ITEM DENOMINACION UNIDAD VECES LARGO ANCHO ALTO PARCIAL

01.00 TRABAJOS PRELIMINARES


01.01 TRAZO, NIVELES Y REPLANTEO DE VEREDAS M2

* veredas
Jr. A. Revoredo 1.00 520.00 520.00
Jr. Saenz Peña 1.00 115.00 115.00
1.00 11.00 11.00
Calle Simón Bolivar 1.00 120.00 120.00
1.00 30.00 30.00
02.00 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION
02.01.01 EXCAVACION PARA VEREDA Y SARDINEL M3

* veredas
Jr. A. Revoredo 1.00 520.00 0.20 104.00
Jr. Saenz Peña 1.00 115.00 0.20 23.00
1.00 11.00 0.20 2.20
Calle Simón Bolivar 1.00 120.00 0.20 24.00
1.00 30.00 0.20 6.00
* Sardinel
1.00 790.00 0.15 0.50 59.25
02.02 ELIMINACION DE MATERIAL
02.02.01 A). CARGUIO DE MAT. EXEDENTE M3

CARGUIO DE MAT. EXEDENTE 1.35 218.45 294.91


02.02.02 B). TRANSPORTE DE MET. EXEDENTE M3

TRANSPORTE DE MAT. EXEDENTE 1.35 218.45 294.91


03.00 SUB BASE GRANULAR
03.01 EXTRACION DE SUB BASE M3

* veredas
Jr. A. Revoredo 1.40 520.00 0.10 72.80
Jr. Saenz Peña 1.40 115.00 0.10 16.10
1.40 11.00 0.10 1.54
Calle Simón Bolivar 1.40 120.00 0.10 16.80
1.40 30.00 0.10 4.20
03.02 SELEC.DE MAT.P/SUB BASE GRANULAR - ZARAN M3

* veredas
Jr. A. Revoredo 1.35 520.00 0.10 70.20
Jr. Saenz Peña 1.35 115.00 0.10 15.53
1.35 11.00 0.10 1.49
Calle Simón Bolivar 1.35 120.00 0.10 16.20
1.35 30.00 0.10 4.05
03.03 CARGIO Y TRANSPORTE
03.03.01 A). CARGUIO M3

A). CARGUIO 1.00 107.46 107.46


03.03.02 B). TRANSPORTE M3

B). TRANSPORTE 1.00 107.46 107.46


03.04 EXT. RIEGO Y COMPAC. DE S-BASE E=0.10 M2

* veredas
Jr. A. Revoredo 1.00 520.00 520.00
Jr. Saenz Peña 1.00 115.00 115.00
1.00 11.00 11.00
Calle Simón Bolivar 1.00 120.00 120.00
1.00 30.00 30.00
04.00 SARDINEL EXPUESTO
04.01 SARDINEL
04.01.01 SARDINEL EXPUES. CONCRETO F'C=210KG/CM² M3

* Sardinel 1.00 790.00 0.15 0.50 59.25


04.01.02 SARDINEL EXPUES. ENCOFRADO Y DESENCOFRADO M2

* Sardinel 2.00 790.00 0.50 790.00


05.00 ACERA PEATONAL
05.01 VEREDAS
05.01.01 VEREDA CONCRETO F'C=210 KG/CM² M3

* veredas
Jr. A. Revoredo 1.00 520.00 0.10 52.00
Jr. Saenz Peña 1.00 115.00 0.10 11.50
1.00 11.00 0.10 1.10
Calle Simón Bolivar 1.00 120.00 0.10 12.00
1.00 30.00 0.10 3.00
05.01.02 VEREDA ENCOFRADO Y DESENCOFRADO M2

1.00 565.00 0.10 56.50


05.02 RAMPAS
05.02.01 ENCOFRADO Y DESENCOFRADO P/ RAMPAS M2

ENCOFRADO Y DESENCOFRADO P/ RAMPAS 8.00 5.60 0.10 4.48


05.02.02 CONCRETO SIMPLE F'C=210 KG/CM² RAMPAS M2

CONCRETO SIMPLE F'C=210 KG/CM² RAMPAS 8.00 1.10 1.00 0.10 0.88
05.03 VEREDA CON ADOQUINNES DE CONCRETO M2

* veredas
Jr. A. Revoredo 1.00 410.00 410.00
Jr. Saenz Peña 1.00 115.00 115.00
1.00 11.00 11.00
Calle Simón Bolivar 1.00 120.00 120.00
1.00 30.00 30.00
05.04 VEREDA ENCHAPADA EN PIEDRA CANTO RODADO HORIZONTA M2

* veredas
Jr. A. Revoredo 1.00 22.50 22.50
05.05 VEREDA ENCHAPADA EN PIEDRA CANTO RODADO VERTICA M2

* veredas
Jr. A. Revoredo 1.00 7.60 7.60
05.06 ESTACIONAMIENTO CON ADOQUINES ECOLOGICOS M2

* estacionamiento
Jr. Saenz Peña 1.00 90.00 90.00
Calle Simón Bolivar 1.00 100.00 100.00
Jr. A. Revoredo 1.00 100.00 100.00
06.00 SELLADO DE JUNTAS
06.01 RELLENO DE JUNTAS ML

* Sardinel 267.00 0.50 133.50


* Veredas 105.00 1.80 189.00
DO DEL DIST. DE ACOBAMBA, PROV. DE ACOBAMBA - DPTO DE HVCA.
COBAMBA

SUB-TOTAL

796.00

218.45

294.91

294.91

111.44
107.47

107.46

107.46

796.00

59.25

790.00

79.60

56.50

4.48

0.88

686.00
22.50

7.60

290.00

322.50