unreliable results.
2) PC, monitor and printer are prepared and can be installed BS-400 operation
software and BS-400 debug software at any moment.
Note: Be sure the digital and date format of the Windows are same as them of the English
version Windows.
3) Reagent, calibrator, the tool kit, lubricating grease are prepared.
4) Tools:
a) At least 2 adjustable wrenches(one of them maximum caliber should be larger
thanΦ30 )
b) Φ2.5、Φ3 and Φ4 socket head wrench.
c) 1 unit of multimeter.
d) One Philips screw driver and one slotted screw driver.
e) One paper knife.
B. Beforehand Check:
After step A, engineer needs to go to installation site for beforehand check wok:
a) Check the delivery list for acceptance.
One wooden case for main instrument
One paper box for accessories
One paper box for high concentration tank
Water inlet module and waste outlet module
b) Make one copy of original parameter configuration list as back up. The list needs
to be kept by both engineer and end user carefully.
C. Un-package
Detach wooden case
1) Gross weight is 350 kg, totally 8 people are needed to put main unit wooden
case on ground.
2) Loose screws like below:

3) Remove top cover and other wooden parts, only wooden base is kept. .

4) Loose screws on the base.


5) Remove steel part

6) Rotates big fix screw down to

7) Then rotate fix screw and fix wheel up together until highest position.

8) Then in one piece of wood package, loose 2 screws like below, you will find
padding part at back side:
9) Install padding part to base:

10) Move the instrument down from base carefully, and move to right position

11) 123123
Move instrument to target place
Remove plastic cover and fix bandage:
Release drawer assembly
1) Loose screws as below:

2) Remove the cover at bottom part:

3) And then unscrew 9 screws like below, then remove fix part
Drawer fix board

4) Lift block part and pull out drawer assembly, check whether there are some tubes
blocked.

5) Manually open ball valve.

Opened

6) Set bottom cover back.


7) Push and pull drawer assembly to make sure nothing blocked and all tubing is in
good condition.
D. Hardware installation
1) Install sample probe.
a) Take out sample probe from the box, remember there’s a little washer included
also. Put the washer into root part of sample probe.

b) Take off the arm cover: Grab the lower parts of the arm cover with two hands and
pull them slightly outwards and remove the cover upward from the arm base.

c) Remove the retaining screw and take away the spring. Remember move the arm
to the highest position for convenient operation.

d) Insert the probe into probe arm.


e) Sleeve the spring over the pole in the probe arm, and screw the retaining screw
back onto the pole.

f) Screw the probe’s fluid connector back to the tubing connector. Note that
excessive force may bend the probe.

g) Insert the connector of the probe lead into corresponding jack on the level
detection board. The probe arm is delicate. Exercise caution when inserting the
connector. Excessive force may damage the connector and/or the level detection
board.

h) Normal condition should be like this:

i) Then push the probe upward and then release the probe to check if it can move
freely. If not, find the reason and solve the problem.

j) Install arm cover.


k) Pinch the probe by the part near the probe arm. Gently push the probe upward
and then release the probe to see if it can move freely. If not, remove the arm
cover and re-install it.

2) Install mixing bar


a) Take out mixing bar and knurled part from the box. Rotate the bar arm to the
highest position for convenient operation.

Retaining nut

Knurled part

b) Align the new mixing bar to the bigger hole end of the retaining nut and gently
screw it into the nut until the end of the bar is in line with the smaller hole end of
the nut.
Inner and outer should
keep the same level

c) Pinch the mixing bar by the knurled part 2 and align the hole of the nut to the axis
on the bar arm, then push the bar upward in the direction of the axis until it can’t
proceed.

1 rotate 2 pinch and keep lifting

d) Tighten the nut by screwing clockwise with the other hand.


e) Check whether the bar is vertical to the bar arm.
If not, remove the bar and re-install it.
If so, proceed to the next step.
f) Pull the bar arm to its highest point and rotate it to move the bar to a position
above its wash well.
3) Check reagent disc and sample disc are properly installed, 4 fixing screws are
tightly screwed.

4) Add detergent into detergent tank


There are 4 bottles of detergent for installation (1 liter per bottle).
We need to add into 2 detergent tanks, 1 bottle respectively.

5) Connect liquid tubes.


