Observations are based on the inputs provided by Consultants Dr. Nirali, Azim and Surendran. The
trio Witnessed the site and made following observations:
1. 2 Nos Daikin Out Door Unit (1.5 Ton & 2 Ton Capacity). One was displaced from its original position
and other remained in the same place.
2. Water droplets dripping from the drain pipe due to which a layer of algae formed over time which
shows that there was prolonged dripping of water from the drain water outlet pipe.
3. Wooden Ceiling was completely Burnt and Charred – due to fire.
4. Power Cable Insulation Burnt and charred but no localized melting of copper wire found.
5. A Thin cardboard found up above the wooden ceiling.
6. The Blower Louver rails were completely charred due to fire.
7. One outdoor unit top was partly got melted due to exposure of high heat debris fallen from the
wooden ceiling.
8. The Terminals of the capacitor in One of the Aircon(2Ton) outdoor unit got Charred.
Way Forward
1. Need In-depth Review after Obtaining Relevant Documents from Hotel Management.
2. After Dismantling the Indoor Unit,
a. Need to extract the outdoor unit, power up the FAN for its working status.
b. The capacitor should be retrieved and check for its capacitance value.
c. The Compressor Should be checked for its working condition and amperage intake.
d. the PCB Sensor Board Should be retrieved and check for any possible short circuit or
abnormal component breakdown.
3. Need to verify the incident report and check the actual report call to the reception about the
Nature of complaint provided by the guest to attend with the aircon functioning.