Beruflich Dokumente
Kultur Dokumente
23/03/2018
20180324_DS
THESAVROS2 PUMPING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
THESAVROS3 PUMPING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PRODUCTION - PUMPING 3976.6 3491.5 3169.81 3182.04 2856.61 2935.94 3511.45 3480.28 3535.66 3654.16 3650.07 3637.56 3646.89 3633.4 3465.28 3510.43 3815.04 4050.93 4795.3 5545.19 5563.24 5249.59 4587.48 4231 93,176
THERMAL PRODUCTION 2308.6 2017.5 1790.81 1803.04 1589.61 1619.94 1607.45 1536.28 1611.66 1741.16 1748.07 1731.56 1785.89 1777.4 1679.28 1771.43 2037.04 2272.93 2886.3 3636.19 3614.24 3345.59 2682.48 2361 50,956
HYDRO PRODUCTION 1668 1474 1379 1379 1267 1316 1904 1944 1924 1913 1902 1906 1861 1856 1786 1739 1778 1778 1909 1909 1949 1904 1905 1870 42,220
HYDRO OVER MANDATORY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
UPWARD RESERVE 2963.4 3413.5 3297.19 3233.96 2908.39 2786.06 2876.55 2729.72 2336.34 2434.84 2437.93 2497.44 2332.11 2370.6 2528.72 3347.97 3369.36 3947.67 3186.3 2498.41 2510.36 2825.01 3420.12 3788
DOWNWARD RESERVE 482.6007 421.498 194.8121 400.0354 186.6133 216.9373 204.4519 133.2759 208.6646 338.1606 345.0738 328.565 382.8854 374.4 276.284 368.4256 452.0407 457.9281 878.304 1408.19 1386.24 1117.59 454.4787 133.292
MAX COMMITED CAPACITY 6940 6905 6467 6416 5765 5722 6388 6210 5872 6089 6088 6135 5979 6004 5994 6858.4 7184.4 7998.6 7981.6 8043.6 8073.6 8074.6 8007.6 8019.6
MIN COMMITED CAPACITY 4354 3870 3745 3502 3340 3349 3907 3927 3887 3886 3875 3859 3784 3769 3739 3712 3943 4163 4467 4697 4747 4702 4703 4678
MAX AVAILABLE CAPACITY 9213.5 9214.5 9216.5 9215.5 9214.5 9211.5 9209.5 9153.5 9150.5 9147.5 9146.5 9144.5 9144.5 9198.5 9198.5 9199.5 9200.5 9202.5 9205.5 9207.5 9208.5 9209.5 9211.5 9213.5
MIN AVAILABLE CAPACITY 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6 3126.6
NET BORDER SCHEDULES 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TOTAL
ALBANIA -250 -159 -209.54 -201 -249.69 -250 -212 -202.36 -230 -250 -250 -250 -250 -250 -250 -250 -250 -250 -250 -211 -211 -211 -250 -235 -5,582
FYROM -140 -235 -272 -242 -353 -353 -239 -235 -351 -354 -359 -359 -354 -359 -359 -359 -359 -359 -354 -285 -286 -291 -359 -303 -7,519
BULGARIA -250 -431.07 -500 -488.51 -485 -485 -318.15 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -11,458
TURKEY -50 -1 -90 -1 -98 -90 9 -11 -60 -90 -90 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -90 -1,862
ITALY 468 498 478 483 473 473 498 500 500 461.434 407.119 367.084 302.029 226.085 177.926 40.306 214 368 478.946 500 500 500 474 460 9,848
BORDER IMPORTS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TOTAL
ALBANIA -250 -211 -235 -235 -249.69 -250 -212 -220 -230 -250 -250 -250 -250 -250 -250 -250 -250 -250 -250 -231 -231 -231 -250 -235 -5,771
FYROM -150 -306 -313 -313 -363 -363 -296 -306 -361 -364 -369 -369 -364 -369 -369 -369 -369 -369 -364 -350 -350 -355 -369 -313 -8,183
BULGARIA -250 -451.07 -500 -498.51 -500 -500 -333.15 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -500 -11,533
TURKEY -50 -56 -90 -56 -98 -90 -46 -46 -60 -90 -90 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -90 -2,062
ITALY -34 -52 -72 -67 -27 -27 -2 0 0 -15 -65 -86.916 -115 -170 -190.07 -270.69 -160 -50 -15.054 0 0 0 0 -2 -1,421
