Sie sind auf Seite 1von 13

DataSystem 7

geotechnical software

Contents

Section Page

1 What is DS7? 3
2 Installation 4
Minimum PC Specification 4
Loading the Software (Upgrading to a Newer Version) 5
Loading the Software (New Installations) 5
Checking Logger Communications 5
Registration 6
3 Running the System 6
The Help System 6
Defining Your Machines 6
Performing Tests 9
4 Transducer Calibration 12
5 Industry Standard Soil Test Methods Available Under DS7 12

.
ELE International Distributor: ELE International
Chartmoor Road, Chartwell Soiltest Product Division
Business Park, Leighton Buzzard PO Box 389
Bedfordshire, LU7 4WG England Loveland, CO 80539
Sales: Civil +44 (0) 870 777 7706 USA
Sales: Env. +44 (0) 870 777 7717 phone: +1 (800) 323 1242
Service: +44 (0) 870 777 7727 fax: +1 (970) 663 9781
fax: +44 (0) 1525 249249 email: soiltest@eleusa.com
email: ele@eleint.co.uk http://www.eleusa.com
ELE International, a division of Danaher Corporation
http://www.ele.com
ELE International, a division of Danaher UK Industries Ltd

In the interests of improving and updating its equipment, ELE reserves the right to alter
specifications to equipment at any time ELE International 2007 ©

DS7 Software was created using tools protected by the following copyright: Copyright
(c)[2001] National Instruments Corporation. All Rights Reserved.

2 9901X0225 Issue 4
DataSystem 7
geotechnical software

1 What is DS7?
A complete DS7 system is a comprehensive soil testing package, consisting
of all the hardware and software required to perform a suite of mechanical soil
tests to British and American industry standards.
The DS7 software is designed to operate on a standard PC (see minimum PC
specification) with ELE’s ADU data logger and wide range of soil test
laboratory hardware. The main functions of the DS7 software are as follows:
• Input of sample information, manually or by electronic means (AGS).
• Step-by-step instructions for starting tests and test stages with built-in
functions to aid set-up calculations, where appropriate. All procedures
follow the selected international standards.
• Acquisition and real-time display of transducer data from soil test
machines, several of which may be running simultaneously.
• Analysis of test data to produce the results required by the standards,
plus other useful data.
• Generation of reports as required by the standards, but in a format which
is modifiable by the test house using a standard word processing
package such as Microsoft Word™.
• Generation of internationally accepted AGS format reports for fast
electronic transfer of results to the test house’s customers and for
integrating DS7 reports into test house’s laboratory management
systems.
• Calibration of transducers.
Those users familiar with DS7’s predecessor, DS6, will find that it has all the
facilities of DS6 plus:
• Up-to-date Windows User Interface. Runs under Windows 95, 98, ME,
2000, XP and NT.
• Conformance to BS, ASTM and AASHTO standards (user selectable).
• Easier monitoring of tests, with all relevant information on a well laid-out
screen.
• Built-in calculators where useful (eg for determining rates of strain,
weights for consolidation, etc).
• Intelligent analysis and automatic report generation using Microsoft
Word™.

3 9901X0225 Issue 4
DataSystem 7
geotechnical software

• 5-slope transducer calibration facility for higher accuracy (or simple entry
of single slope from certificate if preferred).
• Three international engineering units systems.
2 Installation
Minimum PC Specification
Your computer should be an IBM-compatible PC, have a minimum of 50
Mbyte free hard disk space and 32 Mbyte RAM installed, 64 Mbyte RAM or
more is strongly recommended. The type of processor is less important but a
200 MHz or faster is recommended. The screen resolution should be set to
800 x 600 or higher.
A CD-ROM drive is recommended for installation of the software, although it is
possible to install via a floppy disk drive.
DS7 software will run under Windows 95™, Windows 98™, Windows ME™,
Windows NT™, Windows 2000™ or Windows XP™.
To take full advantage of the advanced reporting facilities, Microsoft Word™
(Version 97 or later) should be resident on the system. This allows reports to
be generated automatically. Without Microsoft Word, the analysed data may
be loaded into a spreadsheet and reports generated manually, or the data
may be exported via the AGS protocol.
Important: Decimal Symbol
In some countries a comma (,) is typically used as a decimal symbol (eg.
11,334). DS7 cannot use a comma as the decimal symbol as many of its data
files use commas as separators between numbers (commonly called CSV
format). Thus the PC must be set to use a full stop (.) as the decimal symbol
(eg. 11.334).
The decimal symbol may be changed in the PC's Regional Settings / Number
window. For example in Windows 98, the menu selections are:
Start/Settings/Control Panel/Regional Settings/Number/Decimal Symbol. Type
'.' (without the quote marks) into the box. Other variants of Windows are
similar.
If the decimal symbol is already set to a full stop, or the change to a full stop is
made before the installation of DS7, you can proceed with the installation and
start using DS7. However, if DS7 is already installed, and the decimal symbol
needs to be changed, it will be necessary to change the symbol and then re-
install DS7 before the change will take effect.

