Beruflich Dokumente
Kultur Dokumente
DAILY INSPECTION REPORT
Contract No. TS1/FEI‐018/17 Activities : Report No. DR‐RE‐004‐XI‐2017
CTR No. 002/CTR/DRP/XI/2017 ROTARY & ELECTRICAL Report Date 19/11/2017
WO No. 002/WO/DRP/XI/2017 Reported By DZA, AH, & DM
Work Location PHEWMO Offsshore
EQUIPMENT INSPECTION Review By Dyah K
Equipment List Personnel List
Equipment Description Qty Unit Personnel Name Position Today Cum
Clamp Meter 1 ea Zulkarnaen PA 1 3
Vibration Meter 1 ea Dzulvika Rotary Inspector 1 3
Multimeter 1 ea Andiawan H Rotary Inspector 1 3
IR thermometer 1 ea Dwi Mulyono Rotary Inspector 1 3
Sound level meter 1 ea
Laptop 2 ea
Camera 2 ea
Executive Summary :
Carry out inspection Rotary Equipment in PPP area with tag number as follows;
No Equipment Tag Number
1. Crude Oil Pump P‐603 A
2. Crude Oil Pump P‐603 B
3. Crude Oil Pump P‐603 C
Detail activities inspection as follows;
1. Morning Meeting at FSO PERTAMINA ABERKHA
2. Toolbox Talk
3. Visual inspection
Condition of Pump
Equipment Completeness
Construction of Pump
Name Plate
Structure and support of Foundation Pump
Protection of Equipment (Insulation and )Painting
Control and Instrumentation
Earthling/Grounding connection
4. Function test
All Rotary Equipment Crude Oil Pump (P‐603A, P‐603B, and P‐603C) were running without load
Grounding connection measurement
No Eq Tag number Value (Ω) Result Remark
1 P‐603 A 0.1 Acceptable ‐
2 P‐603 B 0.5 Acceptable ‐
3 P‐603 C 0.3 Acceptable ‐
Acceptance criteria =5Ω
Vibration test, measurement velocity
Mapping point of vibration test
Page 1 of 4