Number Ok, Available, N/A) 1. Obtain/Confirm the following input/Field data parameters : i. Well ID ii. Flowing Tubing Head Pressure (FTHP) iii. Shut-in Tubing Head Pressure (SITHP) iv. Flowline Manifold Pressure (FLP) v. Liquid Flow Rate vi. Gas Flow Rate vii. Gas Oil Ratio (GOR) viii. Water Cut (%) ix. Flowline Maximum Operating Pressure. x. Operating Temperature xi. Compressibility Factor xii. Crude Oil API Gravity xiii. Viscosity (cP) xiv. Any Other relevant parameters. Obtain the following As Built Documents for Demolition purposes : As Built PFD As Built PIDs Instrument Control Philosophy Other Relevant Documents DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF A SKIDDED 600#, 4 HEADER, 24 SLOTS SEGMENTED INLET MANIFOLD AT FLOWSTATION a. Confirm the PSV- set point (if Any) b.
B. PIPING, CIVIL/STRUCTURAL
S/N Drawing Description Status (Ok, Not Comments
Number Ok, Available, N/A) 1 Identify the existing/proposed area for Manifold installation. (Take Pictures) 2 Inspect and measure the available space for existing manifold area 3 Take the measurement of the existing manifold piping configuration 4 Verify the number of manual valves on each of the manifold ligaments as well as other piping components 5 Inspect the piping components (straight run of piping, manual valves, etc) for reusability, hence identify potential hazards in continuous usage of the existing manifold.(Take Pictures) 6 Check whether the existing 4 Nos of 8 inch headers can be reused for the proposed manifold fabrication. Perform visual checks for external corrosion, leaks from the header flanges, cracks etc. Identify potential hazards (If any) in reusing the existing 8 inch headers (Take Pictures) DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF A SKIDDED 600#, 4 HEADER, 24 SLOTS SEGMENTED INLET MANIFOLD AT FLOWSTATION 7 Check the existing manifold skid whether it can be reused for new manifold fabrication. Do a visual checks to identify any form of deformation on the manifold skid beam 8 Verify whether the existing piping components on each skid of the inlet manifold are welded or flanged. Identify welding points (if any) as well as flanged points. 9 Obtain Geo technical information (soil bearing capacity, etc.) of the existing manifold area to verify for additional reinforcement (if required( 10 Measure the arrangement of existing valves, piping components on each of the manifold ligaments 11 Check the existing operator access to the manifold area …(identify for walkways, ladders etc.) Take Pictures 12 Check for drop objects issues around the manifold replacement areas 13 Identify any constructability issues or constraints.