Carriage of Materials
Preamble:
1. The provision of tipper has been made in hours where lead is known like disposal of the
materials upto 1000 m. In case where lead is variable like carriage of hot mix or
concrete mix from plants or earth from borrow areas, provision has been made in terms
of tonne-kilometer (t-km), which can be adopted as per actual conditions.
2. Provision has been made for a tractor trolley instead of tipper where dismantled
materials of sorts or material having more volume as compared with weight are required to
be transported. This arrangement will be economical.
3. The cost of carriage will vary depending upon the riding surface of the road. Prevision has
accordingly been made considering surface roads, unsurfaced graveled roads and
katcha tracks.
4. Analysis for loading has been done both for manual and mechanical means for adoption
as per actual situations.
5. Where loading is done by mechanical plant like HMP or batching plant and there is
automatic loading in tippers, provision of loading and un-loading has been made at rate
of 10 per cent of cost of carriage to account for time taken by the tipper for getting
loaded at the plant and un-loadjng in the paver or otherwise at site.
6. Although the market rates for supply of aggregates at site are generally taken for
estimation purpose, rate for crushing of aggregate have also been analysed as most of
the contractors prefer to crush their own aggregates in case of large projects exceeding
Rs.50 crores in value.
7. The cost of material shall be evaluated considering the cost at crushing plants and cost
of carriage including loading and unloading or the rates for supply at site depending
upon system being followed at particular locations. These rates should be compared
with the rates for own crushing and carriage by the construction agency.
Reference to
Sr. Rate
MoRT&H Description Unit Quantity
No. Rs.
Specifications
Loading and Unloading of Stone
1.1 Boulder/Stone Aggregates/Sand/
Kankar / Moorum
Placing tipper at loading point, loading
with front end loader, dumping, turning
for return trip, excluding time for
haulage and return trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading
point 1 Min
ii) Loading by front end loader 1 cum
bucket capacity @ 25 cum per 13 Min
hour
iii) Maneuvering, reversing, dumping 2 Min
and turning for return
iv) Waiting time, unforeseen 4 Min
contingencies, etc.
Total 20 Min
a) Machinery
Tipper 5.5 tonnes capacity Hour 0.33
Front end-loader 1 cum bucket
capacity hour @ 25 cum/hour Hour 0.33
b) Overheads % on (a)
a) Labour
Mate 0.11
Mazdoor for loading and unloading Day 0.75
b) Machinery
Tipper 5.5 tonne capacity Hour 0.75
C) Overheads @ % on (a+b)
Unit = t/km
Taking output 10 tonnes load and lead
10km =100t.km
a) Machinery
a) Machinery
b) Overheads @ % on (a)
b) Overheads© % on (a)
c) Contractor's profit @ % on
(a+b)
Cost for 100 t.km = a+b+c
Rate per t.km = (a+b+c)/100
1..5 Hand Broken Stone Aggregates 63
mm Nominal Size
Supply of quarried stone, hand
breaking into coarse aggregate 63
mm nominal size (passing 80 mm and
retained on 50 mm sieve) and
stacking as directed.
Unit = cum
Taking output = 1 cum
a) Labour
Mate Day 0.06
Mazdoor Day 1.5
b) Material
Supply of quarried stone 150-200 mm 1.10
size cum.
c) Over heads @ % on (a+b)
Unit : cum
b) Material
Stone Boulder of size 150 mm and Cum 800
below
c) Machinery
Integrated stone crusher of 200 TPH
including belt conveyor and vibrating Hour 6
screens
d) Overhead charges @ % on
(a+b+c)
e) Contractor's profit @ %on
(a+b+c+d)
Unit : cum
Taking Output = 670 cum at crusher
location
a) Labour
Mate Day 0.76
Mazdoor Skilled Day 2
Mazdoor including breaking of any Day 17
size boulder
b) Material
Stone boulder of size 150mm and Cum 800
below
c) Machinery
Integrated stone crusher of 200
TPH including belt conveyor and Hour 6
vibrating screens
Front end loader 1 cum bucket Hour 20
capacity
Tipper 5.5 cum capacity Hour 20
d) Over head charges @ %
on (a+b+c)
e) Contractor’s profit @ %
(a+b+c+d)