It can be divided into 2 conditions:
i. Standard setting
ii. With water inlet module and waste outlet module
i. Standard setting:
a) Take wide tubes as below, and divide into 2 equal parts(both less than 3 m),
connect to low concentration waste connecters (high concentration and low
concentration) respectively, the other sides connect to cloaca directly ,and be
sure the highest point of this part liquid way is less than 100mm.
b) Connect water source and water inlet filter with thin transparent tube.(length less
than 8 m)

c) Connect water inlet filter and BS400 with thin transparent tube.(length less than
2 m)
d) Connect high concentration tank and BS400 with green tube.
e) Connect high concentration waste tank sensor.

ii. With water inlet module and waste outlet module:


a) Take wide tubes as below, and divide into 2 equal parts(both less than 5 m),
connect to low concentration waste connecters (high concentration and low
concentration) respectively, the other sides connect to waste outlet module, and
use another tube connect to cloaca (length less than 10 m). Be sure highest
point of this part liquid way is less than 1200mm
b) Connect water source and water inlet module with thin transparent tube.(length
less than 8 m)
c) Connect water inlet module and water inlet filter with thin transparent
tube.(length less than 8 m)
d) Connect water inlet filter and BS400 with thin transparent tube.(length less than
2 m)
e) Connect high concentration tank and BS400 with green tube.
f) Connect high concentration waste tank sensor.
Attention:
Length of all the tubes should be as short as possible
Water inlet filter should be lied down on ground

f) Connect high concentration tank and BS400 with green tube.


g) Connect high concentration waste tank sensor.
6) Connect power cable, grounding wire of analyzer.
E. Run debug software
a) Turn on main switch and analyze switch.

b) Rotates VR1 to make D2 on, and then reverse rotates to make D2 off. At this
moment, liquid level detection voltage should be 3.5 V.(This process need to be
done on both sample probe and reagent probe unit)

c) Install BS-400 debug software

d) Run debug software:


e) Mechanical reset to see whether mechanical part works OK.

f) Access “fluidic unit”, open SV15 first.


1

g) Open vacuum-pressure pump, wait for 30 seconds then access “fluidic pressure
curve” tab to check whether pressure remain at normal range.

2
1
3

25PSI 10PSI 5PSI


Pressure watch
0.16 ~ 0.18MPa 0.06 ~ 0.08MPa -85 ~ -95KPa
parameter
Software -12.5±1 PSI
25±1 PSI 5±0.5 PSI
parameter

h) Keep SV15 opened, remove auto wash unit to a container (volume larger than
300ml)

i) Execute water reservoir tank affusion and probe outer wash by “system prime”.
Check whether water exists in wash well, and water supplied in water reservoir
tank. (last for about 2 minutes)

j) After water reservoir tank become enough, execute probes inner wash function.
first make sample probe and reagent probes stop at wash well, then access
“fluidic unit”, open SV02 、SV03、 SV04、 until stable water outlet from probes
then close.
1

3 4

k) Then close SV15.

l) Execute “auto dilute” function to generate enough diluted detergent A and B (3


minutes).

2 1
m) Execute wash unit diffusion by opening SV06 、SV07、 SV20、SV21,when
outlet water become stable from wash unit, close this 4 valves.
1
1

2 3

n) Install wash unit back and make system reset, check movement of all
mechanical parts.
F. Operation software installation
1) Install MSDE database
Turn on computer.。Access folder “MSDE” in system software Installation program,
Double click icon as below to start installation

2) Install system software


a) Double-click installation icon named “setup” as below:

b) Press”next” to the next step, be sure 10 G space available in target disc. Then
click “next”.

c) Press “install” button.


d) Select default language.

e) Software installation Completed.


3) Install driver and connect the printer.
G. Run operation software
a) Access software with user name: Admin, password: MINDRAY

b) Set one test as “water”, apply one test (water acts as both sample and reagent)
and duplicates 90 times, check 90 reaction curve carefully, be sure all reaction
cuvettes are in good condition.
H. System set up & Test
a) Finish test, reagent and calibrator settings on the Setup, Reagent and
Calibration screens, and then conduct a double-reagent blank.
b) Request for calibration and samples after editing them, and then debug the
results.
c) After debugging the results, fill them in the table below:
Test ALT CREA BUN
Target value
2sd range
Test value 1
Test value 2
Test value 3
Test value 4
Test value 5
Test value 6
Test value 7
Test value 8
Test value 9
Test value 10

I. Training
Can you complete daily tests? Yes □ No □
Are you familiar with the test methods such as kinetic, two-point, endpoint?
Yes □ No □
Are you familiar with the daily, weekly and monthly maintenance and relevant
maintenance methods? Yes □ No □
Are you skilled in cleaning, washing and replacing the probe and mixing bar?
Yes □ No □
Are you skilled in replacing the lamp? Yes □
No □
Do you know the positions, roles and preparation methods of acid and alkaline
detergents and diluents? Yes □ No □