Sie sind auf Seite 1von 9

Risk Assessment

Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
1 Survey works Slip, trip & falls. Injury. 3 2 6  Surveyed area shall be barricaded. 1 2 2
 Banks man shall be provided to guide
the site traffic, where there is movement
of vehicles.
 High visibility vest and job suitable PPE
shall be worn.
 Protruding rebar shall be capped.
 Steel rods used for marking shall be
protected and warning tape shall be tied
to warn pedestrians.
High temperature. 2 3 6 1 3 3
Heat exhaustion.  Ensure there is adequate drinking water
is available.
 Provide suitable and sufficient, shaded
rest areas.
 Frequent resting time
2 Excavation Cave-in, Collapse Injury, Property 3 3 9  Excavation shall be done only with valid 1 3 3
of edge of the excavation permit.
damage.
excavation.  If using Backhoe the following
precautions shall be followed:
 Backhoe shall be away from excavation
Pits/ Trench.
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
 Banks man shall be guided all the
movements of Backhoe.
 Soil must be kept at least 1 meter away
from the edge of excavation.
 Excavation shall be provided with
shoring/sloping or benching to avoid
collapse according to the soil condition.
 The excavated soil shall be removed on
daily basis.
 All excavations shall be properly
barricaded and provide warning signs.
 Ground condition shall be checked,
equipment and materials shall be placed
sufficiently away from the edge of the
excavation.
4. 4 4 16 1 4 4
Using of grinder & Dust, fumes, Physical illness,  All electric power tools shall be
steel cutting burning metal Injury, fire, burns. operated by trained and experienced
machine. sparks, flying personnel only.
materials, electric
 Use only electric power tools with
shock & noise.
inspection tag.
 Electrical connection shall be given
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
through ELCB.
 Use appropriate PPE’s (leather gloves,
safety goggles, dust mask or equivalent,
ear plugs/muff).
 Use fire blankets for covering the steel
cutting area and remove all combustible
materials from the hot work area.
 Provide appropriate fire extinguisher
(DCP) at work area.
 Do not keep the fire extinguisher very
near to the hot work area.
 Training shall be provided for the
worker using power tools.
5. Damage to property, 3 4 12 1 4 4
Wall Shutter Collapse of shutter.  Tool box talk shall be conducted prior to
Erection, & Injury. start the job.
Dismantle.
 Area shall be barricade properly.
 All shutter to be erected/ dismantled by
competent supervisor by a competent
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
person.
 Make sure that shutter is regularly
inspected to be used.
3 4 12 1 4 4
Fall through in- Injury, Property  Do not overload platform with personnel
complete, damage. and equipment, always use full body
unprotected work safety harness while working area
platforms or board
failure.
3 4 12 1 4 4
Fall of person from Injury.  Do not carry any material in hand while
ladder. using ladder.
 Three point contacts shall be maintained
while using ladder.
 Ladder rungs shall be free from
grease/oil etc.
Falling objects. Injury, Property 3 4 12 1 4 4
 Excavation area shall be barricaded and
damage.
warning signs to be provided. All the
materials shall be secured properly.
 Remove all unwanted materials from the
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
working area..
6. 3 3 9 1 3 3
Concrete pump Unstable ground Injury.  Concrete pump shall be placed on a
positioning. collapse of boom/ leveled area. Road plates shall be
outrigger. Damage provided below outrigger mats if
to plant / property. required. Concrete pumps shall be
placed away from existing facilities.
 All heavy vehicles shall drive slowly in
the construction area and follow a pre-
determined route for entry and exit.
7. 3 3 9 1 3 3
Concreting. Concrete splashing Concrete burns, Eye  Appropriate hand gloves (rubber) safety,
into the eyes, the injury. mask, disposable coverall and safety
hands and feet. glasses shall be used for concrete
pouring and finishing works.
 Only essential personnel shall be
involved in the pumping operation.
Crew members shall not stand under the
direct flow of concrete being pumped.
Many injuries can cause when the pump
boom is shifted from one location to
another due to residual concrete in the
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
line.
 Rotate the crew when continuous
concrete pouring is carried out.
 Provide adequate lighting for night time
concreting.

Entrapment of legs. Injury, 2 3 6  While working on rebar, place minimum 1 3 3


Displacement of two planks to prevent entrapment of legs
rebar. between rebar and also to distribute the
load.
3 3 9 1 3 3
Incorrect manual Back injury.  Proper manual handling procedure shall
handling. be applied.
 Ensure that there are enough crew
members before lifting the load.
 Bend your legs and not your back to lift
any load.
 Don’t jerk or make any awkward
movements while carrying/lifting the
load. Training of manual handling shall
be provided to the workers.
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
8. 3 3 9 1 3 3
Using of Vibrator High vibration, Deafness, Migraine,  Trained and competent person for the
Noise Numbness, tingling job. Appropriate PPE shall be used
sensation or (Rubber gloves, ear plugs etc.) and job
whiteness of part of rotation shall be done.
the fingers and
Disability.
3 3 9 1 3 3
Contact with high Severe injury  Concrete gang should wear a safety
pressure concrete broken limbs, burns helmet, safety footwear, impervious
going into eyes, to the skin, eye gloves, high impact goggles and high
face, exposed skin damage. visibility clothing.
due to standing or
 All personnel should remain clear of the
working in front of
delivery hose and placing boom. Under
end.
no circumstances should any
unauthorized personnel attempt to open
the pipeline while suspended and in
operation.
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
9. 3 4 12 1 4 4
Reversing mixer Entrapment/ Injury.  Trained Banks man to be in-attendance
truck. Crushing. while reversing concrete mixers at all
times.
 All equipments shall maintain safe
distances from each other and fitted with
audible reverse alarm.
11. 2 2 4 1 2 2
Concrete curing. Slips trip and fall. Injury, damage to  Maintain safe access, keep the area
equipment. clean. Proper positioning of workers
shall be observed.
 After curing the concrete all the hessian
cloths shall be removed from the site
and stacked properly in laydown area.
12. 2 2 4 1 2 2
Concrete Inhaling, contact Injury.  Conduct tool-box meeting discuss the
protection with skin, fire, precautions stipulated in MSDS. Use
bituminous paint/ collapse. suitable PPE for the job.
boards and epoxy
painting.
Risk Assessment
Date : 03-05-2018
CONSTRUCTION OF MANHOLE AND CHAMBER

INITIAL RESUDIAL

1-5

1-5
Risk Level 1-25

Risk Level 1-25


1-5

1-5
Process
Sr. No Potential Hazards Risk Involved Risk Control Measure
Activity

Probability

Probability
Severity

Severity
13. 2 3 6 1 3 3
Backfilling, Equipment hitting Injury, property  Trained operator shall only be assigned
compaction using people. damage. for the operation of plate/ jumping
plate or jumping compactor. Ear plug shall be worn.
compactor.
 Use well maintained equipment.