TOP SHEET
2
ADWEA Contract WED/TI/J/58/97 (Lot 1)
33 / 11kV SUBSTATIONS IN AL AIN AREA
1) GENERAL DATA
= 0.0842 Ohms
CT Ratio : 400-600/1A
Core – 2
Application : Instrumentation
Ratio : 400-600/1A
5
Calculation of Burden at Rated Current
1. Ammeters = 2.0 VA
Class of Accuracy = CL 1 CL 1
CT Ratio : 30/1A
Application : Instrumentation
Ratio : 30/1A
1. Ammeters = 2.0 VA
Class of Accuracy = CL 1 CL 1
CT Ratio : 600/1A
Application : Instrumentation
Ratio : 600/1A
1. Ammeters = 2.0 VA
Class of Accuracy = CL 1 CL 1
CT Ratio : 1600/1A
Application : Instrumentation
Ratio : 1600/1A
1. Ammeters = 2.0 VA
Class of Accuracy = CL 1 CL 1
CT Ratio : 1600/1A
Application : Instrumentation
Ratio : 1600/1A
1. Ammeters = 2.0 VA
Class of Accuracy = CL 1 CL 1
Ratio : 1600/1A
Vk = 2 If T (RCT + 2 RL)
Where,
T = 1/1600
= 380.263 V
Vk required = 380.263 V
.
DETAILS OF CT PARAMETER FOR CORE
Class of Accuracy = CL X CL X
11kV PTs
A. Transformer feeder
Class: 1/3P 3P
Application: Metering
2) 33kV Bus PT
Class: 1/3P 3P
DCD relay
DAD relay
Ammeter
Cable