1. Activating SAP's Material Requirements Planning (MRP) .................................................................................... 2
2. Plant Level configuration for MRP ........................................................................................................................ 2
1.1 Maintain Environment: Number Ranges ...................................................................................................... 5
1.2 Maintain Environment: Check Rule-Backorders........................................................................................... 7
1.3 Maintain Master Data: MRP Controllers ...................................................................................................... 7
1.4 Maintain Master Data: Floats ....................................................................................................................... 8
1.5 Maintain Planned Orders: Conversion ......................................................................................................... 8
1.6 Maintain Planned Orders: Dependent Requirement Availability ................................................................. 9
1.7 Maintain Planning Run: BOM/Routing Selection ......................................................................................... 9
3. MRP Groups .......................................................................................................................................................... 9
4. Lot sizing procedure ...........................................................................................................................................11
IMG>Production > MRP > Planning File Entry > Activate MRP and Set up Planning File
T-Code: OMDU
Plant MP01 & Depot PC01 to PC08 are activated for MRP
First Maintain the Intervals for Number Range ID’s from the path given below
IMG>Production>Material Requirement Planning > Number Ranges > Define Number Ranges for Planning run
T-Code: OMI2
OMI2 Screen
Now click on each tab (in OPPQ) and maintain the number range ID’s
Now maintain
Again click on
Now click on back & then Click on and maintain the floats
Click on
Click on
Click on back
Click on
Click on
3. MRP Groups
IMG> Production> Material Requirements Planning> MRP Groups> Carry Out Overall Maintenance of MRP
Groups
T-Code: OPPR
On Maintain MRP Group screen click on and enter the required order type
while converting planned order to Process Order.
NGC_PP_MRP: IB1K900480
PP-MRP: NGDK900012