Sie sind auf Seite 1von 2

Federal Railroad Administration, DOT § 232.

603

Unless specifically excepted or modi- (4) AAR S–4230, ‘‘Intratrain Commu-


fied in this section, all of the other re- nication (ITC) Specification for Cable-
quirements contained in this part are Based Freight Train Control System,’’
applicable to a freight car or freight Version 3.0 (Adopted: 1999; Revised:
train equipped with an ECP brake sys- 2002, 2004);
tem. (5) AAR S–4240, ‘‘ECP Brake Equip-
ment—Approval Procedure’’ (Adopted:
§ 232.603 Design, interoperability, and 2007);
configuration management require-
ments. (6) AAR S–4250, ‘‘Performance Re-
quirements for ITC Controlled Cable-
(a) General. A freight car or freight Based Distributed Power Systems,’’
train equipped with an ECP brake sys- Version 2.0 (Adopted: 2003; Revised:
tem shall, at a minimum, meet the As- 2004);
sociation of American Railroads (AAR) (7) AAR S–4260, ‘‘ECP Brake and Wire
standards contained in the AAR Man-
Distributed Power Interoperability
ual of Standards and Recommended
Test Procedures’’ (Adopted: 2007); and
Practices related to ECP brake sys-
(8) AAR S–4270, ‘‘ECP Brake System
tems listed below; an alternate stand-
ard approved by FRA pursuant to Configuration Management’’ (Adopted:
§ 232.17; or a modified standard ap- 2008).
proved in accordance with the provi- (b) Approval. A freight train or
sions contained in paragraph (f) of this freight car equipped with an ECP brake
section. The incorporation by reference system and equipment covered by the
of the AAR standards identified in this AAR standards incorporated by ref-
section was approved by the Director of erence in this section shall not be used
the Federal Register in accordance without conditional or final approval
with 5 U.S.C. 552(a) and 1 CFR part 51. by AAR in accordance with AAR
Copies of the incorporated documents Standard S–4240, ‘‘ECP Brake Equip-
may be obtained from the Association ment—Approval Procedures’’ (2007).
of American Railroads, 50 F Street, (c) Configuration management. A rail-
NW., Washington, DC 20001, 202–639– road operating a freight train or
2100, www.aar.org. You may inspect a freight car equipped with ECP brake
copy at the Federal Railroad Adminis- systems shall adopt and comply with
tration, 1200 New Jersey Avenue, SE., the configuration management plan de-
Washington, DC, 202–493–6300 or at the veloped in accordance with the AAR
National Archives and Records Admin- standards incorporated by reference in
istration (NARA). For information on this section. FRA reserves the right to
the availability of this material at audit a manufacturer’s configuration
NARA, call 202–741–6030, or go to: http:// management plan at any time.
www.archives.gov/federallregister/ (d) Exceptions. (1) A freight car or
codeloflfederallregulations/ freight train equipped with a stand-
ibrllocations.html. The applicable alone ECP brake system shall be ex-
standards, which are incorporated into cepted from the requirement in
this regulation by reference, include § 232.103(l) referencing AAR Standard
the following: S–469–47, ‘‘Performance Specification
(1) AAR S–4200, ‘‘Electronically Con- for Freight Brakes.’’
trolled Pneumatic (ECP) Cable-Based (2) The provisions addressing the in-
Brake Systems—Performance Require- troduction of new brake system tech-
ments,’’ (Adopted 1999; Revised: 2002, nology contained in subpart F of this
2004, 2008); part are not applicable to a freight car
(2) AAR S–4210, ‘‘ECP Cable-Based or freight train equipped with an ECP
Brake System Cable, Connectors, and brake system approved by AAR in ac-
Junction Boxes—Performance Speci- cordance with paragraph (b) of this sec-
fications,’’ (Adopted: 1999; Revised 2002, tion, conditionally or otherwise, as of
2007); the effective date of this rule.
(3) AAR S–4220, ‘‘ECP Cable-Based (e) New technology. Upon written re-
jdjones on DSK8KYBLC1PROD with CFR

