Code Activity Physical Progress

1 2 3
USH/1 Improvement of waste  The solid waste treatment plant at Lamdeng (waste to
management including wealth) would be upgraded from “Waste to Compost”
waste to bio-energy like to “Waste to Compost &Energy”purely on PPP mode
domestic waste to biogas, without any further investment from State
electricity, etc. Government.
 120 metric tons of waste is generated which is
expected to created 1 MW of power
 Solid waste management is also done on a regional
basis funded by NLCPR.
 The regional transfer station is located at Thoubal
 Waste is collected, compacted and transferred
through PPP mode
 Under Swatch Bharat Mission Moriang and Kutching
are the 1st town to be named as “Open Defication
Free” in entire North-East
 18 towns of Manipur have been declared Open
defecation Free.

USH/2 Encourage of climate  Retrofitting of 3 earthquake damaged building in the


sensitive architectural market area.
urban infrastructures  Renovation of IMA market
 This strategy is also taken care under JNNURM
scheme. However detail physical progress is not
known.
 Capacity building activities have been done to spread
awareness about the climate sensitive architectural
urban infrastructure.
USH/3 Encourage of green  No progress has been achieved till now
buildings - Leadership in
Energy and Environmental
Design (LEED) in the line of
India Green Building Rating
System for Construction
USH/4 Implementation of Rain  No progress has been achieved till now
water harvesting as part
of building by-laws
USH/5 Decentralized policy for  No progress has been achieved till now
urban development
USH/6 Capacity building & HRD  Under NULM scheme, 3000 SHGs have been formed.
of ULBs on climate  Centers for Urban Homeless is yet another step taken
change strategies, CDPs by the Government leaving behind “zero” homeless in
(City Development Plan), the urban areas of Manipur
existing master plans, etc  Support to urban street vendors is given under this
strategy
USH/7 Improvement of drainage  The project was approved by Ministry of Urban
system Development (MoUD).
*Detail physical progress is not available
USH/8 Encouragement of public  Convergence of street light to LED light is done under
transport system, nonmotorized AMRUT Scheme.
transport
system & cycle tracks  Some activities are also covered under JNNURM
Scheme.
*Detail physical progress is not available
USH/9 Development of green As per the SLIP prepared by PDA, Manipur, a total of 6 parks
belts in the cities were proposed under AMRUT scheme. Out of these, 2 are
proposed to be developed in FY 2015-16 viz., 1) Indira Park and
2) B.T. Park, with provision for children friendly facilities.
Further development of other parks were carried out in the
following years