Sie sind auf Seite 1von 1

DEVELOPMENT CONSTRUCTIONS LTD.

LABORATORY TEST PARTICLE SIZE DISTRIBUTION


GEOTECHNICAL ENGINEERING LABORATORY RESULTS OF
ASTM D0422
DATE

BOREHOL
PROJECT 2 X 660 MW MAITREE STPP -[ EPC JETTY ] TEST PERFORMED BY MD. SHAHIDULLAH

E ID
LOCATION RAMPAL, BAGERHAT, KHULNA. PBH DATE
REPORT PREPARED BY TAMANNA TABASSUM
CLIENT AFCONS INFRASTRUCTURE LTD./ BHEL.

100.0 100.0
1 4
2 5
90.0 90.0
3 6
80.0 80.0

Percent Passing
Percent Passing

70.0 70.0

60.0 60.0

50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N
1 BH-5 UDS-3 40.00-40.50 0 11 89 9.6 0.8 0.01 0.00 0.00 0.11 0 0 0
2 BH-5 D34 54.00-54.45 0 91 9 3.0 1.4 0.24 0.17 0.08 0.96 0 0 0
3 BH-5 D39 61.50-61.95 0 90 10 3.7 1.5 0.28 0.18 0.08 1.14 0 0 0
4
5
6

Das könnte Ihnen auch gefallen