Beruflich Dokumente
Kultur Dokumente
'ril
4,
C.
ii*il'#"*".
trt \Mill staY the
It ryill decrease.
'.
r
I 6 th. :Wben considering the pressure exerted on the casing shoe when killing a well, .which of
the fotlowing statements is conect when comparing the Driller's Method with the Wait &
IVeight Metbod?
,'
W- *rWait & Weight metbod can. give the lowest casing sbbe pressne wheu the opear
ffi rlti"g voh:me.
hole volume is greater than the
B. The Wait & Weight^method,.wilt,ailwayp grVe-a lower maximum pressure on the
casing shoe than the Driller's Metbod.
C. fte casing sho8pres$,re wiU A*ays be the same, regardless of the method used-
D. The Wait & Weight rnetliod wil giye the lowest casing shoepressure when the ope,ri
' hole annulus'volume is smaller thao tho drill string iolume. ..
E. The Drillet's.method will'give the lowest casing shoe.pressure wh.en ttre ope,n hole
a''nulus volurire is larger than the drill shing volt me.
1 65 . How should the choke manifold be set up for tle soft shut in procedure while drilting?
A. BOP side outlet hydraulic choke line valve closed.
Choke line opeir thr. ough manually operated choke valve.
Manual choke closed.
166., How should tlie choke manifola be set up for the hard slut in prgcedure while drilliag?
A. BO? side oltlethydraulic choke lineValve open.
Re,mote choke open.
Valve upsteam mud gas separator closed.