Beruflich Dokumente
Kultur Dokumente
Theory:
1. What is pressure or Thrust line? Explain its significance with sketches. 14,09
2. Deduce an expression for finding the average stress in steel of an unbonded post-
tensioned beam. 15,14,13,08
3. Derive an expression for ultimate moment capacity of an under reinforced flange section.
13
4. What do you mean by bonded and unbonded tendons? 15,09
5. Discuss in brief the variation of steel stress in bonded and unbonded members.
15,14,10,09,08
6. What are the different ways of improving the shear resistance of structural concrete
members by prestressing techniques? 15
Pre-Stress Loss:
1. Discuss in brief the different types of losses in pre-stress concrete. What are the factors
influencing the loss of stress due to creep of concrete? 15,14,10
2. Deduce an expression of the loss of prestress due to elastic shortening. 15,13,10,08
3. Derive an expression for loss of prestress due to friction in a curved tendon. 09
Cracking Moment:
1. Derive and expression for cracking moment. 15,10
2. “After cracking the prestressed concrete beam beahaves essentially like an ordinary
reinforced concrete beam” – justify the statement. 09
*****