Sie sind auf Seite 1von 5

Synopsis

for Thesis
topic

2018

IISER , TIRUPATI

NAME- NEDA KANEEZ

ROLL NO.- (1476681007)

BRANCH- B.Arch
TOPIC – 1

Introduction

Name of project: IISER , TIRUPATI

Lcation of project: Gorakhpur, Uttar Pradesh

Client: Awas Vikas Pradhikaran, Gorakhpur Uttar Pradesh

Site information (area): 100 acres


Requirements Under Phase-I

FACILITIES APPROX. BUILT-UP AREA


(in Sq.m)
Academic Zone Buildings 40,000
Student's Hostels & Sport Facilities 60,000
Residential Zone Buildings 20,000
Total approx. Plinth area 1,20,000

Description:
The present campus of IISER is a temporary campus and is located at Transit Campus
at Sree Rama Engineering College Building,Tirupati hence for more ease and comfort
the Ministry of Human Resources Development, Government of India decided to
provide a permanent campus for the same.
Hence Government of Andhra Pradesh has allotted about 250 acre of land for
developing Permanent Campus For IISER Tirupati at Jaganpalli village on Yerpedu –
Venkatagiri Road about 25 Km from Tirupati, Andhra Pradesh.

Under Phase-I, Initially academic campus shall cater to about 2000 students in different
academic streams and this figure may increase as and when new programmes are
started. As per the approved norms the Institute shall have faculty strength of about 200
and admin staff of about 150 Nos. Taking into account staff family and other support
staff the campus shall cater to about 4000 persons.

Statement clarifying reason for taking up the topic/personal interest and liking in
doing the project:
The purpose of choosing this topic is that I wanted to build a green, sustainable campus
with infrastructures, state of art academic teaching and research facilities, ambience
conducive for achievement of the Vision and surpass successively.

As it has been observed in the past, mostly the institutional buildings are simple. They
neither had an interesting view, sustainable campus, nor soothing environment ,so I
want to make a building that has all these feature to fulfill these demarits .
Spatial Requirements:
 Academic Buildings:
i. Lecture Halls, Tutorial/ Class room, Virtual Studio
ii. Under Graduate & Post Graduate Labs, Central Research Facilities,
Computer Center, Workshops,Research & Development Labs.
iii. Faculty Chambers and department office, Seminar/Interaction rooms.
iv. Design of Science Research labs and Advance Research
Lab,Cleanrooms, NMR Labs, Animal house facility.

 Residential Buildings:
i. Students Residential Complex: Student hostels for Boys,Girls,Married
Accommodation for Research scholars.
ii. Staff Residential Complex: Residential facility for faculty, officers & staff of
the Institute.

 Other :
i. Administrative block and Special buildings like State of the Art Sports
Complex,Convocation Center/ Auditorium, Library building, Central
Workshop,Guest House, Dining Halls, Canteens, School, Security
Barracks, Utility buildings, other campus amenities, etc.

Status of project and background: Proposed 2017


Aims and objectives of project:
a) Provide sustainability policies to promote sustainable design and operation of
campus
b) functions;
c) Maximize the potential of the site;
d) Minimize the energy and resource consumption;
e) Use environment-friendly products and materials;
f) Enhance indoor environmental quality;
g) Optimize operational and maintenance practices;
h) Suggest a strategy wherein the performance of all of the above (and, perhaps,
any others) can be continuously monitored and evaluated.

Relevant case studies:


1. IISER , PUNE
2. IISER, KOLKATA

Source of project information: From Internet


Undretaking- to be produced and signed as:

“ I, name of the student do hereby pledge that the information submitted


by me is exclusively by my own efforts and is not partially or totally a copy of either
some academic efforts by someone else in the past or present. I also promise to
immediately submit any literature or material of a similar academic thesis project- by a
body else- to my guide , should I come to have possession of during the course of my
work. I also agree that should I be found guilty of using unfair means completing the
thesis either by copying or trying to copy someone else’s academic content or some
professional work, I shall be instantly debarred from further continuation in the thesis.”

Sign of student Date

Das könnte Ihnen auch gefallen