4 9901X0225 Issue 4
DataSystem 7
geotechnical software

Loading the Software (Upgrading to a Newer Version)


If you are upgrading your DS7 program (from a previous version of DS7),
it is strongly recommended that you install the new version over the top
of the older one (i.e. in the same place on your computer). In this way, all of
your settings will be retained. These settings include transducer calibration
data, machine definitions, your security codes, test data, information on tests
currently running, engineering units, etc. If you Un-install DS7 all of your
settings will be lost.
When installing a new version of DS7 (upgrading), you will be asked whether
you wish to over-write your report templates with new versions. The
recommended action is to answer ‘Yes’ to each question – there is one
question for each template. However, if you have added your own logo to the
report templates, you may choose not to over-write them. In this case you
must check that your templates work correctly with the new DS7 program. If
they do not work correctly, you should make a back-up copy of your templates
and re-install DS7 answering ‘Yes’ to the over-write question. Once installed,
you may then modify the new templates to insert your own logo again.
Instructions on inserting your logo are contained in the DS7 Help facility (run
the program and press F1).
When upgrading from DS6 to DS7, proceed as for new installations.
If you are adding new tests to DS7, by means of a new Activation Code
obtained from ELE, you do not need to re-install your software, just type
in the Activation Code on the Help-About screen to enable the new test(s).
Apart from the above points, the re-installation procedure is the same as for
new installations.
Loading the Software (New Installations)
Insert the CD-ROM into your CD drive and run the Setup.exe file. Follow the
instructions on the screen.
You may be asked to install a ‘Run-time Engine’, but it will normally install
automatically. If you are asked, double-click the folder ‘runtime’ on the CD-
ROM and the installation will continue. The Run-time Engine comprises files
used by DS7 and normally needs to be installed only once, making future
upgrades of DS7 simpler and faster.
Once installed, connect up the data logger communications cable and switch
on. Run the DS7 program by double-clicking the icon.
Checking Logger Communications
On start-up, the program will check the communications with the data logger.
If no warnings appear, proceed with the registration of the software.

5 9901X0225 Issue 4
DataSystem 7
geotechnical software

If communication is not established, a warning will be shown and a button


labelled Logger Comm Test will appear on the screen. Cancel the ‘About’
screen, if displayed, and from the menu bar at the top of the screen, select
Configure then System Settings. Check that the Logger Comm Port is set to
the serial port used for the connection to the logger i.e. if your cable is
plugged into Com 1, check that Logger Com Port is set to COM 1. Press OK
to return to the main screen, check that the logger is switched on and
connected and then press Logger Comm Test to re-test the communications
with the data logger. If this should fail, contact your supplier of DS7.
Registration
Run the program and the registration screen (‘About’ screen) will be displayed
(if it is not displayed, select the ‘Registration’ button on the screen or select
Help-About from the options at the top of the screen to display the registration
details). Enter your company name in the box provided and press Enter
(Return) on the keyboard. Make a note of the exact company name you typed
in and the Key Code displayed on the screen. Keep these notes safe for use
in future when upgrading your software.
In order to unlock the program, contact ELE and quote your company name
and Key Code. You will then be given an Activation Code to type into the box
on the registration screen. This activation code will allow the use of all the
tests which you have purchased from ELE. Please note that each data
logger will require a different activation code.
Once your activation code has been obtained and inserted into the registration
screen, do not change the code. If you do, the activation code will no longer
be valid and your system will not work.
3 Running the System
Once the software has been registered and the laboratory hardware has been
set up, you are ready to configure the software and perform tests.
The Help System
When running DS7, please press the F1 key on your keyboard at any
time to view the built-in Help information. The Help system contains much
more detailed information than is presented in this guide and the user is
strongly advised to refer to it.
The steps necessary to set up and run the software are as follows:
Defining Your Machines
First, you need to tell DS7 about your particular soil test equipment. These
steps need only be performed when initially setting up the system or changing
your laboratory equipment:

6 9901X0225 Issue 4
DataSystem 7
geotechnical software

• Select user interface language and engineering units you would like to
use.
• Input the transducer information.
• Assign transducer channels to test machines and select which test
standards each machine will use in performing tests.
The flow chart below shows a simple representation of the steps required to
set up the system (it is not intended to be a comprehensive description of all
the available functions). The boxes down the left hand side show the main
steps to follow; in the centre are options which are shown on the screen and
on the right hand side are explanations of those options:
Remember to press F1 for Help!

