Sie sind auf Seite 1von 1

 

 
  DAILY INSPECTION REPORT 
 
 
Contract No.  TS1/FEI‐018/17  Activities :   Report No.  DR‐RE‐004‐XI‐2017
CTR No.  002/CTR/DRP/XI/2017  ROTARY & ELECTRICAL  Report Date  19/11/2017
WO No.  002/WO/DRP/XI/2017  Reported By  DZA, AH, & DM
Work Location  PHEWMO Offsshore 
EQUIPMENT INSPECTION  Review By  Dyah K 
 
Equipment List  Personnel List 
Equipment Description  Qty  Unit Personnel Name Position  Today Cum
Clamp Meter  1  ea Zulkarnaen PA 1 3
Vibration Meter  1  ea Dzulvika Rotary Inspector  1 3
Multimeter  1  ea Andiawan H Rotary Inspector  1 3
IR thermometer  1  ea Dwi Mulyono Rotary Inspector  1 3
Sound level meter  1  ea  
Laptop  2  ea  
Camera  2  ea  
 
Executive Summary : 
Carry out inspection Rotary Equipment in PPP area with tag number as follows;
No  Equipment  Tag Number 
1.  Crude Oil Pump  P‐603 A 
2.  Crude Oil Pump  P‐603 B 
3.  Crude Oil Pump  P‐603 C 
Detail activities inspection as follows; 
1. Morning Meeting at FSO PERTAMINA ABERKHA  
2. Toolbox Talk   
3. Visual inspection 
 Condition of Pump 
 Equipment Completeness 
 Construction of Pump  
 Name Plate 
 Structure and support of Foundation Pump 
 Protection of Equipment (Insulation and )Painting 
 Control and Instrumentation 
 Earthling/Grounding connection 
4. Function test  
 All Rotary Equipment Crude Oil Pump (P‐603A, P‐603B, and P‐603C) were running without load 
 Grounding connection measurement  
No  Eq Tag number  Value (Ω) Result  Remark
1  P‐603 A  0.1  Acceptable ‐
2  P‐603 B  0.5  Acceptable ‐
3  P‐603 C  0.3  Acceptable ‐
Acceptance criteria =5Ω 
 Vibration test, measurement velocity  

 
Mapping point of vibration test 
 