Deira Mall, Deira Islands, Dubai, UAE
General Information
Description
of Material
ement Material
ement Material
ement Material
ement Material
te Mix Design for Substructure Concrete (50% OPC+45%GGBS+5%MS)
concrete design mix (without MCI) (54% OPC+42%GGBS+4%MS)
concrete- blinding design mix (64% OPC+36%GGBS)
R PROOFING PROTECTON SCREED DESIGN MIX(64%OPC+36%GGBS)
te Mix design for vertical elements-Super structure (64%OPC+36%GGBS)
te Mix design for vertical elements-Super structure (64%OPC+66%GGBS+3.3 % M.S)
te mix design for horizonetal elements-Super structure (64%OPC+36%GGBS)
te mix design for horizonetal elements-Super structure (64%OPC+66%GGBS)
RETE MIX DESIGN FOR VERTICAL ELEMENTS -SUBSTRUCTURE (59%OPC + 36% GGBS + 5% MS)
te mix design for structural screed C50-10 (64%OPC +36%GGBS)
ete Mix Design for SubstructureMix Code 1781 B (45%OPC + 50% GGBS + 5% MS)
concrete design mix (without MCI) mix code: 2010P (54%OPC + 42% GGBS + 4% MS)
X DESIGN C20-20 Mix Code 1165 (64% OPC+ 36% GGBS)
ete Mix Design for Substructure(Columns, Walls) Mix Code 1216 B (45%OPC + 50% GGBS + 5% MS)
ete Mix Design for Superstructure Mix Code 1130 (64%OPC + 36%GGBS)
ete Mix Design for Superstructure Mix Code 1209 (64%OPC + 36%GGBS)
ete Mix Design forStructural Screed Mix Code 1185 (64%OPC + 36%GGBS)
X DESIGN C20/05 Mix Code 2137 (64% OPC+ 36% GGBS)
sonry Block (Solid, Hollow ,Thermal insulated)
RTLAND CEMENT (opc)42.5n (Can't provide estimate)
plit the Combined amount for glazing and aluminium based on Platinum experience)
Summary - Tentative
Cost
Total Sustainable Criteria Value
Percentage Acheivement
Total Sustainable Criteria Value - Regional Materials
Percentage Acheivement
1,938,300,000.00
406,929,776.56
21%
693,425,094.19
36%
4,200,000,000.00
2,982,000,000.00
Recycled Content Regional Materials - LEED Certification