7 9901X0225 Issue 4
DataSystem 7
geotechnical software

DS7 - Definition of Test Machines

Main Operations Options Description

Press F1 to obtain detailed Help!

Units Select your prefered system of units for measurements and


Check the System Settings under calculations. If you are unsure, use the SI system.
the Configure menu and change if
required. Logger Com Ports This is the serial (RS232) connector on the back of your
Write Com Port Log PC which you use to communicate with the logger

Count Down for This is a diagnostic tool for recording serial communications
Test Start and data. Leave the Com Port Log off for normal use.
Logger Beeps
This sets the number of seconds' count down at the start of
Date tests. The program will display a large count down so that the
Format start of tests can be synchronised with manual switching of test
equipment. Select 'Beeps' on to get an audible signal from the
Select Transducers under the logger.
Configure menu to enter the details
Select English or American date formats
of your transducers into DS7.The 1) Select
information is entered or edited in Logger Channel
the large black Edit box at the top of
the screen. Follow the steps 2) Transducer # Enter the physical logger channel number, transducer serial
marked 1) to 4) on the screen and & Type number and select the transducer type from the pull-doen
press Apply to enter your changes menu.
3) Enter Cal Data
into the transducer table in the OR Calibrate
lower part of the screen. Press OK Normally, the calibration factor is read from the transducer
to save your changes. calibration certificate and entered directly (Enter Cal Data).
There is also a mult-slope calibration facility built into DS7 if
4) Polarity requited (Calibrate Transducer).
Change the polarity to make your transducer read in the disired
direction. Some tests (eg 1-D consolidation) use the
transducer in reverse - set the polarity to suit.

Select the logger channel number and then click 'Display


You can now select Monitor Transducer' to see the live reading. The transducer channel
Display
may be re-initialised by pressing the 'Reset' button (Dot not
Transducers to check that all is Transducer
reset a channel which is currently being used in a test or you
well or Display Range
will corrupt you data).
Select a range of transducers to display more than one.

Enter the name which you would like DS7 to use when referring
to your test machine (for example "Consol 1"). Note: different
tests which are performed on the same physical machine
should be individually defined within DS7 as separate
Set-up
machines.
New
Then press 'Select Test Type' .
Machine
This option to tells the program what sort of tests the machine
Define your machine set-up by
will carry out and which standard will be used. After setting
selecting Machines under the Select Test
these, select the logger channels to which the appropriate
Configure menu. Type
transducers have been allocated and press 'Apply' to check that
Default the correct transducer has been recalled. When the machine
Machine set-up is complete, press 'OK' and save the information.
Parameters
Delete This sets some default parameters for the machine. They can
Machine usually be changed during the tests if required, but it is
Set-up recommended that you set them here.

Ready For Tests This option must be used with caution. It is used to de-allocate
all transducers associated with the machine. The transducer
information will be left unchanged, but they will no longer be
allocated to the selected machine.

8 9901X0225 Issue 4
DataSystem 7
geotechnical software

Performing Tests
These steps are performed for each new test:
• Input the sample / specimen and job information.
• Input initial conditions.
• Run the tests.
• Analyse the results.
• Produce reports. (Note that MS Word should be installed on the PC in
order to produce reports).
The flow chart below shows a simple representation of the steps required to
perform tests (it is not intended to be a comprehensive description of all the
available functions). The boxes down the left hand side show the main steps
to follow, in the centre are options which are shown on the screen and on the
right hand side are explanations of those options:
Remember to press F1 for Help!

9 9901X0225 Issue 4
DataSystem 7
geotechnical software

DS7 - Running Tests

Main Operations Options Description

A list of all configured machines is shown. Machines which are already


being used for another test are greyed out and shown as not available.
Use the mouse to press the New New Test Highlight the machine to be used for the new test using the mouse and
Selection then press the button marked Select a Machine for the Test
Test button on the opening screen
(front panel) Return to Main
Menu
Return to the front panel screen without selecting a machine for a new
test.

This option saves typing: If details of a similar specimen have already


been entered for another test, use this option to recall those details and
then edit them to suit the new specimen.
Load Existing
Sample
Complete the Sample Identification Saves the information on the form and allows the test to start.
Ok (Note: the details on the form can be amended at any time during the
Form
test).
Cancel

Return to the front panel and do not set up a new test.

Monitor the selected test. The Monitor screen is where all tests are
controlled.

Current Tests Selection Ok


This page shows a list of all tests
currently running, including the new one Edit Raw Manually modify data that has been retrieved from the logger. Use this
being set-up. Select the new test and Data option to correct erroneous data or to delete a test stage or an entire test.
press Ok. Use these facilities with caution!
Cancel

Return to the fron panel without monitoring a test.

Although test stages may be repeated and executed in any order, it is


recommended that the 'Test Initialisation' is executed first. This sets up
the initial parameters for the test. (Any parameters not known at the test
start may be entered later). The test standards define the order of the
remaining test stages.
Test Monitoring Start / End Test
This screen provides control and Stage
monitoring of each test as it progresses. Return to the front panel
Return to this screen at any time by OK
selecting Monitor Tests from the front Full
panel. Screen Show the Real-Time Graphs on a larger scale for inspection or printing.
Current Test Data points may be observed to determine exact values.
Details

This displays the Sample Identification Form. Parameters may be added


or edited. It is not recommended to edit items marked with an asterisk in
this screen because some file names depend on these parameters.
Continued on next page

10 9901X0225 Issue 4
DataSystem 7
geotechnical software

DS7 - Running Tests (continued)


From previous page

This button re-displays the files found in the working directory. It is used
to update the screen after files have been renamed or moved or created.
Normally screen refreshes happen automatically.
Refresh Files

This button allows the selection of the folder which contains the data files
to be analysed or reportedt. By default all data files are stored in a logical
folder structure under the top level folder 'Raw Completed Tests'
Analysis & Reports Browse Directories Press Select Cur Dir to select the desired folder
Select this button on the front panel to go
to the analysis and reporting area. Analysis of raw data is required after each test in order to produce the
After the physical test has finished, the required data for the report. Data files ready for analysis are shown in the
results have to be analysed in order to Analyse Test Raw Tests Analysis box..
produce the results required by the
standards.
The analysis and reporting stages are Specimen Details Press this button to view or edit the sample, specimen or test details of
quite separate from the physical testing the currently selected data file.
and may even be performed on a
separate computer, if required. The
Generate Report This option automatically reads analysed data files and produces a report
analysis and reporting may be re-run at
any time as long as the raw data is still to the selected test standard in MS Word format. When the report is
present. finished, the Test Analysis screen is displayed but the report document
will still be open in Word.
The reporting function is automatic and
requires Microsoft Word(TM) to be Specimen Grouping
installed on the computer. Do not attempt
Use this option to select a group of analysed data files from several tests
to operate Word whilst the report when producing a summary report such as Mohr Circles after a set of
generation is executing. triaxial tests.
Open Report

Load MS Word and open the selected report.

AGS Export
This option allows all relevant files of a particular job to be exported in
AGS format. This option is useful for transferring test results
OK electronically in an industry-standard format.

Return to the front panel.

Tests, Analysis and Reports


Finished
Remember to press F1 for more
detailed Help from within the DS7
program!

11 9901X0225 Issue 4
DataSystem 7
geotechnical software

4 Transducer Calibration
DS7 can be used to perform a 5 slope calibration on transducers, if required.
This facility is recommended for experienced technicians only. There is also a
facility to input single slope calibration constants which are printed on the
transducer calibration certificate. For most users, this will be the preferred
method.
Select Transducers from the Configure menu to access the calibration
screens. Please refer to the Help information within the DS7 program (press
F1) for more detailed information.
5 Industry Standard Soil Test Methods Available under DS7
The following test methods are available, grouped into product packages as
shown. For example, order package ‘E’ for both CU and CD Effective Stress
tests.

Product Description Reference


Package
BS ASTM
AASHTO
B Permeability in a triaxial cell. 1377: Part 6, cl 6 N/A
C Shear strength by direct shear 1377: Part 7, cl 4 D3080-98
(small shearbox). T236-92
Undrained shear strength in 1377: Part 7, cl 8 D2850-95
D triaxial compression (QUTXL).
(Quick T296-94
Undrained) Undrained shear strength in 1377: Part 7, cl 9 N/A
triaxial compression (QUTXL)
Multi-Stage.
CU triaxial compression test with 1377: Part 8, cl 5, 6 D4767-95
measurement of pore pressure &7 T297-94
E including saturation and
(Effective consolidation.
Stress) CD triaxial compression test with 1377: Part 8, cl 5, 6 N/A
measurement of volume change &8
including saturation and
consolidation.
F California Bearing Ratio (CBR) 1377: Part 4, cl 7 D1883-99
D3668-78
T193-98
G One-dimensional consolidation 1377: Part 5, cl 3 D2435-96
properties (Oedometer) T216-94

12 9901X0225 Issue 4
DataSystem 7
geotechnical software

Das könnte Ihnen auch gefallen