BORDER EXPORTS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TOTAL
ALBANIA 0 52 25.456 34 0 0 0 17.644 0 0 0 0 0 0 0 0 0 0 0 20 20 20 0 0 189
FYROM 10 71 41 71 10 10 57 71 10 10 10 10 10 10 10 10 10 10 10 65 64 64 10 10 664
BULGARIA 0 20 0 10 15 15 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75
TURKEY 0 55 0 55 0 0 55 35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200
ITALY 502 550 550 550 500 500 500 500 500 476.434 472.119 454 417.029 396.085 368 311 374 418 494 500 500 500 474 462 11,269
CORRIDOR LIMIT 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 AVG
SOUTH-NORTH 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100
NORTH-SOUTH 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100 3100
CORRIDOR FLOW 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 AVG
SOUTH-NORTH 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NORTH-SOUTH 1038.81 1118.94 1321.77 1260.69 1438.98 1453.06 1566.8 1735.85 1809.9 1903 1918.82 1920.76 1944.64 1980.74 1892.7 1905.18 1659.53 1524.75 1313.11 1691.07 1712.32 1522.02 1591.46 1653 1620
23/03/2018
20180324_PrimaryReserve
ELPEDISON_THESS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 0
ELPEDISON_THISVI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 12 0 0 15 0 25
ALOUMINIO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PROTERGIA_CC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
KORINTHOS_POWER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 11 0 11.4 10.4 9.4 0 1
Total 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
23/03/2018
20180324_SecondaryReserve
Up 232 6.5 31 31 69.213 6.5 237 237 237 237 237 237 237 237 237 237 237 20.028 229.404 237 237 237 237 237
LAVRIO4
Down
Up
LAVRIO5
Down
Up 10 72.098 211 211 4.5 197.537 211 133.376 208.765 211 211 211 211 211 211 211 185.141 211 211 211 211 211 4
KOMOTINI
Down
Up
MEGALOPOLI_V
Down
Up
ELPEDISON_THESS
Down
Up 133.972 56.421
ELPEDISON_THISVI
Down 16.028 93.579 5.392
Up
ALOUMINIO
Down
Up
PROTERGIA_CC
Down
Up
KORINTHOS_POWER
Down 42.859 83.972 6.421
Up 250 250 250 250 250 350 600 600 600 583 583 583 583 583 583 583 600 600 600 600 600 600 600 400
Thermal Units Total
Down 100 63.598 66.912 79.135 58.713 89.037 76.552 5.376 80.765 100 100 100 100 100 100 100 100 100 100 100 100 100 100 5.392
Hydro Unit / Hour HR 01 HR 02 HR 03 HR 04 HR 05 HR 06 HR 07 HR 08 HR 09 HR 10 HR 11 HR 12 HR 13 HR 14 HR 15 HR 16 HR 17 HR 18 HR 19 HR 20 HR 21 HR 22 HR 23 HR 24
Up
KREMASTA
Down
Up
KASTRAKI
Down 36.402 33.088 20.865 41.287 10.963 23.448 94.624 19.235 94.608
Up
STRATOS1
Down
Up
ILARIONAS
Down
Up 17 17 17
POLYFYTO
Down
Up
SFIKIA
Down
Up
ASOMATA
Down
Up
THESAVROS1
Down
Up
THESAVROS2
Down
Up
THESAVROS3
Down
Up
POURNARI1
Down
Up 17 17 17 17
P_AOOU
Down
Up 17 17 17 17 17 17 17
Hydro Units Total
Down 36.402 33.088 20.865 41.287 10.963 23.448 94.624 19.235 94.608
Up 250 250 250 250 250 350 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 400
Total
Down 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
23/03/2018
20180324_TertiaryReserve
23/03/2018
20180324_GenericConstraints
ID Status Start Time End Time Unit Constraint Type Limit (MW) Energy Factor Tertiary Reserve Factor Reason
23/03/2018