Sie sind auf Seite 1von 7
Industry & Facilities Page : 1/5 FLASH REPORT N° 171 Date : 30/12/2010 w Interim O Finat Intervention Ref IND M4 100619-A__ DOCUMENT TRANSMITTAL To Bureau Veritas USA Date _ || 30/12/2010 Attn, |: | Mr. Catlos/Mr.Ronnie Fax | ;| Tel: +0118582075095 INDUSTRY &FACILITIES From DEPT NUMBER OF SHEETS (INCLUDING THIS ONE) : 1 +2 PROJECT’ —: SUNRISE LATTICE TOWER INSPECTION ‘SuBjecr : FLASH ; No. of SNo | DOCUMENT REF. REMARKS, Sheets 01 [Flash Report No. 171 3 - Transmitted By : Name: Deepak $.Tambare Date: 30 Dec. 2010 3 AGE 1601/3 € Page : 2/3 FLASH REPORT N° 171 Industry & Facilities Date : 30/12/2010 Interim O Final Intervention Ref IND Mod 10 0679-A lpROJECT: Transmission Tower piob No. ae Pee Eee [Contract n°/Service order n®: BV Client : San Diego Gas and Electric (Client to BY): Purchase order n= Client to Supplier) : Porehase order n= Manufacturer: Jyoti Structures Ltd, Nasik, (Supplier fo Manufacturer) pi linspection requested by: BV US / San Diego linspection Notification No. Email Rey. No. [Date ITEM DESCRIPTION: POTTEM TAG Nos Ory |See continuation sheet 6 Yes (No 7 Brief Description Of Inspection Performed: Yes NO Remarks 1. Inspection performed as per Notification Refer Annexure 12. Inspection Completed (Doc. Review) | Refer Annexure 3. Inspection performed with satisfactory results Refer annexure 4. If No, Please clarify - Is, Any NCR was issued ~ 6. NCR Pending for closing - 17. Related Documentation Reviewed (If ready) 8. Next Visit Planned RESIDENT NSPECTION ANNEXES ¥ Yes (Total number of pages: 1+ 06=7) 0 No Tssued by Name of Surveyor : Deepak S.Tumbare Date : 30 Dee. 2010 Inspection Centre: BV Nasi Diffusion: [2 BYUSA — IBV,Mumbai KBV,Nesik —-EISDGRE a 3 AGE 1601/3 € Page : 3/3 FLASH REPORT N° 171 Date : 30/12/2010 nee Tniervention Ref IND M4 10,0619-A fe ‘ANINEXURE 1 INSPECTION DATE: 30/12/2010 INSPECTION PLACE: JYOTI STRUCTURES LTD, PLANT -1, SATPUR , NASIK OBSERVATIONS: 1. Inspection in Plant-1:-As informed by M/s lyotl, there was no complete production at Fabrication as well as Galvanizing 2, Inspection in Plant-2:-Inspection Report attached.(Page No. 1 to 4) Deepak §.Tumbare 30/12/2010 3 AGE 16013 €

Das könnte Ihnen auch gefallen