Beruflich Dokumente
Kultur Dokumente
BEARING / ANGLE
CORRECTED CORRECTED STN FINAL DISTANCE
STATION FACE FACE STN REMARK
MEAN VALUE MEAN BEARING (m)
LEFT RIGHT
4 00º00’00’’ 180º00’00’’ 68.441
(5)
6 274º03’00’’ 94º03’00’’ (274 º3’55’’)
85º56’05’’ -0º00’06’’ 85º55’59’’ 5 18º40’9’’ 4
4 90º00’00’’ 270º00’00’’
(5)
6 4º04’50’’ 184º04’50’’
BEARING / ANGLE
CORRECTED CORRECTED STN FINAL DISTANCE
STATION FACE FACE STN REMARK
MEAN VALUE MEAN BEARING (m)
LEFT RIGHT
3 00º00’00’’ 180º00’00’’ 87.562
(4)
5 267º02’00’’ 87º02’00’’ (267 º02’05’’)
92º57’55’’ -0 º00’07’’ 92º57’48’’ 4 291º37’58’’ 3
3 90º00’00’’ 270º00’00’’
(4)
5 357º02’10’’ 177º02’10’’
=98°41’40’’
= 178°02’57.5’’
9 = 111°08’49”
Fore Bearing of line 9-8 = 271º53’34.5’’ + 111º08’49’’ - 360
= 23º02’23.5”
Back Bearing of line 9-8 = 23º02’23.5” + 180000’00’’
= 203º02’23.5”
8 = 270°23’18”
Fore Bearing of line 8-7 = 203°02’23.5” + 270°23’18” - 360
= 113°25’41.5”
Back Bearing of line 8-7 = 113°25’41.5” + 180°00’00’’
= 293°25’41.5”
7 = 99°04’04”
Fore Bearing of line 7-6 = 293°25’41.5” + 99°04’04” - 360
= 32°29’45.5”
Back Bearing of line 7-6 = 32°29’45.5” + 180°00’00’’
= 212°29’45.5”
6 = 260°14’18”
Fore Bearing of line 6-5 = 212°29’45.5” + 260°14’18” - 360
= 112°44’3.5”
Back Bearing of line 6-5 = 112°44’3.5” + 180°00’00’’
= 292°44’3.5”
5 = 85°55’59”
Fore Bearing of line 5-4 = 292°44’3.5” + 85°55’59” - 360
= 18°40’02.5”
Back Bearing of line 5-4 = 18°40’02.5” + 180°00’00’’
= 198°40’02.5”
4 = 92°57’48”
Fore Bearing of line 4-3 = 198°40’02.5” + 92°57’48”
= 291°37’50.5”
Back Bearing of line 4-3 = 291°37’50.5” - 180°00’00’’
= 111°37’50.5”
3 = 179°19’51”
Fore Bearing of line 3-2 = 111°37’50.5” + 179°19’51”
= 290°57’41.5”
Back Bearing of line 3-2 = 290°57’41.5” - 180°00’00’’
= 110°57’41.5”
2 = 178°02’50.5”
Fore Bearing of line 2-1 = 110°57’41.5” + 178°2’50.5’’
= 289°00’32”
Back Bearing of line 2-1 = 289°00’32” - 180°00’00’’
= 109°00’32”
1 = 98°41’33”
Fore Bearing of line 1-12 = 109°00’32” + 98°41’33’’
= 207°42’05”
For site
4 = 92º57’48”
Fore Bearing of line 4-3 = 291º37’50.5’’
3 = 90º18’42’’
Fore Bearing of line 3-8 = 111º37’50.5’’ + 90º18’42’’
= 201º56’32.5’’
Back Bearing of line 3-8 = 201º56’32.5’’ - 180º0’0’’
= 21º56’32.5’’
8 = 91º29’13’’
Fore Bearing of line 8-7 = 21º56’32.5’’ + 91º29’13’’
= 113º25’45.5’’
Back Bearing of line 8-7 = 113º25’45.5’’ + 180º0’0’’
= 293º25’45.5’’
7 = 99°04’02”
Fore Bearing of line 7-6 = 293°25’45.5” + 99°04’02” - 360
= 32°29’47.5”
Back Bearing of line 7-6 = 32°29’47.5” + 180°00’00’’
= 212°29’47.5”
6 = 260°14’18”
Fore Bearing of line 6-5 = 212°29’47.5” + 260°14’18” - 360
= 112°44’05.5”
Back Bearing of line 6-5 = 112°44’05.5” + 180°00’00’’
= 292°44’05.5”
5 = 85°55’57”
Fore Bearing of line 5-4 = 292°44’05.5” + 85°55’57” - 360
= 18°40’02.5”
Back Bearing of line 5-4 = 18°40’02.5” + 180°00’00’’
= 198°40’02.5”
4 = 92º57’48”
Fore Bearing of line 4-3 = 198º40’02.5’’ + 92º57’48’’
= 291º37’50.5’’
∑L= 1216.931 386.960 386.842 404.944 404.966 386.901 386.901 404.955 404.955
Transit Rule:
Positive(+) Negative(-)
Latitude North South
Departure East West
ΔL = 0.118
ΔD = 0.022
= 0.1200
=1: 10141
≈ 1: 10141
*The result is accepted.
ΔL = 0.025
ΔD = 0.029
= 0.0383
=1: 9657
≈ 1: 9657
*The result is accepted.