Appendix-65U
FBS Sheet
Code Description No. Notes
65U Common Scaffolding
65U1 Installation of Independent tied scaffolds U-01
65U2 Installation of Hanging/Suspended scaffolds U-02
65U3 Installation of Equipment external scaffolds U-03
65U4 Installation of Birdcage scaffolds U-04
65U5 Installation of Mobile Tower w/ Internal Ladder U-05
65U6 Installation of Equipment internal scaffold U-06
65U7 Modification of scaffolding U-07
·The scaffolds tied at every lift and every lift boarded 2: Platform m2
they may be erected to a height up to 26m, if A = Platform area (m2) = V / 2m Height
maximum 2 boarded lifts may be erected to a height
of 45 metres.
metres
·The scaffolds tied at every lift and every lift boarded
they may be erected to a height up to 26m, if
maximum 2 boarded lifts may be erected to a height
of 45 metres.
·If any independent tied scaffold requirement falls
outside of these parameters the scaffold may require
a design and calculations to be provided by a
competent person and submitted for approval before
work shall commence.
Fig-01
4/9
2: Platform
A = Platform area (m2) = L * W m2
Fig-02
5/9
Fig-03
6/9
free-standing
- Plan bracing shall be considered for free standing
Birdcage Scaffolding
Fig-04
W
H
7/9
Fig-05
8/9
Fig-06
9/9