AUGUST 2018
Group Assignment
Module EGK2124
Session AUG 2018
Programme DQS
Lecturer Kok Ching Wen
Coursework Type Group Assignment 1
Percentage 15%
Hand-out Date Week 3 Due Date Week 9
Student’s Details:
Group Name
Group Members & ID
Student’s Declaration:
I declare that:
I understand what is meant by plagiarism
This assignment is all my own work and I have acknowledged any use of the published or
unpublished works of other people.
I hold a copy of this assignment which I can produce if the original is lost or damaged
Lecturer’s Comments
Assessment Criteria:
Total
Category Scoring Criteria Points Score
Overall Structure and Formatting including table of 5
contents, acknowledgements & standard cover page
Organization
Information is presented in a logical sequence. 5
(15 points)
Detail Task Distribution among group members / Integrity 5
of Works
Introduction of the site location 10
Discussion on task 1 10
Discussion on task 2 10
Report Strong justification provided in the discussion 5
(45 points) Appropriate amount of material is prepared, and points 5
made reflect well their relative importance.
Reflections, recommendation and conclusion 5
Speaker maintains good eye contact with the audience 5
and is appropriately animated (e.g., gestures, moving
around, etc.).
Speaker uses a clear, audible voice. 5
Presentation Delivery is poised, controlled, and smooth. 5
(40 points) Good language skills and pronunciation are used. 5
Visual aids are well prepared, informative, effective, and 5
not distracting.
Length of presentation is within the assigned time limits. 5
Information was well communicated. 10
Score Total Points 100
Diploma QUANTITY SURVEYING
AUGUST 2018
Description of Assignment :
A contractor known as Bauer RenoBuilt Sdn Bhd was appointed to carry out renovation works
on the existing computer lab (Refer Proposed New Centre Figure 1: Floor Plan) into world
class BIM Development Centre. Prior to commencement of the work, the owner has requested
you to complete the following tasks.
Task 1 (LO3) :
1 Prepare a schedule (using Project Management Software) for the renovation works with
detailed Work Breakdown Structure include :
New works :
-electrical wiring,
-computer data cabling,
-whiteboard,
-projector
-computers and CPUs with tables and chairs
Task 2 (LO4):
Using appropriate illustration generated by BIM related software, discuss the construction
sequences of all the elemental works.
Outline of presentation:
1.Introduction
2. Site location
3. Discussion on Task 1
4. Discussion on Task 2
5. Conclusion
6. References
Submission Requirements:
- Students are required to form a group of 4-5 members.
- Duration of presentation for each group is 30 minutes including Q&A session.
Diploma QUANTITY SURVEYING
AUGUST 2018
- Each group will take turn to present during class as scheduled in Week 9.
- Bonus marks will be given for any additional information presented and Q&A
session.
- A report not more than 10 pages.
- The hardcopy of presentation slides