Brake DC Power Supply—Performance quest supported by suitable justifica-


Specification,’’ Version 2.0 (Adopted: tion and submitted pursuant to the
1999; Revised: 2002); special approval procedures in § 232.17,

631

VerDate Mar<15>2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00641 Fmt 8010 Sfmt 8010 Y:\SGML\220215.XXX 220215
§ 232.605 49 CFR Ch. II (10–1–10 Edition)

the Associate Administrator may ex- equipment and territory of the rail-
cept from the requirements of subpart road.
F of this part the testing of new ECP
brake technology, demonstration of § 232.607 Inspection and testing re-
new ECP brake technology, or both, quirements.
where testing or demonstration, or (a) Trains at initial terminal. A freight
both, will be conducted pursuant to an train operating in ECP brake mode
FRA-recognized industry standard and shall receive the following inspections
FRA is invited to monitor the testing at its point of origin (initial terminal):
or demonstration, or both. (1) A Class I brake test as described
(f) Modification of standards. The AAR in § 232.205(c) by a qualified mechanical
or other authorized representative of inspector (QMI); and
the railroad industry may seek modi- (2) A pre-departure inspection pursu-
fication of the industry standards iden- ant to part 215 of this chapter by an in-
tified in or approved pursuant to para- spector designated under § 215.11 of this
graph (a) of this section. The request chapter.
for modification will be handled and
(b) Trains en route. (1) Except for a
shall be submitted in accordance with
unit or cycle train, a train operating in
the modification procedures contained
ECP brake mode shall not operate a
in § 232.307.
distance that exceeds its destination or
§ 232.605 Training requirements. 3,500 miles, whichever is less, unless in-
spections meeting the requirements of
(a) Inspection, testing and mainte- paragraph (a) of this section are per-
nance. A railroad that operates a formed on the train.
freight car or freight train equipped
(2) A unit or cycle train operating in
with an ECP brake system and each
ECP brake mode shall receive the in-
contractor that performs inspection,
spections required in paragraph (a) of
testing, or maintenance on a freight
this section at least every 3,500 miles.
car or freight train equipped with an
ECP brake system shall adopt and (3) The greatest distance that any car
comply with a training, qualification, in a train has traveled since receiving
and designation program for its em- a Class I brake test by a qualified me-
ployees that perform inspection, test- chanical inspector will determine the
ing or maintenance of ECP brake sys- distance that the train has traveled.
tems. The training program required (4) A freight train operating in ECP
by this section shall meet the require- brake mode shall receive a Class I
ments in §§ 232.203(a), (b), (e), and (f). brake test as described in § 232.205(c) by
(b) Operating rules. A railroad oper- a qualified person at a location where
ating a freight train or freight car the train is off air for a period of more
equipped with an ECP brake system than:
shall amend its operating rules to gov- (i) 24 hours, or
ern safe train handling procedures re- (ii) 80 hours, if the train remains in-
lated to ECP brake systems and equip- accessible to the railroad and in an ex-
ment under all operating conditions tended-off-air facility. For the purpose
and shall tailor its operating rules to of this section, an extended-off-air fa-
the specific equipment and territory of cility means a location controlled by a
the railroad. sole shipper or consignee which re-
(c) Locomotive engineers. A railroad stricts access to the train and provides
operating a freight car or freight train sufficient security to deter vandalism.
equipped with an ECP brake system (c) Cars added en route. (1) Each
shall adopt and use in its training pro- freight car equipped with an ECP brake
gram under part 240 specific knowl- system that is added to a freight train
edge, skill, and ability criteria to en- operating in ECP brake mode shall re-
sure that its locomotive engineers are ceive a Class I brake test as described
fully trained with the operating rules in § 232.205(c) by a qualified person, un-
governing safe train handling proce- less all of the following are met:
jdjones on DSK8KYBLC1PROD with CFR

dures related to ECP brake systems (i) The car has received a Class I
and equipment under all operating con- brake test by a qualified mechanical
ditions and tailored to the specific inspector within the last 3,500 miles;

632

VerDate Mar<15>2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00642 Fmt 8010 Sfmt 8010 Y:\SGML\220215.XXX 220215

Das könnte Ihnen auch gefallen