WAKTU UNIT E WAHYU PURBA

NO JENIS PEKERJAAN START FINISH


(Jam) KERJA UE UK
ENGINE
1 Engine Tune Up 1.50 1.5 1 1.5 9.30 10.30
2 Uji Emisi 30 mnt 0.5 0
3 Service Injector 1.5 1.5 0
4 Scan Riset 30 mnt 0.5 0
5 O/H Top Engine 21 21 0
6 O/H Full Engine 42 42 0
7 Ganti Filter Udara 5 mnt 0.08 0
8 Ganti Filter Bahan Bakar 15 mnt 0.25 0
9 Ganti Pompa Bahan Bakar 15 mnt 0.25 0
10 Ganti Filter Oli 10 mnt 0.17 0
11 Ganti Busi 15 mnt 0.25 0
12 Ganti Oli Mesin 15 mnt 0.25 0
13 Sp Engine 1 1 1
CHASIS
1 O/H rem 1.5 1.5 1 1.5
2 Bubut Disc Brake 1 1 0.5 0.5
3 O/H Kaki-Kaki 2 2 0
4 O/H Kopling 4 4 0
5 O/H Matic Transmision 21 21 1 21
6 O/H Manual Transmision 14 14 0
7 O/H Power Steering 5 5 0
8 Flush Power Steering 1 1 0
9 Flush Matic Transmision 1 1 0
10 Spooring 30 mnt 0.5 1 0.5
11 Balancing 5 mnt 0.08 1 0.0833
12 Finish Balancing 10 mnt 0.166 1 0.166
13 Sp chasis 1 0
ELECTRICAL
1 Ganti Bohlam Lampu 5 mnt 0.08
2 Ganti Sekring 5 mnt 0.08
3 Periksa Kabel-kabel 15 mnt 0.25
4 Periksa Switch 15 mnt 0.25
5 Ganti Switch 15 mnt 0.25
6 Sp body 1
BODY
1 Cuci Biasa 30 mnt 0.50
2 Cuci Wax 1 1
3 Salon Interior 3 3
4 Salon Exterior 5 5
5 Salon Mesin 1 1
6 Salon All In 7 7
I MADE AGUS SUGIHARTONO TEZAR
START FINISH
UE UK UE UK UE UK

9.30 10.30
ARDIYANTO KHOZEN M RIDWAN GUSALIN AGASTIAN
UE UK

0 0 0
UE UK

1 7