Beruflich Dokumente
Kultur Dokumente
2. SSS Remittances of its SG’s/Employees for the 3 rd & 4th Quarter of 2011
must be stamped “Received” by SSS;
3. Bidders shall prepare four sets of all the documents listed in the Checklist
of Eligibility Documents to be placed in:
Envelope “B” - Annex VII (Bid Proposal) with Annex VIII (Computation of
Cost Distribution) to be placed in:
ii. Page 3 of Annex IX, Letter (I) should be “Certification of Compliance with
the Current and Prevailing Computed Cost Distribution of DOLE Region VII
in relation to the current Wage Oder No. ROVII-16 and adherence to the
Government Procurement Policy Board (GPPB) opinion that PSA can offer
an amount lower than the PADPAO/DOLE rate by reducing the agency fee
covering operational and administrative expenses in computing for its bid
prices provided that they do not go below the standard salaries and
benefits for the guards and the mandated taxes in the minimum cost
distributiion formula in conforming with existing wage law.
[SGD.]RAUL B. CHONG
Chairman-RBAC
Asst. Regional Director
Received by Bidder:
________________________
(Signature over Printed Name)
________________
Date Received