Beruflich Dokumente
Kultur Dokumente
As per the schematic drawings the contents in this test format can be modified
2 Yes N/A
Inspect for physical damage / defects
3 Panel condition, cleanliness, organization, labeling, readiness for Yes N/A
service, panel doors, handles...etc
4 Ct shorting checked Yes N/A
8 Confirm that each panel has been properly secured to the floor in its Yes N/A
final service location.
9 Panel earthing checked Yes N/A
10 Confirm that panels are constructed and wired as per sec relevant Yes N/A
specification.
11 Check case cover and gasket for proper seal against dust. Yes N/A
12 Check all installed equipment nameplate information for compliance Yes N/A
to approved drawings and equipment /material lists.
13 For all internal and external panel wiring, confirm that all screw Yes N/A
terminations are tight and that crimp connectors are firmly secured to
the wire and to the termination point. Ensure that no part of the wire
is bent at the termination point. Check ferrules.
14 Check that panel equipment is mounted securely and protected Yes N/A
against mal operation due to vibration, shock, etc
15 Use of ring type terminals for wire termination for current circuit Yes N/A
wires.
5. INTERLOCK TEST
Saudi Arabia – Jubail – King Abdul-Aziz St.-Business Tower 101
لألعمال101 برج-المملكة العربية السعودية – الجبيل – شارع الملك عبد العزيز
P.O. Box 9278 Code 35513CR: 2055101790- Jubail 2055101790 :ت. س35513 : الرمز البريدي9278 :ب.ص
Telefax:+966133633610 Mobile: +966569549466 +966569549466 : موبايل+966133633610 :تيليفاكس
www.remco-me.com : موقع إلكترونيinfo@remco-me.com :بريد إلكتروني
E-mail: info@remco-me.com Website: www.remco-me.com
Reliability Measures Contracting Est. مؤسسة قياسات االعتمادية للمقاوالت العامة
Electrical and Distribution of Power and maint. Of Networks لألعمال الكهربائية وتوزيع الطاقة وأعمال صيانة الشبكات
6. DC SCHEME CHECK:
8. ANNUNCIATION:
Panel Ref:
Unit name: