Sie sind auf Seite 1von 182

Specification for 11kV and 33kV Overhead Lines OHL-03-099

of Unearthed Construction on Issue 2


Single and “H” Type Wood Poles

1. SCOPE

Specification for 11kV and 33kV overhead power lines of unearthed construction employing AAAC
conductors, supported on single and “H” type wood pole supports.

2. ISSUE RECORD

This is a Reference document. The current version is held on the EN Document Library.

It is your responsibility to ensure you work to the current version.

Issue Date Issue No. Author Amendment Details


May 2007 1 L Campbell Initial Issue
Drawing No. SP4009862 page 203
Amendment to
Aug 2008 L Campbell amended to include method for single
issue 1
stays attachment option
Significant review to align with
March 2018 2 Ewan Gilliland contemporary practices and editorial
changes where necessary

3. ISSUE AUTHORITY

Author Owner Issue Authority


Ewan Gilliland Frank Berry Fraser Ainslie
Senior Standards Engineer Circuits Manager Head of Engineering Design
and Standards
Digitally signed by
Fraser Ainslie
DN: cn=Fraser
Ainslie, o, ou,
email=fraser.ainslie
@spenergynetworks
.co.uk, c=GB
Date: 2018.06.04
16:24:23 +01'00'

4. REVIEW

This is a Reference document which has a 3 year retention period after which a reminder will be
issued to review and extend retention or archive.

5. DISTRIBUTION

This document is part of the Construction, SPD and SPM System Design Virtual Manuals maintained
by Document Control but does not have a maintained distribution list. It is also published on the SP
Energy Networks’ website.

© SP Power Systems Ltd Page 1 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

6. CONTENTS

1. SCOPE ..................................................................................................................................................... 1
2. ISSUE RECORD ...................................................................................................................................... 1
3. ISSUE AUTHORITY ................................................................................................................................. 1
4. REVIEW.................................................................................................................................................... 1
5. DISTRIBUTION ........................................................................................................................................ 1
6. CONTENTS .............................................................................................................................................. 2
7. DEFINITIONS ........................................................................................................................................... 9
8. REFERENCES ....................................................................................................................................... 11
9. INTRODUCTION .................................................................................................................................... 13
10. DESIGN DATA ....................................................................................................................................... 14
10.1 Design Basis............................................................................................................................... 14
10.2 Conductors ................................................................................................................................. 14
10.3 Crossarms .................................................................................................................................. 14
10.4 Supports ..................................................................................................................................... 14
10.5 Stays ........................................................................................................................................... 14
11. MATERIALS ........................................................................................................................................... 15
12. TECHNICAL REQUIREMENTS FOR THE ERECTION OF LINES ........................................................ 16
12.1 Structure Type and Capabilities ............................................................................................... 16
12.2 Wood Poles................................................................................................................................. 16
12.2.1 Section, Section Angle and Terminal Supports ..................................................................... 16
12.2.2 Supports................................................................................................................................ 17
12.3 Pole Strut Loadings ................................................................................................................... 18
12.4 Wind Span and Foundation Requirements .............................................................................. 18
12.5 Failure Containment Requirements.......................................................................................... 19
12.6 Steelwork and Bolts ................................................................................................................... 19
12.7 Stays ........................................................................................................................................... 20
12.8 Line Conductors......................................................................................................................... 21
12.8.1 Line Jumpers and Down Dropper Jumpers ........................................................................... 21
12.9 Insulators and Conductor Fittings............................................................................................ 22
12.10 Span Lengths ............................................................................................................................. 22
12.11 Section Lengths ......................................................................................................................... 23
12.12 Conductor Design/Erection Sags and Tensions ..................................................................... 23
12.13 Conductor Spacing and Clearances......................................................................................... 23
12.13.1 Minimum Height of Line Conductors ..................................................................................... 23
12.13.2 Summary of Statutory Ground Clearances ........................................................................... 24
12.13.3 Clearances to Obstacles ....................................................................................................... 24
12.13.4 Clearances to other Power Lines .......................................................................................... 24
12.13.5 Railway and Canal Crossings ............................................................................................... 24
12.13.6 Telecommunications Crossings ............................................................................................ 24
12.13.7 Road / Motorway Crossings .................................................................................................. 24
12.14 Safety Signs and Number Plates .............................................................................................. 24
12.15 Anti-Climbing Devices ............................................................................................................... 25
12.16 Bonding and Earthing................................................................................................................ 25
12.16.1 Neutral Earths ....................................................................................................................... 25
12.17 11kV Transformers..................................................................................................................... 26
12.18 Switchgear .................................................................................................................................. 26
12.19 Air Break Switch Disconnectors (ABSD) ................................................................................. 26
12.20 HV Cable Terminations .............................................................................................................. 27
12.21 Surge Arresters .......................................................................................................................... 27

© SP Power Systems Ltd Page 2 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.22 Insulated Shrouding .................................................................................................................. 27


13. APPENDICES SUMMARY ..................................................................................................................... 28
2
14. APPENDIX 1 – 11KV NORMAL WEATHER AREA 50MM AAAC “HAZEL” CONDUCTOR (L10) ..... 29
14.1 Design Parameters..................................................................................................................... 29
2
14.2 Table 1 – Support Types and Duties Table for 50mm “Hazel” AAAC................................... 30
14.3 Table 2 – Conductor Design Table for 50mm² “Hazel” AAAC ................................................ 31
2
14.4 Table 3 – Conductor Pre-Tension Table for 50mm “Hazel” AAAC ....................................... 32
2
14.5 Table 4 – Conductor Erection Table for 50mm “Hazel” AAAC ............................................. 32
2
14.6 Table 5 – Maximum Angle of Deviation for Single Poles for 50mm “Hazel” AAAC ............ 33
2
14.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 50mm “Hazel” AAAC ................. 33
2
14.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 50mm “Hazel” AAAC
..................................................................................................................................................... 34
2
14.9 Table 8 – Strut Load in “H” Poles with Two or Three Stays (kgf) for 50mm “Hazel” AAAC
..................................................................................................................................................... 35
14.10 Table 9 – Strut Load in Single Pole Double Terminal Structures with Four Stays (kgf) for
2
50mm “Hazel” AAAC ................................................................................................................ 36
2
14.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 50mm “Hazel”
AAAC .......................................................................................................................................... 36
2
14.12 Table 11 – Stayed Pole Strut Capabilities for 50mm “Hazel” AAAC .................................... 37
2
14.13 Table 12 – Pole Sizing for Single Pole Intermediate and Section Poles for 50mm “Hazel”
AAAC .......................................................................................................................................... 38
2
15. APPENDIX 2 – 11KV SEVERE WEATHER AREA 100MM AAAC “OAK” CONDUCTOR (L27) ........ 39
15.1 Design Parameters..................................................................................................................... 39
15.2 Table 1 – Support Types and Duties Table for 100mm2 “Oak” AAAC (Severe Weather Area)
..................................................................................................................................................... 40
15.3 Table 2 – Conductor Design Table for 100mm² “Oak” AAAC (Severe Weather Area) ......... 41
2
15.4 Table 3 – Conductor Pre-Tension Table for 100mm “Oak” AAAC (Severe Weather Area). 42
2
15.5 Table 4 – Conductor Erection Table for 100mm “Oak” AAAC (Severe Weather Area) ....... 42
2
15.6 Table 5 – Maximum Angle of Deviation for Single Poles for 100mm “Oak” AAAC (Severe
Weather Area)............................................................................................................................. 43
2
15.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 100mm “Oak” AAAC (Severe
Weather Area)............................................................................................................................. 43
2
15.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 100mm “Oak” AAAC
(Severe Weather Area) ............................................................................................................... 44
2
15.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 100mm “Oak” AAAC (Severe
Weather Area)............................................................................................................................. 45
2
15.10 Table 9 – Strut Loading in Single Pole Construction Terminals (kgf) for 100mm “Oak”
AAAC (Severe Weather Area) ................................................................................................... 46
2
15.11 Table 10 – Stayed Pole Strut Capabilities for 100mm “Oak” AAAC (Severe Weather Area)
..................................................................................................................................................... 47
2
15.12 Table 11 – Pole Sizing for Single Pole Intermediate and Section Poles for 100mm “Oak”
AAAC (Severe Weather Area) ................................................................................................... 48
2
16. APPENDIX 3 – 33KV NORMAL WEATHER AREA 150MM AAAC “ASH” CONDUCTOR (L27) ....... 49
16.1 Design Parameters..................................................................................................................... 49
2
16.2 Table 1 – Support Types and Duties Table for 150mm “Ash” AAAC (Normal Weather Area)
..................................................................................................................................................... 50
16.3 Table 2 – Conductor Design Table for 150mm² “Ash” AAAC (Normal Weather Area) ......... 51
2
16.4 Table 3 – Conductor Pre-Tension Table for 150mm “Ash” AAAC (Normal Weather Area) 52
2
16.5 Table 4 – Conductor Erection Table for 150mm “Ash” AAAC (Normal Weather Area) ...... 52
2
16.6 Table 5 – Maximum Angle of Deviation for Single Poles for 150mm “Ash” AAAC (Normal
Weather Area)............................................................................................................................. 53
2
16.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 150mm “Ash” AAAC (Normal
Weather Area)............................................................................................................................. 53
2
16.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 150mm “Ash” AAAC
(Normal Weather Area) .............................................................................................................. 53

© SP Power Systems Ltd Page 3 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 150mm “Ash” AAAC (Normal
Weather Area)............................................................................................................................. 54
2
16.10 Table 9 – Strut Load in “H” Pole Structures with Four Stays (kgf) for 150mm “Ash” AAAC
(Normal Weather Area) .............................................................................................................. 55
2
16.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 150mm “Ash”
AAAC (Normal Weather Area) ................................................................................................... 55
2
16.12 Table 11 – Stayed Pole Strut Capabilities for 150mm “Ash” AAAC (Normal Weather Area)
..................................................................................................................................................... 56
2
16.13 Table 12 – Pole Sizing for Single Pole Intermediate and Section Poles for 150mm “Ash”
AAAC (Normal Weather Area) ................................................................................................... 57
2
17. APPENDIX 4 – 33KV NORMAL WEATHER AREA 200MM AAAC “POPLAR” CONDUCTOR (L33) 58
17.1 Design Parameters..................................................................................................................... 58
2
17.2 Table 1 – Support Types and Duties Table for 200mm “Poplar” AAAC (Normal Weather
Area) ............................................................................................................................................ 59
17.3 Table 2 – Conductor Design Table for 200mm² “Poplar” AAAC (Normal Weather Area) .... 60
2
17.4 Table 3 – Conductor Pre-Tension Table for 200mm “Poplar” AAAC (Normal Weather Area)
..................................................................................................................................................... 61
2
17.5 Table 4 – Conductor Erection Table for 200mm “Poplar” AAAC (Normal Weather Area) .. 61
2
17.6 Table 5 – Maximum Angle of Deviation for Single Poles for 200mm “Poplar” AAAC
(Normal Weather Area) .............................................................................................................. 62
2
17.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 200mm “Poplar” AAAC (Normal
Weather Area)............................................................................................................................. 62
2
17.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 200mm “Poplar”
AAAC (Normal Weather Area) ................................................................................................... 62
2
17.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 200mm “Poplar” AAAC
(Normal Weather Area) .............................................................................................................. 63
2
17.10 Table 9 – Strut Load in “H” Poles with Four Stays (kgf) for 200mm “Poplar” AAAC
(Normal Weather Area) .............................................................................................................. 64
2
17.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 200mm “Poplar”
AAAC (Normal Weather Area) ................................................................................................... 64
2
17.12 Table 11 – Stayed Pole Strut Capabilities for 200mm “Poplar” AAAC (Normal Weather
Area) ............................................................................................................................................ 65
2
17.13 Table 12 – Pole Sizing for Intermediate and Section Poles for 200mm “Poplar” AAAC
(Normal Weather Area) .............................................................................................................. 66
2
18. APPENDIX 5 – 33KV SEVERE WEATHER AREA 200MM AAAC “POPLAR” CONDUCTOR (L33) . 67
18.1 Design Parameters..................................................................................................................... 67
2
18.2 Table 1 – Support Types and Duties Table for 200mm “Poplar” AAAC (Severe Weather
Area) ............................................................................................................................................ 68
18.3 Table 2 – Conductor Design Table for 200mm² “Poplar” AAAC (Severe Weather Area) ..... 69
2
18.4 Table 3 – Conductor Pre-Tension Table for 200mm “Poplar” AAAC (Severe Weather Area)
..................................................................................................................................................... 70
2
18.5 Table 4 – Conductor Erection Table for 200mm “Poplar” AAAC (Severe Weather Area)... 70
2
18.6 Table 5 – Maximum Angle of Deviation for Single Poles for 200mm “Poplar” AAAC (Severe
Weather Area)............................................................................................................................. 71
2
18.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 200mm “Poplar” AAAC (Severe
Weather Area)............................................................................................................................. 71
2
18.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 200mm “Poplar”
AAAC (Severe Weather Area) ................................................................................................... 71
2
18.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 200mm “Poplar” AAAC
(Severe Weather Area) ............................................................................................................... 72
2
18.10 Table 9 – Strut Load in “H” Poles with Four Stays (kgf) for 200mm “Poplar” AAAC (Severe
Weather Area)............................................................................................................................. 73
2
18.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 200mm “Poplar”
AAAC (Severe Weather Area) ................................................................................................... 73
2
18.12 Table 11 – Stayed Pole Strut Capabilities for 200mm “Poplar” AAAC (Severe Weather
Area) ............................................................................................................................................ 74

© SP Power Systems Ltd Page 4 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.13 Table 12 – Pole Sizing for Single Pole Intermediate and Section Poles for 200mm “Poplar”
AAAC (Severe Weather Area) ................................................................................................... 75
2
19. APPENDIX 6 – 33KV SEVERE WEATHER AREA 300MM AAAC “UPAS” CONDUCTOR (L35) ...... 76
19.1 Design Parameters..................................................................................................................... 76
2
19.2 Table 1 – Support Types and Duties Table for 300mm “Upas” AAAC (Severe Weather
Area) ............................................................................................................................................ 77
19.3 Table 2 – Conductor Design Table for 300mm² “Upas” AAAC (Severe Weather Area) ....... 78
2
19.4 Table 3 – Conductor Pre-Tension Table for 300mm “Upas” AAAC (Severe Weather Area)
..................................................................................................................................................... 79
2
19.5 Table 4 – Conductor Erection Table for 300mm “Upas” AAAC (Severe Weather Area) ..... 79
2
19.6 Table 5 – Maximum Angle of Deviation for Single Poles for 300mm “Upas” AAAC (Severe
Weather Area)............................................................................................................................. 80
2
19.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 300mm “Upas” AAAC (Severe
Weather Area)............................................................................................................................. 80
2
19.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 300mm “Upas” AAAC
(Severe Weather Area) ............................................................................................................... 80
2
19.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 300mm “Upas” AAAC (Severe
Weather Area)............................................................................................................................. 81
2
19.10 Table 9 – Strut Load in “H” Pole Structures with Four Stays (kgf) for 300mm “Upas”
AAAC (Severe Weather Area) ................................................................................................... 82
2
19.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 300mm “Upas”
AAAC (Severe Weather Area) ................................................................................................... 82
2
19.12 Table 11 – Stayed Pole Strut Capabilities for 300mm “Upas” AAAC (Severe Weather Area)
..................................................................................................................................................... 83
2
19.13 Table 12 – Pole Sizing for Intermediate and Section Poles for 300mm “Upas” AAAC
(Severe Weather Area) ............................................................................................................... 84
20. APPENDIX 7 – INSTALLATION REQUIREMENTS FOR CONDUCTORS INCORPORATING OPTICAL
FIBRES................................................................................................................................................... 85
20.1 Introduction ................................................................................................................................ 85
20.2 General........................................................................................................................................ 85
20.2.1 OPPC .................................................................................................................................... 85
20.2.2 Crossarms, Supports and Stays ........................................................................................... 85
20.3 Materials ..................................................................................................................................... 86
20.3.1 OPPC .................................................................................................................................... 86
20.3.2 Vibration Damper .................................................................................................................. 86
20.3.3 Suspension Components ...................................................................................................... 86
20.3.4 Upas Equivalent OPPC Tension String Components ........................................................... 87
20.3.5 Poplar Equivalent OPPC Tension String Components ......................................................... 88
20.4 Optical Splice Enclosures ......................................................................................................... 89
20.4.1 Electrical Connections .......................................................................................................... 89
20.5 Earthing ...................................................................................................................................... 89
20.6 Optical Fibre Cable Connections .............................................................................................. 89
20.7 General Arrangement OPPC Splice Enclosures...................................................................... 90
21. APPENDIX 7A – POPLAR EQUIVALENT OPTICAL CONDUCTOR (L34)........................................... 91
2
21.1 200mm AAAC “Poplar” Equivalent OPPC Conductor (Normal Weather Area) ................... 91
2
21.1.1 Table 1 – 200mm AAAC “Poplar” Equivalent OPPC Conductor (Normal Weather Area) .... 91
21.1.2 Table 2 – Conductor Design Table for 200mm² “Poplar Equivalent OPPC” AAAC (Normal
Weather Area)....................................................................................................................... 92
21.1.3 Table 3 – Conductor Pre-Tension Table for 200mm² “Poplar Equivalent OPPC” AAAC
(Normal Weather Area) ......................................................................................................... 93
21.1.4 Table 4 – Conductor Erection Table for 200mm² “Poplar Equivalent OPPC” AAAC (Normal
Weather Area)....................................................................................................................... 93
2
21.2 200mm AAAC “Poplar” Equivalent Optical Conductor (Severe Weather Area) (L34) ........ 94
2
21.2.1 Table 1 – 200mm AAAC “Poplar” Equivalent OPPC Conductor (Severe Weather Area) .... 94
21.2.2 Table 2 – Conductor Design Table for 200mm² “Poplar Equivalent OPPC” AAAC (Severe
Weather Area)....................................................................................................................... 95

© SP Power Systems Ltd Page 5 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

21.2.3 Table 3 – Conductor Pre-Tension Table for 200mm² “Poplar Equivalent OPPC” AAAC
(Severe Weather Area) ......................................................................................................... 96
21.2.4 Table 4 – Conductor Erection Table for 200mm² “Poplar Equivalent OPPC” AAAC (Severe
Weather Area)....................................................................................................................... 96
22. APPENDIX 7B – UPAS EQUIVALENT OPTICAL CONDUCTOR (SEVERE WEATHER AREA) (L36) 97
2
22.1 Table 1 – 300mm AAAC “Upas” Equivalent OPPC Conductor (Severe Weather Area) ...... 97
22.2 Table 2 – Conductor Design Table for 300mm² “Upas Equivalent OPPC” AAAC (Severe
Weather Area)............................................................................................................................. 98
2
22.3 Table 3 – Conductor Pre-Tension Table for 300mm “Upas Equivalent OPPC” AAAC
(Severe Weather Area) ............................................................................................................... 99
2
22.4 Table 4 – Conductor Erection Table for 300mm “Upas Equivalent OPPC” AAAC (Severe
Weather Area)............................................................................................................................. 99
23. APPENDIX 8 – INSTALLATION REQUIREMENTS FOR HORSE OPGW .......................................... 100
23.1 General...................................................................................................................................... 100
23.1.1 OPGW ................................................................................................................................ 100
23.1.2 Supports and Stays............................................................................................................. 100
23.2 Materials ................................................................................................................................... 100
23.2.1 OPGW ................................................................................................................................ 100
23.2.2 Vibration Damper ................................................................................................................ 100
23.2.3 Suspension Components .................................................................................................... 100
23.2.4 Horse Equivalent Tension String Components ................................................................... 101
23.2.5 Connection to Splice Enclosures ........................................................................................ 101
23.3 Conductor Design/Erection Sags and Tensions ................................................................... 102
23.4 Location of OPGW Attachment Points on Structures........................................................... 102
23.4.1 Straight Section, Intermediate and Pin Angle Structures .................................................... 102
23.4.2 Angle Section and Terminal Structures ............................................................................... 102
23.5 Bonding and Earthing of OPGW and Components ............................................................... 102
24. APPENDIX 8A – “HORSE” EQUIVALENT OPGW CONDUCTOR (80M BASIC SPAN) .................... 103
2
24.1 Table 1 – 70mm AACSR “Horse” Equivalent OPGW Conductor (80m Basic Span) ......... 103
24.2 Table 2 – Conductor Design Table for 70mm² “Horse Equivalent OPGW” AACSR (80m
Basic Span) .............................................................................................................................. 104
24.3 Table 3 – Conductor Erection Table for 70mm² “Horse Equivalent OPGW” AACSR (80m
Basic Span) .............................................................................................................................. 105
25. APPENDIX 8B – “HORSE” EQUIVALENT OPGW CONDUCTOR (100M BASIC SPAN) .................. 106
2
25.1 Table 1 – 70mm AACSR “Horse” Equivalent OPGW Conductor (100m Basic Span) ....... 106
25.2 Table 2 – Conductor Design Table for 70mm² “Horse Equivalent OPGW” AACSR (100m
Basic Span) .............................................................................................................................. 107
25.3 Table 3 – Conductor Erection Table for 70mm² “Horse Equivalent OPGW” AACSR (100m
Basic Span) .............................................................................................................................. 108
26. APPENDIX 8C – “HORSE” EQUIVALENT OPGW CONDUCTOR (120M BASIC SPAN) .................. 109
2
26.1 Table 1 – 70mm AACSR “Horse” Equivalent OPGW Conductor (120m Basic Span) ....... 109
26.2 Table 2 – Conductor Design Table for 70mm² “Horse Equivalent OPGW” AACSR (120m
Basic Span) .............................................................................................................................. 110
26.3 Table 3 – Conductor Erection Table for 70mm² “Horse Equivalent OPGW” AACSR (120m
Basic Span) .............................................................................................................................. 111
27. DRAWINGS AND COMPONENT LISTINGS ....................................................................................... 112
27.1 Figure 1 11kV Single Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP2147483) ............................................................................................................................... 114
27.2 Figure 2 11kV “H” Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP4000590) ............................................................................................................................... 115
27.3 Figure 3 33kV Light Construction Single Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009847) ............................................................................................ 116
27.4 Figure 4 33kV Light Construction “H” Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009848) ............................................................................................ 117

© SP Power Systems Ltd Page 6 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.5 Figure 5 33kV Heavy Construction Single Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009850) ............................................................................................ 118
27.6 Figure 6 33kV Heavy Construction “H” Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009851) ............................................................................................ 119
27.7 Figure 7 Delta “H” Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP4000875) ............................................................................................................................... 120
27.8 Figure 8 Single Pole Intermediate or Pin Angle (Drawing Reference SP2147473) ............. 121
27.8.1 General Assembly Arrangement Single Pole Intermediate or Pin Angle (Drawing Reference
SP2147473) ........................................................................................................................ 122
27.9 Figure 9 Single Pole Intermediate or Pin Angle (Drawing Reference SP4018552) ............. 123
27.9.1 General Assembly Arrangement Single Pole Intermediate or Pin Angle (Drawing Reference
SP4018552) ........................................................................................................................ 124
27.10 Figure 10 “H” Pole Intermediate Long Span (Drawing Reference SP4019155) .................. 125
27.10.1 General Assembly Arrangement “H” Pole Intermediate Long Span (Drawing Reference
SP4019155) ........................................................................................................................ 126
27.11 Figure 11 Single Pole Straight Line or Angle Section (Drawing Reference SP2147476) ... 127
27.11.1 General Assembly Arrangement Single Pole Straight Line or Angle Section (Drawing
Reference SP2147476) ...................................................................................................... 128
27.12 Figure 12 Single Pole Straight Line or Angle Section (Drawing Reference SP4018548) ... 129
27.12.1 General Assembly Arrangement Single Pole Straight Line or Angle Section (Drawing
Reference SP4018548) ...................................................................................................... 130
27.13 Figure 13 “H” Pole Straight Line or Angle Section (Drawing Reference SP4019003) ........ 131
27.13.1 General Assembly Arrangement “H” Pole Straight Line or Angle Section (Drawing Reference
SP4019003) ........................................................................................................................ 132
27.14 Figure 14 Long Span “H” Pole Straight Line or Angle Section (Drawing Reference
SP2147486) ............................................................................................................................... 133
27.14.1 General Assembly Long Span “H” Pole Straight Line or Angle Section (Drawing Reference
SP2147486) ........................................................................................................................ 134
27.15 Figure 15 Delta “H” Pole Section or Section Angle (Drawing Reference SP2059611) ....... 135
27.15.1 General Assembly Delta “H” Pole Section or Section Angle (Drawing Reference SP2059611)
............................................................................................................................................ 136
27.16 Figure 16 Delta Long Span “H” Pole Section or Section Angle (Drawing Reference
SP2059372) ............................................................................................................................... 137
27.16.1 General Assembly Delta Long Span “H” Pole Section or Section Angle (Drawing Reference
SP2059372) ........................................................................................................................ 138
27.17 Figure 17 Single Pole Terminal (Drawing Reference SP2147474)........................................ 139
27.17.1 General Assembly Single Pole Terminal (Drawing Reference SP2147474) ....................... 140
27.18 Figure 18 “H” Pole Terminal (Drawing Reference SP2147485) ............................................ 141
27.18.1 General Assembly “H” Pole Terminal (Drawing Reference SP2147485) ............................ 142
27.19 Figure 19 Single Pole Double Terminal (Drawing Reference SP4000578) .......................... 143
27.19.1 General Assembly Single Pole Double Terminal (Drawing Reference SP4000578) ........... 144
27.20 Figure 20 General Arrangement Intermediate Crossarm (Drawing Reference SP4018402)
................................................................................................................................................... 145
27.21 Figure 21 General Arrangement Section Crossarm (Drawing Reference SP4018433)....... 146
27.22 Figure 22 General Arrangement Terminal Crossarm (Drawing Reference SP4018401)..... 147
27.23 Figure 23 General Arrangement Long Span Crossarm (Drawing Reference SP4017663) . 148
27.24 Figure 24 General Arrangement Crossarm Strut (Drawing Reference SP4017649) ........... 149
27.25 Figure 25 General Arrangement Long Crossarm Strut (Drawing Reference SP4017635) . 150
27.26 Figure 26 General Arrangement Long Span Delta Crossarm Strut (Drawing Reference
SP2143987) ............................................................................................................................... 151
27.27 Figure 27 General Arrangement Terminal Strap (Drawing Reference SP4017664) ............ 152
27.28 Figure 28 General Arrangement Section Strap (Drawing Reference SP4017666) .............. 153
27.29 Figure 29 General Arrangement Insulator Bracket (Drawing Reference SP4018449) ........ 154
27.30 Figure 30 General Arrangement Insulator Plate (Drawing Reference SP4017637)............. 155
27.31 Figure 31 General Arrangement Foundation Brace Steelwork “H” Pole 1830mm Centres
(Drawing Reference SP4017651) ............................................................................................ 156
27.32 Figure 32 General Arrangement Foundation Brace Steelwork “H” Pole 2500mm Centres
(Drawing Reference SP4017652) ............................................................................................ 157

© SP Power Systems Ltd Page 7 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.33 Figure 33 General Arrangement Stay and Foundation Blocks (Drawing Reference
SP4019020) ............................................................................................................................... 158
27.34 Figure 34 General Arrangement Wood Brace Block Type 1 “H” Pole 1830mm Centres
(Drawing Reference SP4019036) ............................................................................................ 159
27.35 Figure 35 General Arrangement Wood Brace Block Type 2 “H” Pole 2500mm Centres
(Drawing Reference SP4019037) ............................................................................................ 160
27.36 Figure 36 General Arrangement “H” Pole Carryover Support Steelwork (Drawing Reference
SP4008885) ............................................................................................................................... 161
27.37 Figure 37 General Arrangement “H” Pole Cable Cleat / Coffin Support Steelwork (Drawing
Reference SP2143955)............................................................................................................. 162
27.38 Figure 38 General Arrangement “H” Pole Crucifix Support Steelwork (Drawing Reference
SP2143957) ............................................................................................................................... 163
27.39 Figure 39 General Arrangement Single Pole Fuse Steelwork (Drawing Reference
SP2059590) ............................................................................................................................... 164
27.40 Figure 40 General Arrangement Single Pole Fuse Outrigger Steelwork (Drawing Reference
SP2143963) ............................................................................................................................... 165
27.41 Figure 41 General Arrangement “H” Pole Fuse Steelwork (Drawing Reference SP2143487)
................................................................................................................................................... 166
27.42 Figure 42 General Arrangement Surge Arrester Support Steelwork (Drawing Reference
SP2143956) ............................................................................................................................... 167
27.43 Figure 43 General Arrangement Delta “H” Section Strap (Drawing Reference SP2146143)
................................................................................................................................................... 168
27.44 Figure 44 General Arrangement Terminal Bracing Strap (Drawing Reference SP4015138)
................................................................................................................................................... 169
27.45 Figure 45 General Arrangement Terminal Bracing Strap (Drawing Reference SP4020576)
................................................................................................................................................... 170
27.46 Figure 46 General Arrangement Long Section Strap for Long Span Delta “H” Pole (Drawing
Reference SP4019183)............................................................................................................. 171
27.47 Figure 47 General Arrangement Heavy Construction Stay Attachment Plates (Drawing
Reference SP4009774)............................................................................................................. 172
27.48 Figure 48 General Arrangement Heavy Construction Stay Attachment (Drawing Reference
SP4009862) ............................................................................................................................... 173
27.49 Figure 49 General Arrangement Transformer Platform Steelwork for a Single Pole (Drawing
Reference SP4020579)............................................................................................................. 174
27.50 Figure 50 General Assembly Transformer Platform Steelwork for a Single Pole (Drawing
Reference SP4020581)............................................................................................................. 175
27.51 Figure 51 General Arrangement Transformer Platform Steelwork for an “H” Pole (Drawing
Reference SP4020578)............................................................................................................. 176
27.52 Figure 52 General Assembly Transformer Platform Steelwork for an “H” Pole (Drawing
Reference SP4020580)............................................................................................................. 177
27.53 Figure 53 General Arrangement Single Pole Bog Shoe (Drawing Reference SP2146665) 178
27.54 Figure 54 General Arrangement “H” Pole Bog Shoe (Drawing Reference SP2146682) ..... 179
27.55 Figure 55 General Arrangement Bog Shoe Strut (Drawing Reference SP2146662) ........... 180
27.56 Figure 56 General Arrangement 30° Angle Bracket (Drawing Reference SP4018951) ....... 181
27.57 Figure 57 General Arrangement Wind Stay Attachment (Drawing Reference SP4000336) 182

© SP Power Systems Ltd Page 8 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

7. DEFINITIONS

For the purpose of this specification the following definitions apply:

AAAC: All Aluminium Alloy Conductor.

ACSR: Aluminium Conductor Steel Reinforced.

AACSR: Aluminium Alloy Conductor Steel Reinforced.

Approved: Equipment approved in accordance with SP Energy Networks’


Equipment Approvals Procedure (ASSET-02-002), and which is
considered suitable for installation on SP Energy Networks’
networks.

Auxiliary Equipment: Equipment other than that forming part of the line design which may
be placed on supports such as transformers, fuse gear etc.

Average Span: The arithmetic average of a number of spans in a line or section of


line.

Basic Span: The span length adopted for sag/tension calculations.

Creep: Permanent long term elongation of the conductor.

Construction Terminal: A support at which the line may be terminated temporarily on one
side of the crossarm only on tension insulator sets.

Crossarm Assembly: A descriptive term used to include all pole top crossarm components
and fixings.

Downpull: The vertical loading imposed by the conductors corresponding to a


gradient measured between adjacent pole tops.

Engineer: SP Energy Networks’ nominated representative having authority over


technical matters contained in this specification.

Intermediate Support: A support in a straight run of line on which the conductors are
supported on pin or post Insulators.

Maximum Span: The maximum permitted length of any span.

Maximum Working The conductor tension assessed at -5.6ºC with wind and ice loading,
Tension (MWT): which may be limited by vibration considerations.

Normal Weather As defined in SP Energy Networks’ Construction Policy for


Environment: Distribution Overhead Lines (OHL-01-008).

OPGW: Optical Ground Wire.

OPPC: Optical Phase Conductor.

Over Tension: Excess tension applied above normal tension at time of erection to
compensate for conductor creep.

Recommended Span: The average span length in any section to which the line should be
planned.

© SP Power Systems Ltd Page 9 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

Sag: The vertical distance, under any system of conductor loading,


between the conductor and a straight line joining adjacent supporting
points, measured at mid-span.

Section Angle Support: A support at which a line deviates and the conductors are made off
on either side of the crossarm on tension insulators.

Section Support: A support in a straight run of line on which the conductors are made
off on either side of the crossarm on tension insulators.

Severe Weather As defined in SP Energy Networks’ Construction Policy for


Environment: Distribution Overhead Lines (OHL-01-008).

Span: The horizontal distance between adjacent supports. Individual spans


will normally be within 20% of the basic span.

SP Energy Networks: The brand name for the division of the ScottishPower group of
companies that encompasses SP Distribution plc, SP Transmission
plc, SP Manweb plc and SP Power Systems Ltd.

SP Distribution plc (SPD): The Distribution Licence Holder for the distribution service area
formerly known as ScottishPower.

SP Manweb plc (SPM): The Distribution Licence Holder for the distribution service area
formerly known as Manweb.

SP Transmission plc (SPT): The Transmission Licence Holder for the transmission service area
formerly known as ScottishPower.

Uplift: When a line profile indicates a conductor attachment point is below


the -5.6ºC curve when strung between two adjacent supports.

Wind Span: Half the sum of the spans adjacent to the support.

© SP Power Systems Ltd Page 10 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

8. REFERENCES

When designing or constructing overhead lines in accordance with this specification it is essential that
the appropriate persons be in possession of the latest versions of the following documents.

Statutory Legislation

ESQCR Electricity Safety, Quality and Continuity Regulations

British Standards (BS)

BS 183 Specification for General Purpose Galvanised Steel Wire Strand


BS EN ISO 898-1 Mechanical properties of fasteners made of carbon steel and alloy steel, Bolts,
Screws and Studs
BS EN 14229 Structural Timber. Wood Poles for Overhead Lines
BS 1990 Wood poles for overhead power and telecommunication lines. Specification for
softwood poles
BS 3288 Insulator and conductor fittings for overhead power lines
BS 4102 Steel Wire for General Fencing Purposes
BS EN 10244-2 Non-ferrous metallic coatings on steel wire - Part 2: Zinc or zinc alloy coatings on
steel wire
BS EN 61284 Overhead Lines-Requirements and Tests for Fittings

Energy Networks Association Technical Specifications (ENA TS)

ENA TS 43-8 Overhead Line Clearances


ENA TS 43-15 Insulator Binds and Equivalent Helical Fittings for Overhead Lines
ENA TS 43-40 Specification for Single Circuit Overhead Lines on Wood Poles for use at High
Voltage Up To and including 33kV
ENA TS 43-88 Selection and treatment of wood poles and associated timber for overhead lines
ENA TS 43-90 Anti-Climbing Devices and Safety Signs for HV Lines up to and including 400kV
ENA TS 43-91 Stay strands and stay fittings for overhead lines
ENA TS 43-92 Overhead Line Fittings
ENA TS 43-93 Line Insulators
ENA TS 43-95 Steelwork for overhead lines
ENA TS 43-96 Fasteners and washers for wood pole overhead lines
ENA TS 43-119 Designs and Use of Temporary Scaffold Guards

Energy Networks Association Engineering Recommendations (ER)

ER-PO5 Protection of Telecommunication Lines from High Voltage Power Lines

© SP Power Systems Ltd Page 11 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

SP Energy Networks’ Documents

ASSET-01-021 Asset Inspection and Condition Assessment Policy


ASSET-02-002 Equipment Approvals Procedure – SP Energy Networks
OHL-01-008 Construction Policy for Distribution Overhead Lines
OHL-03-096 Specification for Overhead Line Conductor Incorporating Optical Fibres
OHL-06-001 Approved Equipment Register – Overhead Lines
OHL-14-005 Overhead Line Clearances
OHL-18-017 Termination of 11kV Cables on Poles
OHL-18-019 Termination of 33kV Cables on Poles
OHL-18-022 Erection of Optical Phase Conductors (OPPC) – Supplementary Guidance
OHL-21-001 Stays for Wood Poles
OHL-22-001 Installation of Transformers on Poles
OHL-22-006 Installation of Jumpers on Poles
OHL-22-010 Air-Break Switch Disconnector Installation
OHL-22-012 Installation and Commissioning Instructions for Metal Enclosed Pole Mounted
Load Break Switch Disconnector
OHL-22-013 Installation of Pole Mounted Auto-Reclosers (PMARs)
OHL-22-020 Vermin Control Shrouds
OHL-22-026 Erection of Fuse Steelwork on a Single Pole
OHL-23-002 Policy for Labelling of Wood Pole Overhead Line Apparatus in SP Manweb
OHL-23-004 Policy for Labelling of Wood Pole Overhead Line Apparatus in SP Distribution
OHL-25-001 Pole Top Bonding
OHL-25-002 Overhead Line PTE Earths and LV Neutral Earths
OHL-25-007 Earthing and Bonding Pole Mounted Equipment
th
Scottish Power Limited Safety Rules (Electrical and Mechanical) 4 Edition

Iberdrola Networks’ Specifications

INS 54.63.05 Overhead Line Conductors

© SP Power Systems Ltd Page 12 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

9. INTRODUCTION

It is the continued SP Energy Networks’ aspiration that all overhead networks will be suitably storm
resilient, lines constructed to this specification will fulfil those requirements providing reliable and
economical network performance.

This specification has been prepared to provide a design of high voltage overhead lines up to 33kV
suitable for application within SP Energy Networks’ licensed areas. They incorporate features of
previously proven specifications, particularly with regard to conductors, maximum working tensions,
span lengths and factors of safety.
st
All overhead lines erected after 31 January 2003 are required to comply with ESQCR. Overhead
lines designed and constructed in accordance with this specification are deemed to comply with
ESQCR.

Any new or proposed overhead line not complying with this specification shall, in each case, be
subject to Approval by the Head of Engineering Design and Standards or their nominated
representative.

Approval will normally be sought during the planning stage for the construction of any new overhead
line.

© SP Power Systems Ltd Page 13 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

10. DESIGN DATA

10.1 Design Basis

The design basis for this specification mirrors that in ENA TS 43-40, utilising an empirical approach.

10.2 Conductors

The tension of any line conductor at a temperature of -5.6ºC and subjected to a design wind and ice
loading appropriate to the environment in which the line will be situated, shall ensure that the
conductor will have a minimum factor of safety of 2.5 over the rated breaking strength of the
conductor.

The basic span length is specific to the conductor and environment in which the line will be situated
and will be specified in the relevant appendix.

10.3 Crossarms

The minimum factor of safety on all crossarm assemblies and associated steelwork is 2.5 in a Normal
Weather Environment and up to 3.5 in a Severe Weather Environment on the yield stress of the steel.

10.4 Supports

The strength of supports is derived from formulae contained in BS EN 14229.

The stresses created in intermediate supports are bending stresses due to windage on conductors.
All “in-line” intermediate and section poles have a minimum factor of safety of 3.5 in all Weather
Environments.

The stresses created in stayed supports are crippling stresses due to stay tension, steelwork and
vertical conductor loads acting at the pole top. All angle and terminal poles have a minimum factor of
safety of 2.5 in a Normal Weather Environment and up to 3.5 in a Severe Weather Environment.

Pole top horizontal loading has also to be maintained within specified limits to prevent pole top
splitting. Poles shall be of a sufficient diameter to withstand the above-mentioned stresses. Therefore
the minimum pole grade allowable in appendix 1 only shall be “Medium”, all other appendices require
a minimum pole grade of stout to BS EN 14229 for the purpose of this specification. The pole top
diameter may exceed the minimum pole top diameter quoted in BS EN 14229. This more onerous
requirement should be taken into account when selecting poles.

For Pinus Sylvestris, the average ultimate extreme fibre stress value used for all pole calculations is
53.3N/mm². The average modulus of elasticity fibre stress is 10054N/mm².

In all cases, the appropriate pole strength has been calculated using a maximum taper of
11.25mm/m.

10.5 Stays

The minimum factor of safety on stay assemblies is 2.5 in a Normal Weather Environment and up to
3.5 in a Severe Weather Environment based on the minimum failing load of the assembly.

Installation depths shall be specified during the design stage. Further guidance is available in OHL-
21-001.

© SP Power Systems Ltd Page 14 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

11. MATERIALS

Except where otherwise specified all materials used in the construction of lines to this specification
shall comply with current British Standards and ENA Technical Specifications as appropriate. Only
Approved materials shall be used.

© SP Power Systems Ltd Page 15 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12. TECHNICAL REQUIREMENTS FOR THE ERECTION OF LINES

12.1 Structure Type and Capabilities

Table 1 of appendices 1 to 6 contained within this specification provides details of the various
structure types, limiting span length and angle of deviation detailed under gradient conditions as
applicable, together with the appropriate SP Energy Networks’ Drawing Reference numbers. The
maximum span lengths indicated take account of conductor clashing and steelwork strength
limitations.

Poles, which are subject to uplift at -5.6ºC, shall be sectioned.

12.2 Wood Poles

Only poles specified in OHL-06-001 shall be used. In all circumstances, wood poles shall comply with
BS EN 14229 and ENA TS 43-88. They shall be supplied drilled and scarfed. Pole blocks shall be
fabricated to ENA TS 43-91 Drawing Reference 439103 Type 2 and Drawing Reference 439112 Type
1 & 2 as required.

12.2.1 Section, Section Angle and Terminal Supports

The gradient limitations quoted in Table 1 of appendices 1 to 6 are derived from the conductor vertical
load, which can be accommodated by the crossarm and is expressed as a downpull gradient
measured between adjacent pole tops.

The gradient limitations quoted in Table 1 refer to downpull gradients on each side of the support and
therefore it is acceptable to summate gradients. The gradients limitations quoted in Table 1 are
therefore permitted on both sides of the supports. Terminal supports are designed to allow for the
appropriate value on one side of the structure only.

The uplift limits on section, section angle and terminal structures shall be taken as being the same as
for downpull detailed in Table 1 of the relevant appendices.

© SP Power Systems Ltd Page 16 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.2.2 Supports

For section and intermediate structures the maximum downpull shall be no greater than an equivalent
gradient of 1:10 to the horizontal plane on either side of the structure.

β ≤ 191º

1:10* 1:10*

For hillside applications, the maximum gradient quoted in Table 1 of appendices 1 to 6 for
intermediate supports is limited by the method of conductor attachment and is permitted only where
angle α ≥ 166º and where angle β ≤ 191º. Where these limitations cannot be satisfied a section
structure should be employed.

β ≤ 191º

1:4 α ≥ 166º

For terminal structures the maximum downpull shall be equivalent to a gradient of 1:5 to the horizontal
plane on one side of the structure only.

It may be impractical to strictly adhere to these uplift and downpull constraints which can result in
abnormally high structures being designed. This can introduce other risks that would be preferable to
avoid. Designs that do not comply with the requirements set out above shall be subject to approval by
SP Energy Networks’ Lead Engineer for Circuits Development and/or the Head of Engineering Design
and Standards or their nominated representative.

Approval shall, where practical, be granted during the planning stage of the overhead line design.

© SP Power Systems Ltd Page 17 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.3 Pole Strut Loadings

The strut loading imposed on poles due to vertical components of stay and conductor tensions
including any auxiliary equipment at specified angles of line deviation and ground slope conditions are
specified in the relevant tables of appendices 1 to 6.

For all single pole 11kV structures an allowance of 600kg has been included for the attachment of
auxiliary equipment.

During construction, section poles may be utilised as temporary terminals. Where a single pole
section structure is required for this situation, the pole must be graded such that it is capable of a
terminal load condition as detailed in pole strut loading tables of the relevant appendices.

Temporary terminal stays will be fitted in accordance with Approved staying methods and placed at
the ends of the crossarm and the stay anchors positioned no closer to the pole than two pole lengths.
2
This may require to be increased significantly where conductors in excess of 100mm are employed
to limit the loading applied to the pole and crossarm assembly.

12.4 Wind Span and Foundation Requirements

Pole foundations shall be designed to withstand the overturning moment due to windage on
conductors, poles and insulators. Foundation design shall also take account of the rupturing capacity
of the ground. In excavating foundation holes, the minimum amount of soil shall be disturbed in order
to take advantage of the load bearing value of the virgin ground as far as possible. Backfilled soil shall
be compacted using hand or mechanical compaction methods, not more than 150mm of loose soil
shall be returned between each ramming operation.

All structures shall have a minimum of one foundation block fitted at a minimum of 500mm below
ground level. Where an angle of deviation exists, the top foundation block shall be on the inside of the
angle.

Where the quality of backfill material is unsuitable it will be necessary to replace the excavated
material with a suitable imported backfill, however an Approved soil additive, e.g. Permasoil, may be
used to improve the quality of poor soil.

The Engineer (i.e SP Energy Networks appointed design engineer or delivery engineer) shall inspect
holes and, where deemed necessary, additional kicking blocks or bog shoes as detailed in SP Energy
Networks’ Drawing Reference SP2146665 (Single Pole Bog Shoe) or SP2146682 (H Pole Bog Shoe)
shall be installed.

In addition, it may be necessary to install wind stays in accordance with SP Energy Networks’
Drawing Reference SP4000336 to exposed sections of line.

All foundations shall have a minimum factor of safety of 2.5 in a Normal Weather Environment and up
to 3.5 in a Severe Weather Environment.

The values for wind span capabilities for unstayed intermediate and section structures quoted in the
appendices have been calculated using a soil bearing capacity of 314 (kN/m²).

The appendices also detail the planting depths appropriate to the various pole lengths.

© SP Power Systems Ltd Page 18 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.5 Failure Containment Requirements

All lines shall include supports, designed to contain a cascade failure, separated by not more than
1000m. Supports, which are considered adequate to provide failure containment, are:

(i) Any Section Structure (minimum grade stout as defined in ENA TS 43-88).

(ii) Any Straight Line H Pole Section Structure.

(iii) Any Section Angle Structure, which requires to be fitted with twin-splayed stays, with a
stay slope of 45°.

(iv) Any “H” Pole Section Angle Structure in excess of 30° fitted with splayed stays with a stay
slope of 45°.

(v) Any “H” Pole Section Angle Structure fitted with twin splayed stays with a stay slope of
45º employed on both sides of the Structure in the plane of the line.

(vi) A Terminal Structure.

Acceptable Failure Containment Options


Conductor
(i) (ii) (iii) (iv) (v) (vi)
Hazel ✓ ✓ ✓ ✓ ✓ ✓
Oak - ✓ ✓ ✓ ✓ ✓
Ash - ✓ ✓ ✓ ✓ ✓
Poplar - - ✓ ✓ ✓ ✓
Upas - - - ✓ ✓ ✓

Note: The following table indicates the minimum requirements to satisfy option (iii) for the
various conductor types.

Angle of deviation on a
Conductor Type
Single Pole
Hazel >45º
Oak >40º
Ash >29º
Poplar >15º

12.6 Steelwork and Bolts

The steelwork for the structure types included in this specification shall, where practical, conform to
the requirements of ENA TS 43-95.

All intermediate, section, section angle and terminal supports shall have anti-split bolts fitted above
and below the crossarm steelwork.

Bolts shall generally conform to ENA TS 43-96 and BS EN ISO 898-1.

Terminal Bracing Straps SP Energy Networks’ Drawing Reference SP4020576 for L33 construction
and Drawing Reference SP4015138 for L35 or L36 construction shall be substituted for item 9 in the
“H” Pole Terminal Structure general assembly Drawing Reference SP2147485.

M20 High Yield Steel Pole Bolts (Stamped 8.8) are required for all structures for all applications.

© SP Power Systems Ltd Page 19 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.7 Stays

Stays shall be Approved and comply with ENA TS 43-91. Design calculations have been based on
galvanised steel stranding of 7/4.00mm, Grade 1150 to BS 183. Stay wires shall, unless specifically
designed otherwise, be made off with helical fittings at the pole top, insulator positions and on the stay
2
rods. Where conductors in excess of 200mm are employed, Stay attachment at pole tops shall be as
shown in SP Energy Networks’ Drawing Reference SP4009862.

Thimbles used for making off stay wire to stay rods shall conform to ENA TS 43-91 Drawing
Reference 439109 Type 1 for 7/4.00mm stays.

Stay blocks shall be cut from sawn timber to produce rectangular sections and shall conform to ENA
TS 43-91 for 7/4.00mm stays.

Stay rods shall be adjustable and in accordance with ENA TS 43-91 Drawing Reference 439101 Type
2 for 7/4.00mm stays.

The relevant tables of the appendices detail the maximum angles of deviation allowable for the
varying stay slopes relative to a number of stays. Terminal supports shall be stayed in accordance
with the requirements for a 60º angle of deviation.

Where two stays are required, they can be installed either splayed or in tandem. When splayed, they
shall be a minimum of 3m apart at ground level. When in tandem, the stay blocks shall be in separate
holes with at least 3m undisturbed ground between them. Tandem stays are not permitted when the
structure is designated as a failure containment structure as defined in Section 12.5.

All stays are to be installed such that the stay wire is left tight under normal working conditions, with
the stay load equally proportioned between the stays where multiple stays are employed.

Stay insulators shall be as detailed with ENA TS 43-91 Drawing Reference 439101 Type 1 for use at
11kV and for 33kV, two Type 2 insulators in an insulator link assembly Drawing Reference 439108
shall be used. Insulators shall be inserted in every stay wire in such a position that, with the stay
hanging down in a vertical position, the insulator shall be below the lowest bare conductor but in no
circumstance less than 3m above ground. On multiple stayed poles, insulators shall be staggered to
avoid clashing.

The method of installation of stays is detailed in OHL-21-001.

Rock stays and their method of installation will be of an Approved type. The method of installation is
detailed in OHL-21-001.

Power installed screw anchors may only be used with the agreement of the Engineer. The method of
installation is detailed in OHL-21-001.

© SP Power Systems Ltd Page 20 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.8 Line Conductors

The line conductors shall conform to Specification for Overhead Line Conductor INS 54.63.05 or OHL-
03-096 as applicable.

The use of PVC covered conductor for line conductor applications is not recommended and shall be
subject to approval by SP Energy Networks’ Lead Engineer for Circuits Development and/or the Head
of Engineering Design and Standards or their nominated representative.

12.8.1 Line Jumpers and Down Dropper Jumpers

The minimum length of HV jumpers shall be 1.2m and the maximum length of unsupported HV
jumpers shall be 2.0m.

Jumpers in excess of 2.0m in length shall be bare conductor and supported by pilot pin insulators.

All 33kV down dropper jumpers shall be bare conductor compressed directly onto a dead-end or the
overhead line conductor with the appropriate fitting.

11kV down dropper jumpers shall be manufactured from the appropriate multi-stranded flexible
conductor or from bare conductor to suit the overhead line conductor and the maximum anticipated
load of the line. 11kV jumpers of between 1.2m and 2.0m connected to transformers, pole
terminations, auto-reclosers, air break switch disconnectors (ABSD) and metal enclosed switches
shall be multi-stranded flexible conductor. Note: the maximum length of 65mm² flexible copper
jumpers shall be 1.5m.

Multi-strand flexible down dropper jumpers shall be fixed onto a live line bail using the appropriate
components. Bare down dropper conductors shall be compressed directly onto a dead-end or the
overhead line conductor with the appropriate fitting. Where flexible jumpers are to be installed on lines
with ACSR or AAAC conductor up to and including 100mm², either shear-off bolt bails or compression
bails shall be fitted to the line for the connection of down dropper jumpers. Where flexible jumpers are
to be installed on lines with 150mm² ACSR Dingo or 150mm² AAAC Ash conductors, only shear-off
bolt bails shall be installed. Note: where copper flexible jumpers are connected to aluminium
overhead lines, only shear-off bolt bails shall be installed.

Down droppers for pole mounted transformers shall be 50mm² flexible aluminium jumpers or 35mm²
flexible copper jumpers.

The method of installation of down dropper jumpers is detailed in OHL-22-006.

© SP Power Systems Ltd Page 21 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.9 Insulators and Conductor Fittings

Only Approved polymeric tension insulator sets shall be used at section and terminal positions, these
shall comply with ENA TS 43-93.
2
Where the conductor’s cross sectional area is in excess of 200mm the tension string crossarm
attachment components shall comprise of a BS 3288 Shackle Ref 28/29 and a BS 3288 Ball End Link
Ref 28/30. These components shall be substituted for item 15 of the structure general assembly
drawings. All components in the tension string including the tension insulator shall be rated at a
minimum value of 125kN. Where required Sag Adjuster Plates BS 3288 Ref 28/100 and an additional
BS 3288 Shackle Ref 28/29 may be installed as shown in appendix 7 in SP Energy Networks’
Drawing Reference SP4022218.

Non-tension insulators shall comply with ENA TS 43-93, Drawing Reference 439301 for 11kV and
Drawing Reference 439302 for 33kV.
2
Where the conductor cross sectional area is in excess of 200mm only Approved polymeric post type
insulators complying with ENA TS 43-93 with a separate armour grip suspension clamp top complying
with BS EN 61284 shall provide support at intermediate structures. These may also be employed as
support insulators at terminal and section structures. These post insulators shall be substituted for
items 11 & 12 of the structure general assembly drawings.

At earthed poles Approved polymeric insulators shall be used for all line insulation applications.

All Insulator and conductor fittings shall comply with BS 3288.

Arcing horns shall not be fitted to tension insulator sets.

Approved tension dead-ends can be either of the compression or helical type depending on the
conductor type. These shall meet the requirements of ENA TS 43-92.

Full tension mid-span joints shall only be used in exceptional circumstances and any such joint shall
be located at least 1 metre from any conductor dead-end, or conductor fitting. Non-tension joints shall
be of the compression type meeting the requirements of ENA TS 43-92.

12.10 Span Lengths

The basic span length adopted by this specification is dependent on the chosen conductor and the
environment in which the line will be situated and as such is specified in the appropriate conductor
appendices. Individual spans will normally be within ± 20% of the chosen basic span.

The average span length of every kilometre of line (not necessarily between section supports) shall
not be greater than the basic span.

In extreme circumstances an occasional maximum span shall be permitted. In such cases the
maximum span length for individual structures is given in Table 1 of appendices 1 to 6.

No more than two adjacent maximum spans shall be permitted as detailed in Table 1 of appendices 1
to 6.

Where Long Span “H” Pole Structures are employed, in line stays shall be installed against the long
spans to reduce the effect of out of balance tensions on the adjacent spans.

© SP Power Systems Ltd Page 22 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.11 Section Lengths

Section lengths, defined as the length between two section supports, shall not exceed 1000m.

12.12 Conductor Design/Erection Sags and Tensions

Ordinates for plotting uplift curves are based on conductor design tensions.

Ordinates for plotting ground clearance curves assume the use of new conductor and include an
allowance for long-term creep over a period of 25 years.

Conductor design sags / tensions are given in Table 2 of appendices 1 to 6.

Erection sags and tensions are given in Table 4 of appendices 1 to 6 and are based on the conductor
design tensions and have been subject to a 10% over tension to accommodate the short-term creep
of the conductor during the life of the line.

The conductors shall be pre-tensioned for a minimum time of 60 minutes. At 15-minute intervals
during this period, the tension or sag shall be adjusted in order to maintain the correct value.

Conductor pre-tension sags / tensions are given in Table 3 of appendices 1 to 6.

The erection sags given in Table 4 of appendices 1 to 6 have been calculated from the conductor
design tensions.

12.13 Conductor Spacing and Clearances

The mid span conductor phase spacing generally limits the maximum span lengths detailed in Table 1
of appendices 1 to 6. The following values have been used to establish the values in Table 1.

The standard conductor spacing is 1.2m on intermediate and terminal supports.

The conductor spacing for section angle supports ≤ 60º is 1.21m.

The conductor spacing for section angle supports ≥ 60º ≤ 75º is 1.11m.

The conductor spacing for long span “H” section angle supports ≤ 30º is 1.93m.

The likely maximum conductor temperature for the purpose of assessing clearances is specific to the
chosen conductor and is specified in the relevant appendices.

The minimum electrical clearance between any energised unsupported conductor and an insulator
support, steelwork, stay wire (earthed or unearthed) or stay-bonding device shall not be less than
th
300mm as per rule A2.3 of the Scottish Power Limited Safety Rules (Electrical and Mechanical) 4
Edition.

The minimum electrical clearance between energised unsupported conductors shall be as per OHL-
14-005 or ENA TS 43-8.

12.13.1 Minimum Height of Line Conductors

The height above ground of any line conductor, or any wire or cable attached to a pole carrying any
line conductor, shall not, at its likely maximum temperature, be less than the value specified in OHL-
14-005 at any point. In order to calculate the height above ground of a line conductor, the appropriate
sag for the span length and maximum operating temperature must first be selected from Table 2 of
the appropriate appendix.

© SP Power Systems Ltd Page 23 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.13.2 Summary of Statutory Ground Clearances

Minimum ground clearances shall be in accordance with OHL-14-005.

To ensure compliance with the above statutory clearances, an additional 450mm shall be added to
the profile ground clearance (at maximum still air sag condition) to allow for minor variations in ground
level due to farming activities.

12.13.3 Clearances to Obstacles

With the line conductors at the likely maximum temperature in still air or deflected at any angle up to
45º from the vertical, the minimum clearances detailed in OHL-14-005 shall be achieved.

12.13.4 Clearances to other Power Lines

Where power lines cross over or are in proximity to one another, the voltage of the power line with the
higher system voltage as detailed in OHL-14-005 shall determine clearances.

12.13.5 Railway and Canal Crossings

When an overhead line is erected along, or across, a railway, canal or navigable river it shall comply
with such arrangements as may be prescribed, or as may be agreed with the authorities concerned to
meet local or special conditions as detailed in OHL-14-005.

12.13.6 Telecommunications Crossings

Where an overhead line to this specification crosses or is in proximity to a telecommunications line,


precautions shall be taken to prevent contact between the two lines as detailed in OHL-14-005 with
further guidance available in ENA ER-PO5.

12.13.7 Road / Motorway Crossings

Where a line to this specification crosses a motorway or other designated “6.1m high load route” road,
the minimum height of the conductors at the likely maximum conductor temperature must be at least
6.9m above the carriageway surface as detailed in OHL-14-005. Where it is necessary to employ a
“sky cradle” during erection or maintenance works, a clearance of 8.2m must be provided between the
line conductor and carriageway surface. Where a “sky cradle” cannot be used, scaffolding should be
employed over a motorway. In such instance, a clearance of 14m should be ensured between the line
conductor and the surface of a normal 3-lane motorway. Details of the design and use of temporary
scaffold guards can be found in ENA TS 43-119.

12.14 Safety Signs and Number Plates

Safety signs shall be fitted to all supports in accordance with ASSET-01-021.

All poles shall be labelled in accordance with OHL-23-002 or OHL-23-004.

© SP Power Systems Ltd Page 24 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.15 Anti-Climbing Devices

Anti-climbing devices in accordance with ENA TS 43-90 shall be fitted to supports in accordance with
ASSET-01-021.

Anti-climbing devices shall be fitted to all stays.

Outrigger brackets shall conform to ENA TS 43-95 Drawing Reference 439516. The minimum quality
of barbed wire shall be to BS 4102 Section 4 (galvanised steel) with barbs of 85mm spacing. Similar
wire but with the spacing of the barbs set at 50mm is commonly used and is also acceptable. In areas
where there is the possibility of severe corrosion, stainless steel barbed wire is recommended. Wire
staples shall be of sufficient size to firmly hold the wire in place and be galvanised to BS EN 10244-2.

12.16 Bonding and Earthing

Steelwork on poles shall NOT be earthed except where transformers, ground-operated switchgear,
cable terminations or surge arresters are to be fitted. At such positions all steelwork and other
supporting metalwork mounted on the pole above the anti-climbing device shall be bonded and
earthed in accordance with the requirements specified hereunder. Where the pole is not earthed, all
steelwork above the anti-climbing device shall be bonded together. Steelwork below the anti-climbing
device shall not be bonded or earthed unless ground operated switchgear operating handles are
installed below the anti-climbing device.

The earthing and bonding conductor shall be stranded copper conductors of a minimum cross
sectional area of 35mm² for 11kV and 70mm² for 33kV. The earthing and bonding conductor shall be
green/yellow PVC covered.

The top section of stays shall always be bonded to the adjacent steelwork, regardless of whether the
steelwork itself is earthed.

The earthing conductor shall be connected to one or more Approved earth rods at a minimum depth
of 600mm to establish an earth electrode with a maximum resistance value of 40 ohms. The first earth
rod shall be positioned as close as possible to the base of the pole.

Where appropriate, deep driving of earth rods can be employed as an alternative to a multi-rod
installation.

The earthing conductor shall be protected from the bottom of the pole to above the anti-climbing
device by an insulated 3.0m long cable guard buried in the ground to a depth of 150mm.

The method of installation of earthing for switchgear is detailed in OHL-25-007.

12.16.1 Neutral Earths

Where there is a requirement to install a LV neutral earth on any structure the method of installation is
detailed in OHL-25-002.

The neutral earth conductor up to the first earth rod shall be 35mm² copper conductor for transformers
up to and including 100kVA and 70mm² copper conductor for 200kVA transformers. The neutral earth
conductor up to the first earth rod shall be black in colour and PVC covered.

© SP Power Systems Ltd Page 25 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.17 11kV Transformers

Transformers in excess of 25kVA and up to and including 100kVA may be mounted on single poles
structures (Drawing Reference SP4020581). This is dependent on the transformer manufacturer and
mounting arrangements available.

Transformers in excess of 100kVA shall only be mounted on “H” Poles (Drawing Reference
SP4020580).

An alternative to an “H” Pole may be a single pole and lay leg structure. Where a lay leg is the
preferred method of installation, these poles should be obtained at the required length from the pole
supplier. Poles shall not be cut to length on site.

At such positions all steelwork and other supporting metalwork mounted on the pole above the anti-
climbing device shall be bonded and earthed in accordance with the requirements specified in Section
12.16.

The down dropper jumpers shall be installed in accordance with the requirements specified in Section
12.8.1.

The methods of installation of transformers are detailed in OHL-22-001.

The transformer LV neutral earth shall be installed in accordance with the requirements specified in
Section 12.16.1.

12.18 Switchgear

All switchgear, with the exception of switchgear with the unearthed hook stick method of operation,
shall be installed on earthed poles in accordance with the requirements specified in Section 12.16.
They shall be erected at the pole top below the line conductors.

Surge arresters shall be installed as directed by the Engineer and shall be fitted in accordance with
Section 12.21.

For 11kV applications the down dropper jumpers shall be installed in accordance with the
requirements specified in OHL-22-006.

The methods of installation of Pole Mounted Switchgear are detailed in OHL-22-010, OHL-22-012,
OHL-22-013 and OHL-22-026.

12.19 Air Break Switch Disconnectors (ABSD)

ABSDs shall not be installed on earthed poles. They shall be of an unearthed hook stick operated
type, erected in a horizontal position at the pole top below the line conductors.

At such positions all steelwork and other supporting metalwork mounted on the pole above the anti-
climbing device, if fitted, shall be bonded in accordance with the requirements specified in Section
12.16.

For 11kV applications the down dropper jumpers shall be installed in accordance with the
requirements specified in OHL-22-006.

The method of installation of ABSDs is detailed in OHL-22-010.

© SP Power Systems Ltd Page 26 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

12.20 HV Cable Terminations

All HV cables shall be terminated using Approved terminations on poles below the conductors in
accordance with OHL-18-017 and OHL-18-019.

The jumpers shall be installed in accordance with Section 12.8.1. All connectors shall satisfy the
requirements of ENA TS 43-92.

The HV cable shall be secured from 200mm below ground level up to the termination and it shall be
protected from the bottom of the pole to above the anti-climbing device by an insulated 3.0m long
cable guard buried in the ground to a depth of 150mm. Cognisance should be taken of the
requirements of OHL-25-007 when considering the routing of the cable and associated earthing
system.

All metalwork on the pole including the cable termination associated mounting steelwork and metallic
cable sheath/screen above the anti-climbing device shall be bonded and earthed in accordance with
Section 12.16. There may be exceptional circumstances where the bonding and earthing
arrangements require a site specific solution and this shall be clarified by the design engineer.

Surge arresters shall normally be incorporated in the cable termination and shall be fitted in
accordance with Section 12.21.

12.21 Surge Arresters

Approved surge arresters shall be fitted to protect cables, metal enclosed switchgear and elsewhere
directed by the Engineer.

Where surge arresters are to be erected on a pole, whether incorporated in a cable termination or
directly mounted on an item of plant, they shall be connected directly in the current path as close to
the plant or cable termination lugs as possible. One continuous 70mm² copper conductor which shall
be green/yellow PVC covered, shall be installed directly from the apparatus earthing terminal or the
outer surge arrester to the first earth rod which shall be positioned as close as possible to the base of
the pole. The metallic cable sheath/screen of underground cables shall be connected to the crucifix
star point, which shall then be connected to the surge arrester earth by a 70mm² copper conductor,
which shall also be green/yellow PVC covered.

All other metalwork on the pole including the cable termination associated mounting steelwork above
the anti-climbing device shall be bonded to the surge arrester earth by a 35mm² copper conductor for
11kV and a 70mm² copper conductor for 33kV applications. The bonding conductor shall be
green/yellow PVC covered in accordance with Section 12.16. The earth electrode shall have a
maximum resistance value of 10 Ohms.

12.22 Insulated Shrouding

Insulated shrouding shall be fitted to all 11kV plant and equipment as directed by the Engineer.
Further guidance can be found in OHL-22-020.

© SP Power Systems Ltd Page 27 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

13. APPENDICES SUMMARY

2
Appendix 1 11kV Normal Weather Area 50mm AAAC “Hazel” Conductor (L10)

2
Appendix 2 11kV Severe Weather Area 100mm AAAC “Oak” Conductor (L27)

2
Appendix 3 33kV Normal Weather Area 150mm AAAC “Ash” Conductor (L27)

2
Appendix 4 33kV Normal Weather Area 200mm AAAC “Poplar” Conductor (L33)

2
Appendix 5 33kV Severe Weather Area 200mm AAAC “Poplar” Conductor (L33)

2
Appendix 6 33kV Severe Weather Area 300mm AAAC “Upas” Conductor (L35)

Appendix 7 Installation requirements for Conductors incorporating Optical Fibres (L34 & L36)

Appendix 8 Installation Requirements for Horse OPGW

© SP Power Systems Ltd Page 28 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14. APPENDIX 1 – 11kV NORMAL WEATHER AREA 50MM AAAC “HAZEL” CONDUCTOR
(L10)

14.1 Design Parameters

Design Parameters
Conductor Code Name Hazel
Greased Conductor Weight (kg/m) 0.1648
Cross Sectional Area of Conductor (mm²) 59.9
Conductor Overall Diameter (mm) 9.9
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 6016.3257
Rated Breaking Strength of Conductor (kgf) 1800.8
Basic / Recommended Span (m) 100
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 720.3
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 360.2
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 666.2
Maximum Conductor Weight (MCW) (kg/m) 0.378
Maximum Conductor Pressure (MCP) (kg/m) 0.771
Freezing Point Tension (FPT) (kgf) @ 0ºC 396.2
Equipment Weight (kg) 600

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 50ºC

Factors of Safety
Unstayed Poles 3.5
Pole Foundations 2.5
Stayed Poles 2.5
Stays 2.5
Steelwork 2.5
Pin Insulators 2.5

© SP Power Systems Ltd Page 29 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.2 Table 1 – Support Types and Duties Table for 50mm “Hazel” AAAC

Angle of Line SP Energy Networks’


Structure Type Max Span Length (m) Max Gradient
Deviation Drawing Reference
100 1:10 0°
Intermediate Single Pole SP2147473
90 1:5* 0°

Pin Angle Single Pole 100 1:10 10° SP2147473

Single Pole 109 1:10 0° SP2147476

Straight Section H Pole 109 1:10 0° SP4019003

H Pole (Long Span) 130 1:10 0° SP2147486

Single Pole 110 1:10 60° SP2147476

Single Pole 100 1:10 75° SP2147476


Angle Section
H Pole 110 1:10 75° SP4019003

H Pole (Long Span) 130 1:10 30° SP2147486

Double Terminal Single Pole 100 1:10 100° SP4000578

Single Pole 114 1:5 0° SP2147474


Terminal
H Pole 114 1:5 0° SP2147485
Note: * See Section 12.2.2 for guidance on hillside applications.

© SP Power Systems Ltd Page 30 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

14.3 Table 2 – Conductor Design Table for 50mm² “Hazel” AAAC

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 440.9 0.12 0.17 0.23 0.30 0.38 0.47 0.57 0.67 0.79
0 396.2 0.13 0.19 0.25 0.33 0.42 0.52 0.63 0.75 0.88
5 360.2 0.14 0.21 0.28 0.37 0.46 0.57 0.69 0.82 0.97
10 325.7 0.16 0.23 0.31 0.40 0.51 0.63 0.77 0.91 1.07
15 293.3 0.18 0.25 0.34 0.45 0.57 0.70 0.85 1.01 1.19
20 263.2 0.20 0.28 0.38 0.50 0.63 0.78 0.95 1.13 1.32
25 236.1 0.22 0.31 0.43 0.56 0.71 0.87 1.06 1.26 1.47
30 212.1 0.24 0.35 0.48 0.62 0.79 0.97 1.18 1.40 1.64
35 191.4 0.27 0.39 0.53 0.69 0.87 1.08 1.30 1.55 1.82
40 173.7 0.30 0.43 0.58 0.76 0.96 1.19 1.43 1.71 2.00
45 158.8 0.32 0.47 0.64 0.83 1.05 1.30 1.57 1.87 2.19
50 146.3 0.35 0.51 0.69 0.90 1.14 1.41 1.70 2.03 2.38
55 135.7 0.38 0.55 0.74 0.97 1.23 1.52 1.84 2.19 2.57
60 126.7 0.41 0.59 0.80 1.04 1.32 1.63 1.97 2.34 2.75
65 119.1 0.43 0.62 0.85 1.11 1.40 1.73 2.09 2.49 2.92
70 112.5 0.46 0.66 0.90 1.17 1.48 1.83 2.22 2.64 3.10
75 106.7 0.48 0.70 0.95 1.24 1.56 1.93 2.34 2.78 3.26
80 101.7 0.51 0.73 0.99 1.30 1.64 2.03 2.45 2.92 3.42

© SP Power Systems Ltd Page 31 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.4 Table 3 – Conductor Pre-Tension Table for 50mm “Hazel” AAAC

Pre-tension at all Sag (m) for Span (m)


temperatures
(kgf) 50 60 70 80 90 100 110 120 130
495 kgf 0.10 0.15 0.20 0.27 0.34 0.42 0.50 0.60 0.70

2
14.5 Table 4 – Conductor Erection Table for 50mm “Hazel” AAAC

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 475.5 0.11 0.16 0.21 0.28 0.35 0.43 0.52 0.62 0.73
0 429.8 0.12 0.17 0.23 0.31 0.39 0.48 0.58 0.69 0.81
5 392.7 0.13 0.19 0.26 0.34 0.42 0.52 0.63 0.76 0.89
10 356.9 0.14 0.21 0.28 0.37 0.47 0.58 0.70 0.83 0.98
15 322.6 0.16 0.23 0.31 0.41 0.52 0.64 0.77 0.92 1.08
20 290.3 0.18 0.26 0.35 0.45 0.57 0.71 0.86 1.02 1.20
25 260.6 0.20 0.28 0.39 0.51 0.64 0.79 0.96 1.14 1.34
30 233.7 0.22 0.32 0.43 0.56 0.71 0.88 1.07 1.27 1.49
35 210.1 0.25 0.35 0.48 0.63 0.79 0.98 1.19 1.41 1.66
40 189.6 0.27 0.39 0.53 0.70 0.88 1.09 1.31 1.56 1.84
45 172.2 0.30 0.43 0.59 0.77 0.97 1.20 1.45 1.72 2.02
50 157.6 0.33 0.47 0.64 0.84 1.06 1.31 1.58 1.88 2.21
55 145.2 0.35 0.51 0.70 0.91 1.15 1.42 1.72 2.04 2.40
60 134.8 0.38 0.55 0.75 0.98 1.24 1.53 1.85 2.20 2.58
65 126.0 0.41 0.59 0.80 1.05 1.32 1.64 1.98 2.35 2.76
70 118.4 0.43 0.63 0.85 1.11 1.41 1.74 2.11 2.51 2.94
75 111.9 0.46 0.66 0.90 1.18 1.49 1.84 2.23 2.65 3.11
80 106.2 0.48 0.70 0.95 1.24 1.57 1.94 2.35 2.79 3.28

© SP Power Systems Ltd Page 32 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.6 Table 5 – Maximum Angle of Deviation for Single Poles for 50mm “Hazel” AAAC

Grade 1150 Stay Wire


Angle of Stay Slope
1 x 7/4.00mm 2 x 7/4.00mm
30° 25° 45°
35° 35° 55°
40° 40° 65°
45° 45° 75°

2
14.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 50mm “Hazel” AAAC

Grade 1150 Stay Wire


Angle of Stay Slope
2 x 7/4.00mm 3 x 7/4.00mm
30° 75° 90°
35° 75° 90°
40° 75° 90°
45° 75° 90°
Note: The minimum grade of pole for angles in excess of 5° shall be stout as defined in BS 1990.

For single pole angles between 75° and 100° a double terminal structure shall be used (SP
Energy Networks’ Drawing Reference SP4000578).

Where a double terminal structure is employed it shall be fitted with 4 splayed stays.

Where two stays are installed on an H pole structure they shall both be fitted to the outer limb.

© SP Power Systems Ltd Page 33 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 50mm “Hazel”
AAAC

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 4196 3925 3715 3544
5° 4950 4547 4234 3980
10° 5700 5166 4750 4413
15° 6445 5780 5263 4843
20° 7184 6389 5771 5270
25° 7915 6992 6274 5692
30° 8636 7587 6770 6108
35° 9347 8173 7260 6519
Level Conditions
40° 10046 8749 7740 6922
45° 10732 9315 8212 7318
50° 11403 9868 8674 7705
55° 12058 10408 9125 8084
60°* 12696 10934 9563 8452
65° 13315 11445 9990 8810
70° 13915 11939 10403 9156
75° 14494 12417 10801 9490
0° 5190 4920 4709 4539
5° 5944 5541 5228 4974
10° 6694 6160 5744 5407
15° 7439 6774 6257 5837
20° 8909 7986 7268 6686
25° 8909 7986 7268 6686
30° 9631 8581 7765 7102
35° 10341 9167 8254 7513
Downpull 1:10
40° 11040 9744 8735 7916
45° 11726 10309 9207 8312
50° 12397 10862 9668 8700
55° 13052 11402 10119 9078
60°* 13690 11928 10558 9446
65° 14310 12439 10984 9804
70° 14910 12934 11397 10150
75° 15489 13411 11796 10485
Note: * Denotes value for selection of terminal pole at specified gradient.

© SP Power Systems Ltd Page 34 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.9 Table 8 – Strut Load in “H” Poles with Two or Three Stays (kgf) for 50mm “Hazel”
AAAC

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 2369 2186 2044 1929
5° 2821 2559 2355 2190
10° 3271 2930 2665 2450
15° 3718 3299 2972 2708
20° 4161 3664 3277 2964
25° 4600 4026 3579 3217
30° 5033 4383 3877 3467
35° 5459 4734 4171 3713
40° 5879 5080 4459 3955
Level Conditions 45° 6290 5419 4742 4193
50° 6693 5751 5019 4425
55° 7086 6075 5290 4652
60°* 7469 6391 5553 4873
65° 7840 6698 5809 5088
70° 8200 6994 6056 5295
75° 8548 7281 6296 5496
80° 8882 7557 6526 5689
85° 9203 7821 6746 5874
90° 9510 8074 6957 6051
0° 2866 2683 2541 2426
5° 3318 3056 2852 2687
10° 3768 3427 3162 2947
15° 4215 3796 3470 3205
20° 4659 4161 3775 3461
25° 5097 4523 4076 3714
30° 5530 4880 4374 3964
35° 5957 5232 4668 4210
40° 6376 5577 4956 4452
45° 6787 5917 5239 4690
50° 7190 6249 5516 4922
55° 7583 6573 5787 5149
Downpull 1:10 60°* 7966 6888 6050 5370
65° 8337 7195 6306 5585
70° 8697 7492 6554 5793
75° 9045 7778 6793 5993
80° 9380 8054 7023 6186
85° 9700 8318 7244 6372
90° 10007 8571 7454 6549
65° 8820 7677 6789 6068
70° 9180 7974 7036 6275
75° 9528 8261 7275 6476
80° 9862 8537 7506 6669
85° 10183 8801 7726 6854
90° 10490 9054 7937 7031
Note: * Denotes value for selection of terminal pole at specified gradient.

© SP Power Systems Ltd Page 35 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

14.10 Table 9 – Strut Load in Single Pole Double Terminal Structures with Four Stays (kgf)
2
for 50mm “Hazel” AAAC

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
75° 14494 12417 10801 9490
80° 15052 12877 11185 9812
85° 15587 13318 11553 10121
Level Conditions
90° 16097 13739 11904 10416
95° 16583 14139 12238 10696
100° 17043 14519 12555 10962
75° 15489 13411 11796 10485
80° 16046 13871 12179 10807
85° 16581 14312 12547 11115
Downpull 1:10
90° 17092 14733 12898 11410
95° 17578 15134 13233 11691
100° 18038 15513 13549 11956

2
14.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 50mm “Hazel”
AAAC

LINE ANGLE Structure Back Stay Angle (64°)


Level Conditions Construction Terminal 5622 kgf
Downpull 1:10 Construction Terminal 6617 kgf

© SP Power Systems Ltd Page 36 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.12 Table 11 – Stayed Pole Strut Capabilities for 50mm “Hazel” AAAC

Pole Pole Top Dia. Dia. 1.5m Taper Planting Depth Pole Strut Strength
(m) (mm) from Butt (mm/m) (mm) (kgf)
8.5 190 265 10.71 1800 19916
9 190 275 11.33 1800 18368
9.5 190 280 11.25 1800 16546
10 190 285 11.18 1800 15030
10 209 305 11.25 1800 21022
10.5 190 290 11.11 1800 13750
10.5 209 310 11.25 1800 19061
11 190 295 11.05 1800 12662
11 208 315 11.25 1800 17397
11.5 190 300 11.00 2000 12069
11.5 208 320 11.25 2000 16448
12 190 305 10.95 2000 11213
12 207 325 11.25 2000 15148
12 227 345 11.25 2000 20664
13 195 320 10.87 2000 10683
13 211 340 11.25 2000 14105
13 231 360 11.25 2000 19073
14 195 335 11.20 2000 9761
14 214 355 11.25 2000 13308
14 234 375 11.25 2000 17846
15 195 350 11.48 2200 9200
15 218 370 11.25 2200 12946
15 238 390 11.25 2200 17238
16 200 365 11.38 2200 9034
16 222 385 11.25 2200 12430
16 242 405 11.25 2200 16428
17 200 375 11.29 2200 8271
17 221 395 11.25 2200 11202
17 241 415 11.25 2200 14770
18 200 390 11.52 2400 7946
18 224 410 11.25 2400 11093
18 244 430 11.25 2400 14533
20 200 415 11.62 2400 7070
20 227 435 11.25 2400 9998
20 247 455 11.25 2400 12984
22 200 435 11.46 2400 6282
22 224 455 11.25 2400 8620
22 244 475 11.25 2400 11147

© SP Power Systems Ltd Page 37 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
14.13 Table 12 – Pole Sizing for Single Pole Intermediate and Section Poles for 50mm
“Hazel” AAAC

Pole Maximum Wind Span Length (m)


Length 50 60 70 80 90 100 110 120 130
(m) Diameter of Pole 1.5m from Butt (mm)
8.5 235 235 235 235 235 235 265 2 x 235 2 x 235
9 240 240 240 240 240 240 275 2 x 240 2 x 240
9.5 245 245 245 245 245 245 280 2 x 245 2 x 245
10 250 250 250 250 250 250 285 2 x 250 2 x 250
10.5 255 255 255 255 255 255 290 2 x 255 2 x 255
11 260 260 260 260 260 260 295 2 x 260 2 x 260
11.5 265 265 265 265 265 265 300 2 x 265 2 x 265
12 270 270 270 270 270 270 305 2 x 270 2 x 270
13 280 280 280 280 280 280 320 2 x 280 2 x 280
14 295 295 295 295 295 295 335 2 x 295 2 x 295
15 310 310 310 310 310 310 350 2 x 310 2 x 310
16 325 325 325 325 325 325 365 2 x 325 2 x 325
17 340 340 340 340 340 340 375 2 x 340 2 x 340
18 350 350 350 350 350 350 390 2 x 350 2 x 350
20 380 380 380 380 380 380 415 2 x 380 2 x 380
22 400 400 400 400 400 400 435 2 x 400 2 x 400

Pole Length (m) Foundation Depth (m)


8.5 – 11.0 inc. 1.8
11.5 – 14.0 inc. 2.0
15.0 – 17.0 inc. 2.2
18.0 – 22.0 inc 2.4

© SP Power Systems Ltd Page 38 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15. APPENDIX 2 – 11kV SEVERE WEATHER AREA 100MM AAAC “OAK” CONDUCTOR
(L27)

15.1 Design Parameters

Design Parameters
Conductor Code name Oak
Greased Conductor Weight (kg/m) 0.3273
Cross Sectional Area of Conductor (mm²) 118.9
Conductor Overall Diameter (mm) 14
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 6016.3257
Rated Breaking Strength of Conductor (kgf) 3576.1
Basic / Recommended Span (m) 90
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1151.0
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 715.2
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1151.0
Maximum Conductor Weight (MCW) (kg/m) 0.968
Maximum Conductor Pressure (MCP) (kg/m) 1.279
Freezing Point Tension (FPT) (kgf) @ 0ºC 651.2
Equipment Weight (kg) 600

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 50ºC

Factors of Safety
Unstayed Poles 3.5
Pole Foundations 2.5
Stayed Poles 2.5
Stays 2.5
Steelwork 2.5
Pin Insulators 2.5

© SP Power Systems Ltd Page 39 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

15.2 Table 1 – Support Types and Duties Table for 100mm2 “Oak” AAAC (Severe Weather Area)

Angle of Line SP Energy Networks’


Structure Type Max Span Length (m) Max Gradient
Deviation Drawing Reference
95 1:10 0°
Intermediate Single Pole SP2147473
90 1:5* 0°

Single Pole 103 1:10 0° SP2147476

Straight Section H Pole 103 1:10 0° SP4019003

H Pole (Long Span) 123 1:10 0° SP2147486

Single Pole 100 1:10 60° SP2147476

Angle Section H Pole 100 1:10 75° SP4019003

H Pole (Long Span) 130 1:10 30° SP2147486

Single Pole 105 1:10 0° SP2147474


Terminal
H Pole 105 1:5 0° SP2147485
Note: * See Section 12.2.2 for guidance on hillside applications.

© SP Power Systems Ltd Page 40 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

15.3 Table 2 – Conductor Design Table for 100mm² “Oak” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 736.6 0.14 0.20 0.27 0.36 0.45 0.56 0.67 0.80 0.94
0 651.2 0.16 0.23 0.31 0.40 0.51 0.63 0.76 0.90 1.06
5 583.9 0.18 0.25 0.34 0.45 0.57 0.70 0.85 1.01 1.18
10 521.0 0.20 0.28 0.38 0.50 0.64 0.79 0.95 1.13 1.33
15 463.7 0.22 0.32 0.43 0.56 0.71 0.88 1.07 1.27 1.49
20 412.9 0.25 0.36 0.49 0.63 0.80 0.99 1.20 1.43 1.67
25 368.9 0.28 0.40 0.54 0.71 0.90 1.11 1.34 1.60 1.87
30 331.7 0.31 0.44 0.60 0.79 1.00 1.23 1.49 1.78 2.08
35 300.6 0.34 0.49 0.67 0.87 1.10 1.36 1.65 1.96 2.30
40 274.7 0.37 0.54 0.73 0.95 1.21 1.49 1.80 2.14 2.52
45 253.2 0.40 0.58 0.79 1.03 1.31 1.62 1.95 2.33 2.73
50 235.2 0.43 0.63 0.85 1.11 1.41 1.74 2.10 2.50 2.94
55 219.9 0.47 0.67 0.91 1.19 1.51 1.86 2.25 2.68 3.14
60 207.0 0.49 0.71 0.97 1.27 1.60 1.98 2.39 2.85 3.34
65 195.8 0.52 0.75 1.02 1.34 1.69 2.09 2.53 3.01 3.53
70 186.0 0.55 0.79 1.08 1.41 1.78 2.20 2.66 3.17 3.72
75 177.5 0.58 0.83 1.13 1.48 1.87 2.31 2.79 3.32 3.90
80 169.9 0.60 0.87 1.18 1.54 1.95 2.41 2.91 3.47 4.07

© SP Power Systems Ltd Page 41 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15.4 Table 3 – Conductor Pre-Tension Table for 100mm “Oak” AAAC (Severe Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
828 0.12 0.18 0.24 0.32 0.40 0.49 0.60 0.71 0.83

2
15.5 Table 4 – Conductor Erection Table for 100mm “Oak” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 796.9 0.13 0.18 0.25 0.33 0.42 0.51 0.62 0.74 0.87
0 709.0 0.14 0.21 0.28 0.37 0.47 0.58 0.70 0.83 0.98
5 638.6 0.16 0.23 0.31 0.41 0.52 0.64 0.78 0.92 1.08
10 572.0 0.18 0.26 0.35 0.46 0.58 0.72 0.87 1.03 1.21
15 510.1 0.20 0.29 0.39 0.51 0.65 0.80 0.97 1.15 1.36
20 453.9 0.23 0.32 0.44 0.58 0.73 0.90 1.09 1.30 1.52
25 404.4 0.25 0.36 0.50 0.65 0.82 1.01 1.22 1.46 1.71
30 361.7 0.28 0.41 0.55 0.72 0.92 1.13 1.37 1.63 1.91
35 325.6 0.31 0.45 0.62 0.80 1.02 1.26 1.52 1.81 2.12
40 295.5 0.35 0.50 0.68 0.89 1.12 1.38 1.68 1.99 2.34
45 270.5 0.38 0.54 0.74 0.97 1.23 1.51 1.83 2.18 2.56
50 249.7 0.41 0.59 0.80 1.05 1.33 1.64 1.98 2.36 2.77
55 232.2 0.44 0.63 0.86 1.13 1.43 1.76 2.13 2.54 2.98
60 217.4 0.47 0.68 0.92 1.20 1.52 1.88 2.28 2.71 3.18
65 204.8 0.50 0.72 0.98 1.28 1.62 2.00 2.42 2.88 3.38
70 193.9 0.53 0.76 1.03 1.35 1.71 2.11 2.55 3.04 3.57
75 184.4 0.55 0.80 1.09 1.42 1.80 2.22 2.69 3.20 3.75
80 176.0 0.58 0.84 1.14 1.49 1.88 2.32 2.81 3.35 3.93

© SP Power Systems Ltd Page 42 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15.6 Table 5 – Maximum Angle of Deviation for Single Poles for 100mm “Oak” AAAC
(Severe Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
1 x 7/4.00mm 2 x 7/4.00mm
30° 25° 30°
35° 30° 45°
40° 35° 50°
45° 40° 60°

2
15.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 100mm “Oak” AAAC (Severe
Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
3 x 7/4.00mm 4 x 7/4.00mm
30° 75° 90°
35° 75° 90°
40° 75° 90°
45° 75° 90°

© SP Power Systems Ltd Page 43 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 100mm “Oak”
AAAC (Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 5462 5059 4745 4490
5° 6765 6133 5641 5242
10° 8061 7202 6533 5991
15° 9349 8264 7419 6734
20° 10626 9316 8298 7472
25° 11889 10358 9167 8201
Level Conditions 30° 13137 11387 10025 8921
35° 14366 12400 10871 9631
40° 15575 13397 11703 10329
45° 16760 14375 12519 11013
50° 17921 15332 13317 11683
55° 19054 16266 14097 12338
60° 20158 17176 14857* 12975*
0° 7180 6777 6463 6208
5° 8483 7851 7359 6960
10° 9779 8920 8251 7709
15° 11067 9982 9137 8452
20° 13607 12076 10885 9919
25° 13607 12076 10885 9919
Downpull 1:10 30° 14855 13105 11743 10639
35° 16084 14118 12589 11349
40° 17293 15115 13421 12047
45° 18478 16093 14237 12731
50° 19639 17050 15035 13401
55° 20772 17984 15815 14056
60° 21876 18894 16575* 14693*
0° 8848 8445 8131 7876
5° 10151 9519 9027 8628
10° 11447 10588 9919 9377
15° 12735 11650 10805 10120
20° 15275 13744 12553 11587
25° 15275 13744 12553 11587
Downpull 1:5 30° 16523 14773 13411 12307
35° 17752 15786 14257 13017
40° 18961 16783 15089 13715
45° 20146 17761 15905 14399
50° 21307 18718 16703 15069
55° 22440 19652 17483 15724
60° 23544 20562 18243 16361*
Note: * Denotes value for selection of terminal pole at specified gradient.

© SP Power Systems Ltd Page 44 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 100mm “Oak” AAAC
(Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3078 2815 2611 2445
5° 3859 3460 3149 2896
10° 4637 4101 3684 3346
15° 5410 4738 4216 3792
20° 6176 5370 4743 4234
25° 6934 5995 5264 4672
30° 7682 6612 5779 5104
35° 8420 7220 6287 5530
40° 9145 7818 6786 5948
Level Conditions 45° 9857 8405 7275 6359
50° 10553 8979 7754 6761
55° 11233 9540 8222 7154
60°* 11895 10086 8678 7536
65° 12539 10616 9121 7908
70° 13162 11130 9549 8267
75° 13763 11626 9963 8615
80° 14343 12104 10362 8949
85° 14898 12562 10744 9270
90° 15429 12999 11109 9576
0° 3937 3674 3470 3304
5° 4718 4318 4008 3755
10° 5496 4960 4543 4205
15° 6269 5597 5075 4651
20° 7035 6229 5602 5093
25° 7793 6854 6123 5531
30° 8541 7471 6638 5963
35° 9279 8079 7146 6389
40° 10004 8677 7645 6807
Downpull 1:10 45° 10716 9264 8134 7218
50° 11412 9838 8613 7620
55° 12092 10398 9081 8013
60°* 12754 10945 9537 8395
65° 13397 11475 9980 8766
70° 14021 11989 10408 9126
75° 14622 12485 10822 9474
80° 15202 12962 11221 9808
85° 15757 13421 11603 10129
90° 16288 13858 11968 10435
Note: * Denotes value for selection of terminal pole at specified gradient.

© SP Power Systems Ltd Page 45 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 100mm “Oak” AAAC
(Severe Weather Area) (Cont.)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 4771 4508 4304 4138
5° 5552 5152 4842 4589
10° 6330 5794 5377 5039
15° 7103 6431 5909 5485
20° 7869 7063 6436 5927
25° 8627 7688 6957 6365
30° 9375 8305 7472 6797
35° 10113 8913 7980 7223
40° 10838 9511 8479 7641
Downpull 1:5 45° 11550 10098 8968 8052
50° 12246 10672 9447 8454
55° 12926 11232 9915 8847
60°* 13588 11779 10371 9229
65° 14231 12309 10814 9600
70° 14855 12823 11242 9960
75° 15456 13319 11656 10308
80° 16036 13796 12055 10642
85° 16591 14255 12437 10963
90° 17122 14692 12802 11269
Note: * Denotes value for selection of terminal pole at specified gradient.

2
15.10 Table 9 – Strut Loading in Single Pole Construction Terminals (kgf) for 100mm “Oak”
AAAC (Severe Weather Area)

LINE ANGLE Structure Back Stay Angle (64°)


Level Conditions Construction Terminal 8191 kgf
Downpull 1:5 Construction Terminal 11577 kgf

© SP Power Systems Ltd Page 46 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15.11 Table 10 – Stayed Pole Strut Capabilities for 100mm “Oak” AAAC (Severe Weather
Area)

Pole Pole Top Dia. Dia. 1.5m Taper Planting Depth Pole Strut Strength
(m) (mm) from Butt (mm/m) (mm) (kgf)
8.5 190 265 10.71 2000 20881
8.5 206 285 11.25 2000 28533
9 191 275 11.25 2000 19310
9 211 295 11.25 2000 27338
9.5 190 280 11.25 2000 17206
9.5 210 300 11.25 2000 24314
10 190 285 11.18 2000 15581
10 209 305 11.25 2000 21815
10.5 190 290 11.11 2000 14217
10.5 209 310 11.25 2000 19725
11 190 295 11.05 2000 13060
11 208 315 11.25 2000 17958
11.5 190 300 11.00 2200 12431
11.5 208 320 11.25 2200 16956
12 190 305 10.95 2200 11527
12 207 325 11.25 2200 15583
12 227 345 11.25 2200 21276
13 195 320 10.87 2200 10949
13 211 340 11.25 2200 14461
13 231 360 11.25 2200 19572
14 195 335 11.20 2200 9973
14 214 355 11.25 2200 13606
14 234 375 11.25 2200 18262
15 195 350 11.48 2400 9376
15 218 370 11.25 2400 13212
15 238 390 11.25 2400 17606
16 200 365 11.38 2400 9192
16 222 385 11.25 2400 12660
16 242 405 11.25 2400 16744
17 200 375 11.29 2400 8402
17 221 395 11.25 2400 11388
17 241 415 11.25 2400 15026
18 200 390 11.52 2800 8175
18 224 410 11.25 2800 11441
18 244 430 11.25 2800 15010
20 200 415 11.62 2800 7236
20 227 435 11.25 2800 10258
20 247 455 11.25 2800 13339
22 200 435 11.46 2800 6404
22 224 455 11.25 2800 8805
22 244 475 11.25 2800 11401

© SP Power Systems Ltd Page 47 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
15.12 Table 11 – Pole Sizing for Single Pole Intermediate and Section Poles for 100mm
“Oak” AAAC (Severe Weather Area)

Pole Maximum Wind Span Length (m)


Length 50 60 70 80 90 100 110 120 130
(m) Diameter of Pole 1.5m from Butt (mm)
8.5 265 265 265 265 265 285 285* 2 x 265 2 x 265
9 275 275 275 275 275 295 295* 2 x 275 2 x 275
9.5 280 280 280 280 280 300 300* 2 x 280 2 x 280
10 285 285 285 285 285 305 305* 2 x 285 2 x 285
10.5 290 290 290 290 290 310 310* 2 x 290 2 x 290
11 295 295 295 295 295 315 315* 2 x 295 2 x 295
11.5 300 300 300 300 300 320 320* 2 x 300 2 x 300
12 305 305 305 305 305 325 325* 2 x 305 2 x 305
13 320 320 320 320 320 340 340* 2 x 320 2 x 320
14 335 335 335 335 335 355 355* 2 x 335 2 x 335
15 350 350 350 350 350 350 370* 2 x 350 2 x 350
16 365 365 365 365 365 365 385* 2 x 365 2 x 365
17 375 375 375 375 375 375* 395* 2 x 375 2 x 375
18 390 390 390 390 390 390 410* 2 x 390 2 x 390
20 415 415 415 415 415 415 415* 2 x 415 2 x 415
22 435 435 435 435 435 435 455* 2 x 435 2 x 435
Note: Pole sizes marked * shall have two blocks fitted

Pole Length (m) Foundation Depth (m)


8.5 – 11.0 inc. 2.0
11.5 – 14.0 inc. 2.2
15.0 – 17.0 inc. 2.4
18.0 – 22.0 inc 2.8

© SP Power Systems Ltd Page 48 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16. APPENDIX 3 – 33kV NORMAL WEATHER AREA 150MM AAAC “ASH” CONDUCTOR
(L27)

16.1 Design Parameters

Design Parameters
Conductor Code name ASH
Greased Conductor Weight (kg/m) 0.5071
Cross Sectional Area of Conductor (mm²) 180.7
Conductor Overall Diameter (mm) 17.4
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 5700
Rated Breaking Strength of Conductor (kgf) 5436.1071
Basic / Recommended Span (m) 90
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1532.0
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1087.2214
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1532.0
Maximum Conductor Weight (MCW) (kg/m) 1.240
Maximum Conductor Pressure (MCP) (kg/m) 1.410
Freezing Point Tension (FPT) (kgf) @ 0ºC 971.6
Equipment Weight (kg) 600

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 50ºC

Factors of Safety
Unstayed Poles 3.5
Pole Foundations 2.5
Stayed Poles 2.5
Stays 2.5
Steelwork 2.5
Pin Insulators 2.5

© SP Power Systems Ltd Page 49 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.2 Table 1 – Support Types and Duties Table for 150mm “Ash” AAAC (Normal Weather Area)

Angle of Line SP Energy Networks’


Structure Type Max Span Length (m) Max Gradient
Deviation Drawing Reference
100 1:10 0º
Intermediate Single Pole SP2147473
90 1:5* 0º

Single Pole 110 1:10 0º SP2147476

Straight Section H Pole 110 1:10 0º SP4019003

H Pole (Long Span) 130 1:10 0º SP2147486

Single Pole 100 1:10 45º SP4018548

H Pole 100 1:10 75º SP4019003


Angle Section
H Pole 90 1:10 90º SP4019003

H Pole (Long Span) 120 1:10 15º SP2147486

Terminal H Pole 110 1:10 0º SP2147485


Note: * See Section 12.2.2 for guidance on hillside applications.

© SP Power Systems Ltd Page 50 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

16.3 Table 2 – Conductor Design Table for 150mm² “Ash” AAAC (Normal Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1093.8 0.14 0.21 0.28 0.37 0.47 0.58 0.70 0.83 0.98
0 971.6 0.16 0.23 0.32 0.42 0.53 0.65 0.79 0.94 1.10
5 875.2 0.18 0.26 0.35 0.46 0.59 0.72 0.88 1.04 1.22
10 785.1 0.20 0.29 0.40 0.52 0.65 0.81 0.98 1.16 1.36
15 702.6 0.23 0.32 0.44 0.58 0.73 0.90 1.09 1.30 1.52
20 629.0 0.25 0.36 0.49 0.64 0.82 1.01 1.22 1.45 1.70
25 564.8 0.28 0.40 0.55 0.72 0.91 1.12 1.36 1.62 1.90
30 510.0 0.31 0.45 0.61 0.80 1.01 1.24 1.50 1.79 2.10
35 463.6 0.34 0.49 0.67 0.88 1.11 1.37 1.65 1.97 2.31
40 424.8 0.37 0.54 0.73 0.96 1.21 1.49 1.81 2.15 2.52
45 392.2 0.40 0.58 0.79 1.03 1.31 1.62 1.96 2.33 2.73
50 364.7 0.43 0.63 0.85 1.11 1.41 1.74 2.10 2.50 2.94
55 341.3 0.46 0.67 0.91 1.19 1.50 1.86 2.25 2.67 3.14
60 321.3 0.49 0.71 0.97 1.26 1.60 1.97 2.39 2.84 3.33
65 304.0 0.52 0.75 1.02 1.33 1.69 2.08 2.52 3.00 3.52
70 289.0 0.55 0.79 1.07 1.40 1.78 2.19 2.65 3.16 3.71
75 275.8 0.57 0.83 1.13 1.47 1.86 2.30 2.78 3.31 3.88
80 264.0 0.60 0.86 1.18 1.54 1.94 2.40 2.90 3.46 4.06

© SP Power Systems Ltd Page 51 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.4 Table 3 – Conductor Pre-Tension Table for 150mm “Ash” AAAC (Normal Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
1231 0.13 0.19 0.25 0.33 0.42 0.51 0.62 0.74 0.87

2
16.5 Table 4 – Conductor Erection Table for 150mm “Ash” AAAC (Normal Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1184.5 0.13 0.19 0.26 0.34 0.43 0.54 0.65 0.77 0.90
0 1058.4 0.15 0.22 0.29 0.38 0.49 0.60 0.72 0.86 1.01
5 957.6 0.17 0.24 0.32 0.42 0.54 0.66 0.80 0.95 1.12
10 862.0 0.18 0.26 0.36 0.47 0.60 0.74 0.89 1.06 1.24
15 772.9 0.21 0.30 0.40 0.52 0.66 0.82 0.99 1.18 1.39
20 691.7 0.23 0.33 0.45 0.59 0.74 0.92 1.11 1.32 1.55
25 619.4 0.26 0.37 0.50 0.65 0.83 1.02 1.24 1.47 1.73
30 556.5 0.28 0.41 0.56 0.73 0.92 1.14 1.38 1.64 1.92
35 502.9 0.32 0.45 0.62 0.81 1.02 1.26 1.53 1.82 2.13
40 457.7 0.35 0.50 0.68 0.89 1.12 1.38 1.68 1.99 2.34
45 419.8 0.38 0.54 0.74 0.97 1.22 1.51 1.83 2.17 2.55
50 388.0 0.41 0.59 0.80 1.05 1.32 1.63 1.98 2.35 2.76
55 361.1 0.44 0.63 0.86 1.12 1.42 1.76 2.12 2.53 2.97
60 338.3 0.47 0.67 0.92 1.20 1.52 1.87 2.27 2.70 3.17
65 318.7 0.50 0.72 0.97 1.27 1.61 1.99 2.41 2.86 3.36
70 301.8 0.53 0.76 1.03 1.34 1.70 2.10 2.54 3.02 3.55
75 287.0 0.55 0.80 1.08 1.41 1.79 2.21 2.67 3.18 3.73
80 274.0 0.58 0.83 1.13 1.48 1.87 2.31 2.80 3.33 3.91

© SP Power Systems Ltd Page 52 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.6 Table 5 – Maximum Angle of Deviation for Single Poles for 150mm “Ash” AAAC
(Normal Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
1 x 7/4.00mm 2 x 7/4.00mm
30° 18° 31°
35° 22° 40°
40° 26° 45°
45° 29° 45°

2
16.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 150mm “Ash” AAAC (Normal
Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
3 x 7/4.00mm 4 x 7/4.00mm
30° 74° 90°
35° 90° 90°
40° 90° 90°
45° 90° 90°

2
16.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 150mm “Ash”
AAAC (Normal Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 5894 5456 5115 4839
5° 7628 6886 6308 5840
10° 9355 8310 7497 6837
15° 11071 9725 8678 7828
20° 12774 11128 9849 8811
Level Conditions
25° 14459 12518 11008 9784
30° 16124 13891 12154 10745
35° 17765 15244 13283 11693
40° 19380 16576 14395 12625
45° 20965 17883 15485 13540
0° 8180 7743 7402 7126
5° 9915 9172 8595 8127
10° 11641 10596 9783 9124
15° 13358 12011 10964 10115
20° 15060 13415 12135 11097
Downpull 1:10
25° 16745 14805 13295 12070
30° 18410 16177 14441 13032
35° 20052 17531 15570 13979
40° 21667 18862 16681 14912
45° 23252 20170 17772 15827

© SP Power Systems Ltd Page 53 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 150mm “Ash” AAAC
(Normal Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3313 3030 2810 2631
5° 4354 3888 3526 3232
10° 5390 4742 4238 3830
15° 6420 5591 4947 4424
20° 7441 6433 5650 5014
25° 8452 7267 6346 5598
30° 9451 8091 7033 6175
35° 10436 8903 7711 6743
40° 11405 9702 8377 7303
Level Conditions 45° 12356 10486 9032 7852
50° 13288 11254 9673 8390
55° 14198 12005 10299 8915
60° 15085 12736 10909 9427
65° 15947 13447 11502 9925
70° 16782 14136 12077 10407
75° 17590 14802 12633 10874
80° 18368 15443 13168 11323
85° 19115 16059 13682 11754
90° 19830 16649 14174 12167
0° 4457 4173 3953 3774
5° 5497 5031 4669 4375
10° 6533 5886 5382 4973
15° 7563 6735 6090 5568
20° 8584 7577 6793 6157
25° 9595 8411 7489 6741
30° 10594 9234 8176 7318
35° 11579 10046 8854 7887
40° 12548 10845 9521 8446
Downpull 1:10 45° 13499 11629 10175 8995
50° 14431 12398 10816 9533
55° 15341 13148 11442 10058
60° 16228 13879 12052 10570
65° 17090 14590 12646 11068
70° 17926 15279 13221 11551
75° 18733 15945 13776 12017
80° 19511 16587 14312 12466
85° 20258 17203 14826 12898
90° 20973 17792 15317 13310

© SP Power Systems Ltd Page 54 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.10 Table 9 – Strut Load in “H” Pole Structures with Four Stays (kgf) for 150mm “Ash”
AAAC (Normal Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3044 2808 2625 2476
5° 3911 3523 3221 2976
10° 4775 4235 3815 3475
15° 5633 4943 4406 3970
20° 6484 5644 4991 4462
25° 7327 6339 5571 4948
30° 8159 7026 6144 5429
35° 8980 7702 6709 5903
40° 9787 8368 7264 6369
Level Conditions 45° 10580 9022 7810 6826
50° 11356 9662 8344 7274
55° 12115 10287 8865 7712
60°* 12854 10896 9374 8139
65° 13572 11489 9868 8554
70° 14269 12063 10348 8956
75° 14942 12618 10811 9345
80° 15590 13153 11257 9719
85° 16212 13666 11685 10078
90° 16808 14157 12095 10422
0° 4187 3951 3768 3619
5° 5055 4666 4364 4120
10° 5918 5378 4959 4618
15° 6776 6086 5549 5113
20° 7627 6788 6135 5605
25° 8470 7482 6714 6091
30° 9302 8169 7287 6572
35° 10123 8846 7852 7046
40° 10931 9511 8407 7512
Downpull 1:10 45° 11723 10165 8953 7970
50° 12499 10805 9487 8418
55° 13258 11430 10009 8856
60°* 13997 12040 10517 9282
65° 14715 12632 11012 9697
70° 15412 13206 11491 10099
75° 16085 13761 11954 10488
80° 16733 14296 12400 10862
85° 17356 14809 12828 11222
90° 17951 15300 13238 11565
Note: * Denotes value for selection of terminal pole at specified gradient.

2
16.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 150mm “Ash”
AAAC (Normal Weather Area)

LINE ANGLE Structure Back Stay Angle (64°)


Level Conditions Construction Terminal 9625
Downpull 1:10 Construction Terminal 11496

© SP Power Systems Ltd Page 55 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.12 Table 11 – Stayed Pole Strut Capabilities for 150mm “Ash” AAAC (Normal Weather
Area)

Pole Pole Top Dia. Dia. 1.5m Taper Planting Depth Pole Strut Strength
(m) (mm) from Butt (mm/m) (mm) (kgf)
8.5 190 265 10.71 2000 20881
8.5 206 285 11.25 2000 28533
9 191 275 11.25 2000 19310
9 211 295 11.25 2000 27338
9.5 190 280 11.25 2000 17206
9.5 210 300 11.25 2000 24314
10 190 285 11.18 2000 15581
10 209 305 11.25 2000 21815
10 229 325 11.25 2000 29943
10.5 190 290 11.11 2000 14217
10.5 209 310 11.25 2000 19725
10.5 229 330 11.25 2000 27032
11 190 295 11.05 2000 13060
11 208 315 11.25 2000 17958
11 228 335 11.25 2000 24572
11.5 190 300 11.00 2200 12431
11.5 208 320 11.25 2200 16956
11.5 228 340 11.25 2200 23186
12 190 305 10.95 2200 11527
12 207 325 11.25 2200 15583
12 227 345 11.25 2200 21276
13 195 320 10.87 2200 10949
13 211 340 11.25 2200 14461
13 231 360 11.25 2200 19572
14 195 335 11.20 2200 9973
14 214 355 11.25 2200 13606
14 234 375 11.25 2200 18262
15 195 350 11.48 2400 9376
15 218 370 11.25 2400 13212
15 238 390 11.25 2400 17606
16 200 365 11.38 2400 9192
16 222 385 11.25 2400 12660
16 242 405 11.25 2400 16744
17 200 375 11.29 2400 8402
17 221 395 11.25 2400 11388
17 241 415 11.25 2400 15026
18 200 390 11.52 2800 8175
18 224 410 11.25 2800 11441
18 244 430 11.25 2800 15010
20 200 415 11.62 2800 7236
20 227 435 11.25 2800 10258
20 247 455 11.25 2800 13339
22 200 435 11.46 2800 6404
22 224 455 11.25 2800 8805
22 244 475 11.25 2800 11401

© SP Power Systems Ltd Page 56 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
16.13 Table 12 – Pole Sizing for Single Pole Intermediate and Section Poles for 150mm
“Ash” AAAC (Normal Weather Area)

Pole Maximum Wind Span Length (m)


Length 50 60 70 80 90 100 110 120 130
(m) Diameter of Pole 1.5m from Butt (mm)
8.5 265 265 265 265 265 285 285* 2 x 265 2 x 265
9 275 275 275 275 275 295 295* 2 x 275 2 x 275
9.5 280 280 280 280 280 300 300* 2 x 280 2 x 280
10 285 285 285 285 285 305 305* 2 x 285 2 x 285
10.5 290 290 290 290 290 310 310* 2 x 290 2 x 290
11 295 295 295 295 295 315 315* 2 x 295 2 x 295
11.5 300 300 300 300 300 320 320* 2 x 300 2 x 300
12 305 305 305 305 305 325 325* 2 x 305 2 x 305
13 320 320 320 320 320 340 340* 2 x 320 2 x 320
14 335 335 335 335 335 355 355* 2 x 335 2 x 335
15 350 350 350 350 350 350 370* 2 x 350 2 x 350
16 365 365 365 365 365 365 385* 2 x 365 2 x 365
17 375 375 375 375 375 375* 395* 2 x 375 2 x 375
18 390 390 390 390 390 390 410* 2 x 390 2 x 390
20 415 415 415 415 415 415 415* 2 x 415 2 x 415
22 435 435 435 435 435 435 455* 2 x 435 2 x 435
Note: Pole sizes marked * shall have two blocks fitted

Pole Length (m) Foundation Depth (m)


8.5 – 11.0 inc. 2.0
11.5 – 14.0 inc. 2.2
15.0 – 17.0 inc. 2.4
18.0 – 22.0 inc 2.8

© SP Power Systems Ltd Page 57 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17. APPENDIX 4 – 33kV NORMAL WEATHER AREA 200MM AAAC “POPLAR”
CONDUCTOR (L33)

17.1 Design Parameters

Design Parameters
Conductor Code name Poplar
Greased Conductor Weight (kg/m) 0.6812
Cross Sectional Area of Conductor (mm²) 239.4
Conductor Overall Diameter (mm) 20.09
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 5700
Rated Breaking Strength of Conductor (kgf) 7200
Basic / Recommended Span (m) 90
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1897.2
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1368.2
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1897.2
Maximum Conductor Weight (MCW) (kg/m) 1.487
Maximum Conductor Pressure (MCP) (kg/m) 1.515
Freezing Point Tension (FPT) (kgf) @ 0ºC 1276.0

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 65ºC

Factors of Safety
Unstayed Poles 3.5
Pole Foundations 2.5
Stayed Poles 3.0
Stays 3.5
Steelwork 3.0
Pin Insulators 2.5

© SP Power Systems Ltd Page 58 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.2 Table 1 – Support Types and Duties Table for 200mm “Poplar” AAAC (Normal Weather Area)

Angle of Line SP Energy Networks’


Structure Type Max Span Length (m) Max Gradient
Deviation Drawing Reference
100 1:10 0º
Single Pole SP4018552
Intermediate 90 1:5* 0º

H Pole (Long Span) 130 1:10 0º SP4019155

Single Pole 110 1:10 0º SP4018548

H Pole 110 1:10 0º SP4019003


Straight Section
H Pole (Long Span) 130 1:10 0º SP2147486

H Pole (Delta) 100 1:5 0º SP2059611

Single Pole 110 1:10 30º SP4018548

Angle Section H Pole 100 1:10 60º SP4019003

H Pole (Long Span) 130 1:10 10º SP2147486

Terminal H Pole 110 1:5 0º SP2147485


Note: * See Section 12.2.2 for guidance on hillside applications.

© SP Power Systems Ltd Page 59 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

17.3 Table 2 – Conductor Design Table for 200mm² “Poplar” AAAC (Normal Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1436.6 0.15 0.21 0.29 0.38 0.48 0.59 0.72 0.85 1.00
0 1276.0 0.17 0.24 0.33 0.43 0.54 0.67 0.81 0.96 1.13
5 1149.5 0.19 0.27 0.36 0.47 0.60 0.74 0.90 1.07 1.25
10 1031.6 0.21 0.30 0.40 0.53 0.67 0.83 1.00 1.19 1.39
15 924.1 0.23 0.33 0.45 0.59 0.75 0.92 1.11 1.33 1.56
20 828.4 0.26 0.37 0.50 0.66 0.83 1.03 1.24 1.48 1.74
25 745.0 0.29 0.41 0.56 0.73 0.93 1.14 1.38 1.65 1.93
30 673.8 0.32 0.45 0.62 0.81 1.02 1.26 1.53 1.82 2.14
35 613.7 0.35 0.50 0.68 0.89 1.12 1.39 1.68 2.00 2.34
40 563.1 0.38 0.54 0.74 0.97 1.22 1.51 1.83 2.18 2.56
45 520.7 0.41 0.59 0.80 1.05 1.32 1.64 1.98 2.35 2.76
50 484.8 0.44 0.63 0.86 1.12 1.42 1.76 2.13 2.53 2.97
55 454.2 0.47 0.67 0.92 1.20 1.52 1.87 2.27 2.70 3.17
60 428.0 0.50 0.72 0.97 1.27 1.61 1.99 2.41 2.86 3.36
65 405.3 0.53 0.76 1.03 1.34 1.70 2.10 2.54 3.02 3.55
70 385.5 0.55 0.80 1.08 1.41 1.79 2.21 2.67 3.18 3.73
75 368.1 0.58 0.83 1.13 1.48 1.87 2.31 2.80 3.33 3.91
80 352.6 0.60 0.87 1.18 1.55 1.96 2.41 2.92 3.48 4.08

© SP Power Systems Ltd Page 60 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.4 Table 3 – Conductor Pre-Tension Table for 200mm “Poplar” AAAC (Normal Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
1619 kgf 0.13 0.19 0.26 0.34 0.43 0.53 0.64 0.76 0.89

2
17.5 Table 4 – Conductor Erection Table for 200mm “Poplar” AAAC (Normal Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1557.0 0.14 0.20 0.27 0.35 0.44 0.55 0.66 0.79 0.92
0 1390.9 0.15 0.22 0.30 0.39 0.50 0.61 0.74 0.88 1.03
5 1258.5 0.17 0.24 0.33 0.43 0.55 0.68 0.82 0.97 1.14
10 1133.1 0.19 0.27 0.37 0.48 0.61 0.75 0.91 1.08 1.27
15 1016.5 0.21 0.30 0.41 0.54 0.68 0.84 1.01 1.21 1.42
20 910.5 0.23 0.34 0.46 0.60 0.76 0.94 1.13 1.35 1.58
25 816.5 0.26 0.38 0.51 0.67 0.84 1.04 1.26 1.50 1.76
30 734.8 0.29 0.42 0.57 0.74 0.94 1.16 1.40 1.67 1.96
35 665.1 0.32 0.46 0.63 0.82 1.04 1.28 1.55 1.84 2.16
40 606.3 0.35 0.51 0.69 0.90 1.14 1.40 1.70 2.02 2.37
45 557.0 0.38 0.55 0.75 0.98 1.24 1.53 1.85 2.20 2.58
50 515.5 0.41 0.59 0.81 1.06 1.34 1.65 2.00 2.38 2.79
55 480.4 0.44 0.64 0.87 1.13 1.44 1.77 2.14 2.55 3.00
60 450.5 0.47 0.68 0.93 1.21 1.53 1.89 2.29 2.72 3.19
65 424.8 0.50 0.72 0.98 1.28 1.62 2.00 2.43 2.89 3.39
70 402.5 0.53 0.76 1.04 1.35 1.71 2.12 2.56 3.05 3.58
75 383.1 0.56 0.80 1.09 1.42 1.80 2.22 2.69 3.20 3.76
80 365.9 0.58 0.84 1.14 1.49 1.88 2.33 2.82 3.35 3.93

© SP Power Systems Ltd Page 61 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.6 Table 5 – Maximum Angle of Deviation for Single Poles for 200mm “Poplar” AAAC
(Normal Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
1 x 7/4.00mm 2 x 7/4.00mm
30° 8° 22°
35° 11° 27°
40° 13° 30°
45° 15° 30°

2
17.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 200mm “Poplar” AAAC
(Normal Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
3 x 7/4.00mm 4 x 7/4.00mm
30° 38° 53°
35° 45° 60°
40° 52° 60°
45° 59° 60°

2
17.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 200mm “Poplar”
AAAC (Normal Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 5531 4993 4575 4236
5° 8108 7118 6348 5724
10° 10676 9235 8115 7206
15° 13229 11340 9872 8680
Level Conditions
20° 15762 13429 11615 10143
25° 18271 15498 13341 11591
30° 20751 17543 15047 13023
35° 23197 19559 16730 14435
0° 8929 8391 7973 7634
5° 11506 10516 9746 9122
10° 14074 12633 11513 10604
15° 16627 14739 13270 12078
Downpull 1:10
20° 19160 16827 15013 13541
25° 21669 18896 16739 14989
30° 24149 20941 18445 16421
35° 26595 22957 20128 17833

© SP Power Systems Ltd Page 62 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 200mm “Poplar” AAAC
(Normal Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3212 2865 2595 2376
5° 4758 4140 3659 3268
10° 6299 5410 4719 4158
15° 7831 6673 5773 5042
20° 9351 7926 6819 5920
25° 10856 9168 7854 6789
Level Conditions 30° 12344 10394 8878 7648
35° 13811 11604 9888 8495
40° 15256 12795 10882 9329
45° 16674 13965 11858 10148
50° 18064 15111 12814 10951
55° 19423 16231 13749 11735
60° 20748 17324 14660 12500
0° 4911 4564 4294 4075
5° 6457 5839 5358 4967
10° 7998 7109 6418 5857
15° 9530 8372 7472 6741
20° 11050 9625 8518 7619
25° 12555 10867 9553 8488
Downpull 1:10 30° 14043 12093 10577 9347
35° 15510 13303 11587 10194
40° 16955 14494 12581 11028
45° 18373 15664 13557 11847
50° 19763 16810 14513 12650
55° 21122 17930 15448 13434
60° 22447 19023 16359 14199

© SP Power Systems Ltd Page 63 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.10 Table 9 – Strut Load in “H” Poles with Four Stays (kgf) for 200mm “Poplar” AAAC
(Normal Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 2882 2593 2368 2185
5° 4171 3655 3254 2929
10° 5455 4714 4138 3670
15° 6731 5766 5016 4407
20° 7998 6811 5888 5139
25° 9252 7845 6751 5863
Level Conditions 30° 10492 8868 7604 6579
35° 11715 9876 8445 7285
40° 12919 10868 9274 7980
45° 14101 11843 10087 8662
50° 15259 12798 10884 9331
55° 16391 13732 11663 9985
60°* 17495 14642 12422 10622
0° 4581 4292 4067 3884
5° 5870 5354 4953 4628
10° 7154 6413 5837 5369
15° 8430 7465 6715 6106
20° 9697 8510 7587 6838
25° 10951 9544 8450 7562
Downpull 1:10 30° 12191 10567 9303 8278
35° 13414 11575 10144 8984
40° 14618 12567 10973 9679
45° 15800 13542 11786 10361
50° 16958 14497 12583 11030
55° 18090 15431 13362 11684
60°* 19194 16341 14121 12321
Note: * Denotes value for selection of terminal pole at specified gradient.

2
17.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 200mm
“Poplar” AAAC (Normal Weather Area)

LINE ANGLE Structure Back Stay Angle (64°)


Level Conditions Construction Terminal 11559 kgf
Downpull 1:10 Construction Terminal 14957 kgf

© SP Power Systems Ltd Page 64 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.12 Table 11 – Stayed Pole Strut Capabilities for 200mm “Poplar” AAAC (Normal Weather
Area)

Pole Pole Top Dia. Dia. 1.5m Taper Planting Depth Pole Strut Strength
(m) (mm) from Butt (mm/m) (mm) (kgf)
8.5 190 265 10.71 2000 20881
8.5 206 285 11.25 2000 28533
8.5 226 305 11.25 2000 39611
9 191 275 11.25 2000 19310
9 211 295 11.25 2000 27338
9 231 315 11.25 2000 37642
9.5 190 280 11.25 2000 17206
9.5 210 300 11.25 2000 24314
9.5 230 320 11.25 2000 33425
10 190 285 11.18 2000 15581
10 209 305 11.25 2000 21815
10 229 325 11.25 2000 29943
10.5 190 290 11.11 2000 14217
10.5 209 310 11.25 2000 19725
10.5 229 330 11.25 2000 27032
11 190 295 11.05 2000 13060
11 208 315 11.25 2000 17958
11 228 335 11.25 2000 24572
11.5 190 300 11.00 2200 12431
11.5 208 320 11.25 2200 16956
11.5 228 340 11.25 2200 23186
12 190 305 10.95 2200 11527
12 207 325 11.25 2200 15583
12 227 345 11.25 2200 21276
13 195 320 10.87 2200 10949
13 211 340 11.25 2200 14461
13 231 360 11.25 2200 19572
14 195 335 11.20 2200 9973
14 214 355 11.25 2200 13606
14 234 375 11.25 2200 18262
15 195 350 11.48 2400 9376
15 218 370 11.25 2400 13212
15 238 390 11.25 2400 17606
16 200 365 11.38 2400 9192
16 222 385 11.25 2400 12660
16 242 405 11.25 2400 16744
17 200 375 11.29 2400 8402
17 221 395 11.25 2400 11388
17 241 415 11.25 2400 15026
18 200 390 11.52 2800 8175
18 224 410 11.25 2800 11441
18 244 430 11.25 2800 15010
20 200 415 11.62 2800 7236
20 227 435 11.25 2800 10258
20 247 455 11.25 2800 13339
22 200 435 11.46 2800 6404
22 224 455 11.25 2800 8805
22 244 475 11.25 2800 11401

© SP Power Systems Ltd Page 65 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
17.13 Table 12 – Pole Sizing for Intermediate and Section Poles for 200mm “Poplar” AAAC (Normal Weather Area)

Pole Maximum Wind Span Length (m)


Length 50 60 70 80 90 100 110 120 130
(m) Diameter of Pole 1.5m from Butt (mm)
8.5 265 265 265 265 285 285 305* 2 x 265 2 x 265
9 275 275 275 275 295 295* 315* 2 x 275 2 x 275
9.5 280 280 280 280 300* 300* 320* 2 x 280 2 x 280
10 285 285 285 285 305* 305* 325* 2 x 285 2 x 285
10.5 290 290 290 290* 310* 310* 330* 2 x 290 2 x 290
11 295 295 295 295* 315* 315* 335* 2 x 295 2 x 295
11.5 300 300 300 300 320 340* 340* 2 x 300 2 x 300
12 305 305 305 305 325 345* 345* 2 x 305 2 x 305
13 320 320 320 320 340* 340* 360* 2 x 320 2 x 320
14 335 335 335 335* 355* 355* 375* 2 x 335 2 x 335
15 350 350 350 350 370 370* 390* 2 x 350 2 x 350
16 365 365 365 365 365* 385* 385* 2 x 365 2 x 365
17 375 375 375 375* 395* 395* 395* 2 x 375 2 x 375
18 390 390 390 390 410* 410* 410* 2 x 390 2 x 390
20 415 415 415 415 415* 435* 435* 2 x 415 2 x 415
22 435 435 435 435 435* 455* 455* 2 x 435 2 x 435
Note: Pole sizes marked * shall have two ENA TS 439103 Type 2 blocks fitted

Pole Length (m) Foundation Depth (m)


8.5 – 11.0 inc. 2.0
11.5 – 14.0 inc. 2.2
15.0 – 17.0 inc. 2.4
18.0 – 22.0 inc 2.8

© SP Power Systems Ltd Page 66 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18. APPENDIX 5 – 33kV SEVERE WEATHER AREA 200MM AAAC “POPLAR”
CONDUCTOR (L33)

18.1 Design Parameters

Design Parameters
Conductor Code name Poplar
Greased Conductor Weight (kg/m) 0.6812
Cross Sectional Area of Conductor (mm²) 239.4
Conductor Overall Diameter (mm) 20.09
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 5700
Rated Breaking Strength of Conductor (kgf) 7200
Basic / Recommended Span (m) 80
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 2200.0
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1440
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1897.2
Maximum Conductor Weight (MCW) (kg/m) 1.487
Maximum Conductor Pressure (MCP) (kg/m) 1.515
Freezing Point Tension (FPT) (kgf) @ 0ºC 1357.4

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 65ºC

Factors of Safety
Unstayed Poles 3.5
Pole Foundations 3.5
Stayed Poles 3.5
Stays 3.5
Steelwork 3.5
Pin Insulators 3.5

© SP Power Systems Ltd Page 67 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.2 Table 1 – Support Types and Duties Table for 200mm “Poplar” AAAC (Severe Weather Area)

Angle of Line SP Energy Networks’


Structure Type Max Span Length (m) Max Gradient
Deviation Drawing Reference
Single Pole 100 1:10 0º SP4018552

Intermediate Single Pole 80 1:5* 0º SP4018552

H Pole (Long Span) 130 1:10 0º SP4019155

Single Pole 100 1:10 0º SP4018548

H Pole 110 1:10 0º SP4019003


Straight Section
H Pole (Long Span) 100 1:10 0º SP2147486

H Pole (Delta) 100 1:5 0º SP2059611

Single Pole 100 1:10 30º SP4018548

Angle Section H Pole 130 1:10 60º SP4019003

H Pole (Long Span) 100 1:10 10º SP2147486

Terminal H Pole 100 1:5 0º SP2147485


Note: * See Section 12.2.2 for guidance on hillside applications.

© SP Power Systems Ltd Page 68 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

18.3 Table 2 – Conductor Design Table for 200mm² “Poplar” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1512.7 0.14 0.20 0.28 0.36 0.46 0.56 0.68 0.81 0.95
0 1344.1 0.16 0.23 0.31 0.41 0.51 0.63 0.77 0.91 1.07
5 1209.2 0.18 0.25 0.35 0.45 0.57 0.70 0.85 1.01 1.19
10 1081.2 0.20 0.28 0.39 0.50 0.64 0.79 0.95 1.13 1.33
15 962.2 0.22 0.32 0.43 0.57 0.72 0.88 1.07 1.27 1.50
20 854.3 0.25 0.36 0.49 0.64 0.81 1.00 1.21 1.44 1.68
25 759.1 0.28 0.40 0.55 0.72 0.91 1.12 1.36 1.62 1.90
30 677.2 0.31 0.45 0.62 0.80 1.02 1.26 1.52 1.81 2.12
35 608.4 0.35 0.50 0.69 0.90 1.13 1.40 1.69 2.02 2.37
40 551.1 0.39 0.56 0.76 0.99 1.25 1.55 1.87 2.22 2.61
45 503.7 0.42 0.61 0.83 1.08 1.37 1.69 2.05 2.43 2.86
50 464.4 0.46 0.66 0.90 1.17 1.49 1.83 2.22 2.64 3.10
55 431.5 0.49 0.71 0.97 1.26 1.60 1.97 2.39 2.84 3.34
60 403.7 0.53 0.76 1.03 1.35 1.71 2.11 2.55 3.04 3.56
65 380.0 0.56 0.81 1.10 1.43 1.82 2.24 2.71 3.23 3.79
70 359.6 0.59 0.85 1.16 1.52 1.92 2.37 2.87 3.41 4.00
75 341.8 0.62 0.90 1.22 1.59 2.02 2.49 3.01 3.59 4.21
80 326.2 0.65 0.94 1.28 1.67 2.11 2.61 3.16 3.76 4.41

© SP Power Systems Ltd Page 69 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.4 Table 3 – Conductor Pre-Tension Table for 200mm “Poplar” AAAC (Severe Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
1695 0.13 0.19 0.26 0.33 0.42 0.52 0.63 0.75 0.88

2
18.5 Table 4 – Conductor Erection Table for 200mm “Poplar” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1630.3 0.13 0.19 0.26 0.33 0.42 0.52 0.63 0.75 0.88
0 1457.9 0.15 0.21 0.29 0.37 0.47 0.58 0.71 0.84 0.99
5 1318.7 0.16 0.23 0.32 0.41 0.52 0.65 0.78 0.93 1.09
10 1184.9 0.18 0.26 0.35 0.46 0.58 0.72 0.87 1.03 1.21
15 1058.4 0.20 0.29 0.39 0.51 0.65 0.80 0.97 1.16 1.36
20 941.3 0.23 0.33 0.44 0.58 0.73 0.90 1.09 1.30 1.53
25 835.7 0.25 0.37 0.50 0.65 0.83 1.02 1.23 1.47 1.72
30 742.9 0.29 0.41 0.56 0.73 0.93 1.15 1.39 1.65 1.94
35 663.5 0.32 0.46 0.63 0.82 1.04 1.28 1.55 1.85 2.17
40 596.9 0.36 0.51 0.70 0.91 1.16 1.43 1.73 2.05 2.41
45 541.7 0.39 0.57 0.77 1.01 1.27 1.57 1.90 2.26 2.66
50 495.9 0.43 0.62 0.84 1.10 1.39 1.72 2.08 2.47 2.90
55 457.8 0.46 0.67 0.91 1.19 1.51 1.86 2.25 2.68 3.14
60 426.0 0.50 0.72 0.98 1.28 1.62 2.00 2.42 2.88 3.38
65 399.0 0.53 0.77 1.05 1.37 1.73 2.13 2.58 3.07 3.61
70 376.0 0.57 0.82 1.11 1.45 1.83 2.26 2.74 3.26 3.83
75 356.1 0.60 0.86 1.17 1.53 1.94 2.39 2.89 3.44 4.04
80 338.8 0.63 0.90 1.23 1.61 2.04 2.51 3.04 3.62 4.25

© SP Power Systems Ltd Page 70 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.6 Table 5 – Maximum Angle of Deviation for Single Poles for 200mm “Poplar” AAAC
(Severe Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
1 x 7/4.00mm 2 x 7/4.00mm
30° 9° 26°
35° 11° 30°
40° 14° 30°
45° 16° 30°

2
18.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 200mm “Poplar” AAAC
(Severe Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
3 x 7/4.00mm 4 x 7/4.00mm
30° 44° 60°
35° 54° 60°
40° 60° 60°
45° 60° 60°

2
18.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 200mm “Poplar”
AAAC (Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 6683 5923 5332 4853
5° 9172 7976 7045 6291
10° 11650 10019 8750 7721
Level Conditions 15° 14111 12048 10444 9142
20° 16551 14060 12122 10551
25° 18965 16051 13783 11944
30° 21348 18016 15423 13321
0° 9966 9207 8616 8137
5° 12456 11260 10329 9574
10° 14934 13303 12034 11005
Downpull 1:10 15° 17395 15332 13727 12426
20° 19835 17344 15406 13834
25° 22249 19334 17067 15228
30° 24632 21299 18707 16604

© SP Power Systems Ltd Page 71 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 200mm “Poplar” AAAC
(Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3949 3463 3084 2778
5° 5443 4694 4112 3640
10° 6930 5920 5135 4498
15° 8406 7138 6151 5351
20° 9870 8345 7158 6196
25° 11319 9539 8155 7032
Level Conditions 30° 12749 10718 9139 7858
35° 14158 11880 10109 8671
40° 15543 13022 11062 9471
45° 16902 14143 11997 10256
50° 18232 15240 12912 11024
55° 19531 16310 13806 11774
60° 20795 17353 14676 12504
0° 5591 5105 4726 4419
5° 7085 6336 5754 5282
10° 8571 7562 6777 6140
15° 10048 8780 7793 6993
20° 11512 9987 8800 7838
25° 12960 11181 9797 8674
Downpull 1:10 30° 14390 12360 10781 9500
35° 15800 13522 11750 10313
40° 17185 14664 12704 11113
45° 18544 15785 13639 11898
50° 19874 16882 14554 12666
55° 21173 17952 15447 13415
60° 22437 18995 16317 14146

© SP Power Systems Ltd Page 72 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.10 Table 9 – Strut Load in “H” Poles with Four Stays (kgf) for 200mm “Poplar” AAAC
(Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3487 3082 2767 2511
5° 4732 4108 3623 3230
10° 5971 5130 4475 3945
15° 7201 6144 5322 4655
20° 8421 7150 6162 5360
25° 9628 8146 6992 6056
Level Conditions 30° 10820 9128 7812 6744
35° 11994 10096 8620 7422
40° 13149 11048 9414 8089
45° 14281 11982 10194 8743
50° 15390 12896 10956 9383
55° 16472 13788 11701 10008
60°* 17526 14657 12426 10616
0° 5129 4724 4408 4153
5° 6374 5750 5265 4871
10° 7613 6772 6117 5587
15° 8843 7786 6964 6297
20° 10063 8792 7803 7001
25° 11270 9787 8634 7698
Downpull 1:10 30° 12462 10770 9454 8386
35° 13636 11738 10262 9064
40° 14791 12690 11056 9731
45° 15923 13624 11835 10385
50° 17031 14538 12598 11025
55° 18114 15430 13343 11649
60°* 19168 16299 14068 12258
Note: * Denotes value for selection of terminal pole at specified gradient.

2
18.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 200mm
“Poplar” AAAC (Severe Weather Area)

LINE ANGLE Structure Back Stay Angle (64°)


Level Conditions Construction Terminal 11479
Downpull 1:10 Construction Terminal 14763

© SP Power Systems Ltd Page 73 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.12 Table 11 – Stayed Pole Strut Capabilities for 200mm “Poplar” AAAC (Severe Weather
Area)

Pole Pole Top Dia. Dia. 1.5m Taper Planting Depth Pole Strut Strength
(m) (mm) from Butt (mm/m) (mm) (kgf)
8.5 190 265 10.71 2200 21937
8.5 206 285 11.25 2200 29985
8.5 226 305 11.25 2200 41670
9 190 275 11.33 2200 20034
9 211 295 11.25 2200 28609
9 231 315 11.25 2200 39431
9.5 190 280 11.25 2200 17917
9.5 210 300 11.25 2200 25347
9.5 230 320 11.25 2200 34878
10 189 285 11.25 2200 16052
10 209 305 11.25 2200 22666
10 229 325 11.25 2200 31140
10.5 190 290 11.11 2200 14715
10.5 209 310 11.25 2200 20434
10.5 234 335 11.25 2200 30221
11 190 295 11.05 2200 13483
11 213 320 11.25 2200 20120
11 233 340 11.25 2200 27389
11.5 190 300 11.00 2400 12817
11.5 208 320 11.25 2400 17494
11.5 238 350 11.25 2400 27769
12 190 305 10.95 2400 11860
12 212 330 11.25 2400 17385
12 237 355 11.25 2400 25408
13 195 320 10.87 2400 11227
13 211 340 11.25 2400 14836
13 241 370 11.25 2400 23197
14 195 335 11.20 2400 10192
14 214 355 11.25 2400 13919
14 234 375 11.25 2400 18696
15 195 350 11.48 2800 9755
15 218 370 11.25 2800 13780
15 238 390 11.25 2800 18392
16 200 365 11.38 2800 9528
16 222 385 11.25 2800 13149
16 242 405 11.25 2800 17417
17 200 375 11.29 2800 8676
17 221 395 11.25 2800 11782
17 241 415 11.25 2800 15567
18 200 390 11.52 3000 8298
18 224 410 11.25 3000 11625
18 244 430 11.25 3000 15262
20 200 415 11.62 3000 7323
20 227 435 11.25 3000 10394
20 247 455 11.25 3000 13525
22 200 435 11.46 3000 6468
22 224 455 11.25 3000 8902
22 244 475 11.25 3000 11533

© SP Power Systems Ltd Page 74 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
18.13 Table 12 – Pole Sizing for Single Pole Intermediate and Section Poles for 200mm “Poplar” AAAC (Severe Weather Area)

Pole Maximum Wind Span Length (m)


Length 50 60 70 80 90 100 110 120 130
(m) Diameter of Pole 1.5m from Butt (mm)
8.5 265 265 285 285* 305* 305* 2 x 265 2 x 265 2 x 265
9 275 275 295 295* 315* 315* 2 x 275 2 x 275 2 x 275
9.5 280 280 300 300* 320* 320* 2 x 280 2 x 280 2 x 280
10 285 285 305 305* 325* 325* 2 x 285 2 x 285 2 x 285
10.5 290 290 310 310* 330* 330* 2 x 290 2 x 290 2 x 290
11 295 295 315 315* 335* 335* 2 x 295 2 x 295 2 x 295
11.5 300 300 320 320* 340* 340* 2 x 300 2 x 300 2 x 300
12 305 305 325 325* 345* 345* 2 x 305 2 x 305 2 x 305
13 320 320 340 340* 360* 360* 2 x 320 2 x 320 2 x 320
14 335 335 355 355* 375* 375* 2 x 335 2 x 335 2 x 335
15 350 350 370 370* 390* 390* 2 x 350 2 x 350 2 x 350
16 365 365 385 385* 405* 405* 2 x 365 2 x 365 2 x 365
17 375 375 395 395* 415* 415* 2 x 375 2 x 375 2 x 375
18 390 390 410 410* 430* 430* 2 x 390 2 x 390 2 x 390
20 415 415 435 435* 455* 455* 2 x 415 2 x 415 2 x 415
22 435 435 455 455* 475* 475* 2 x 435 2 x 435 2 x 435
Note: Pole sizes marked * shall have two blocks fitted

Pole Length (m) Foundation Depth (m)


8.5 – 11.0 inc. 2.2
11.5 – 14.0 inc. 2.4
15.0 – 17.0 inc. 2.8
18.0 – 22.0 inc 3.0

© SP Power Systems Ltd Page 75 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19. APPENDIX 6 – 33kV SEVERE WEATHER AREA 300MM AAAC “UPAS” CONDUCTOR
(L35)

19.1 Design Parameters

Design Parameters
Conductor Code name Upas
Greased Conductor Weight (kg/m) 1.031
Cross Sectional Area of Conductor (mm²) 342.54
Conductor Overall Diameter (mm) 24.71
Coefficient of Linear Expansion (/Degree C) 2.30E-05
Modulus of Elasticity (kg/mm²) 5810
Rated Breaking Strength of Conductor (kgf) 10348.1
Basic / Recommended Span (m) 80
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 2350.0
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 2069.6
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 2350.0
Maximum Conductor Weight (MCW) (kg/m) 1.963
Maximum Conductor Pressure (MCP) (kg/m) 1.694
Freezing Point Tension (FPT) (kgf) @ 0ºC 1653.8

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 65ºC

Factors of Safety
Unstayed Poles 3.5
Pole Foundations 3.5
Stayed Poles 3.5
Stays 3.5
Steelwork 3.5
Pin Insulators 3.5

© SP Power Systems Ltd Page 76 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.2 Table 1 – Support Types and Duties Table for 300mm “Upas” AAAC (Severe Weather Area)

Angle of Line SP Energy Networks’


Structure Type Max Span Length (m) Max Gradient
Deviation Drawing Reference
100 1:10 0º
Intermediate Single Pole SP4018552
80 1:5* 0º

Single Pole 100 1:10 0º SP4018548

Straight Section H Pole (Delta Long Span) 130 1:10 0º SP2059372

H Pole (Delta) 80 1:5 0º SP2059611

Single Pole 100 1:10 22º SP4018548

Angle Section H Pole 100 1:10 60º SP4019003

H Pole (Delta Long Span) 110 1:10 10º SP2059372

Terminal H Pole 100 1:5 0º SP2147485


Note: * See Section 12.2.2 for guidance on hillside applications.

© SP Power Systems Ltd Page 77 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

19.3 Table 2 – Conductor Design Table for 300mm² “Upas” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 1866.0 0.17 0.25 0.34 0.44 0.56 0.69 0.84 0.99 1.17
0 1653.9 0.19 0.28 0.38 0.50 0.63 0.78 0.94 1.12 1.32
5 1477.2 0.22 0.31 0.43 0.56 0.71 0.87 1.06 1.26 1.47
10 1315.7 0.24 0.35 0.48 0.63 0.79 0.98 1.19 1.41 1.66
15 1171.8 0.27 0.40 0.54 0.70 0.89 1.10 1.33 1.58 1.86
20 1046.9 0.31 0.44 0.60 0.79 1.00 1.23 1.49 1.77 2.08
25 940.7 0.34 0.49 0.67 0.88 1.11 1.37 1.66 1.97 2.32
30 851.8 0.38 0.54 0.74 0.97 1.23 1.51 1.83 2.18 2.56
35 777.9 0.41 0.60 0.81 1.06 1.34 1.66 2.00 2.39 2.80
40 716.3 0.45 0.65 0.88 1.15 1.46 1.80 2.18 2.59 3.04
45 664.7 0.48 0.70 0.95 1.24 1.57 1.94 2.35 2.79 3.28
50 621.1 0.52 0.75 1.02 1.33 1.68 2.07 2.51 2.99 3.51
55 584.0 0.55 0.79 1.08 1.41 1.79 2.21 2.67 3.18 3.73
60 552.1 0.58 0.84 1.14 1.49 1.89 2.33 2.82 3.36 3.95
65 524.3 0.61 0.88 1.20 1.57 1.99 2.46 2.97 3.54 4.15
70 500.0 0.64 0.93 1.26 1.65 2.09 2.58 3.12 3.71 4.36
75 478.5 0.67 0.97 1.32 1.72 2.18 2.69 3.26 3.88 4.55
80 459.3 0.70 1.01 1.37 1.80 2.27 2.81 3.39 4.04 4.74

© SP Power Systems Ltd Page 78 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.4 Table 3 – Conductor Pre-Tension Table for 300mm “Upas” AAAC (Severe Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
1950 0.17 0.24 0.32 0.42 0.54 0.66 0.80 0.95 1.12

2
19.5 Table 4 – Conductor Erection Table for 300mm “Upas” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120 130
-6 2029.4 0.16 0.23 0.31 0.40 0.51 0.63 0.76 0.91 1.06
0 1808.6 0.18 0.26 0.35 0.46 0.58 0.71 0.86 1.03 1.20
5 1621.7 0.20 0.29 0.39 0.51 0.64 0.79 0.96 1.14 1.34
10 1447.6 0.22 0.32 0.44 0.57 0.72 0.89 1.08 1.28 1.50
15 1289.0 0.25 0.36 0.49 0.64 0.81 1.00 1.21 1.44 1.69
20 1148.4 0.28 0.40 0.55 0.72 0.91 1.12 1.36 1.62 1.90
25 1026.8 0.31 0.45 0.61 0.80 1.02 1.25 1.52 1.81 2.12
30 923.8 0.35 0.50 0.68 0.89 1.13 1.39 1.69 2.01 2.36
35 837.8 0.38 0.55 0.75 0.98 1.25 1.54 1.86 2.21 2.60
40 766.2 0.42 0.61 0.82 1.08 1.36 1.68 2.03 2.42 2.84
45 706.5 0.46 0.66 0.89 1.17 1.48 1.82 2.21 2.63 3.08
50 656.5 0.49 0.71 0.96 1.26 1.59 1.96 2.38 2.83 3.32
55 614.2 0.52 0.76 1.03 1.34 1.70 2.10 2.54 3.02 3.55
60 578.0 0.56 0.80 1.09 1.43 1.81 2.23 2.70 3.21 3.77
65 546.9 0.59 0.85 1.15 1.51 1.91 2.36 2.85 3.39 3.98
70 519.8 0.62 0.89 1.21 1.59 2.01 2.48 3.00 3.57 4.19
75 496.0 0.65 0.94 1.27 1.66 2.10 2.60 3.14 3.74 4.39
80 475.0 0.68 0.98 1.33 1.74 2.20 2.71 3.28 3.91 4.59

© SP Power Systems Ltd Page 79 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.6 Table 5 – Maximum Angle of Deviation for Single Poles for 300mm “Upas” AAAC
(Severe Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
1 x 7/4.00mm 2 x 7/4.00mm
30° 7° 11°
35° 8° 14°
40° 10° 18°
45° 12° 22°

2
19.7 Table 6 – Maximum Angle of Deviation for “H” Poles for 300mm “Upas” AAAC (Severe
Weather Area)

Grade 1150 Stay Wire


Angle of Stay Slope
3 x 7/4.00mm 4 x 7/4.00mm
30° 30° 38°
35° 36° 48°
40° 41° 58°
45° 45° 60°

2
19.8 Table 7 – Strut Load in Single Poles with One or Two Stays (kgf) for 300mm “Upas”
AAAC (Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 7360 6670 6133 5698
5° 11085 9741 8696 7848
10° 14797 12802 11250 9991
Level Conditions
15° 18488 15845 13790 12122
20° 22151 18866 16310 14238
22° 23607 20067 17312 15078
0° 12270 11580 11044 10608
5° 15996 14652 13607 12759
10° 19707 17712 16161 14902
Downpull 1:10
15° 23398 20756 18700 17033
20° 27062 23776 21221 19148
22° 28518 24977 22223 19989

© SP Power Systems Ltd Page 80 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.9 Table 8 – Strut Load in “H” Poles with Three Stays (kgf) for 300mm “Upas” AAAC
(Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3948 3538 3219 2960
5° 6184 5381 4757 4251
10° 8411 7218 6290 5537
15° 10627 9045 7814 6816
20° 12826 10858 9327 8086
Level Conditions
25° 15005 12655 10827 9344
30° 17159 14431 12309 10587
35° 19285 16184 13771 11815
40° 21378 17909 15211 13023
45° 23434 19605 16626 14210
0° 6404 5993 5674 5415
5° 8639 7837 7212 6706
10° 10867 9673 8745 7992
15° 13082 11500 10269 9271
20° 15281 13313 11783 10541
Downpull 1:10
25° 17460 15110 13282 11799
30° 19614 16886 14764 13043
35° 21740 18639 16227 14270
40° 23833 20365 17667 15478
45° 25889 22060 19082 16665

© SP Power Systems Ltd Page 81 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.10 Table 9 – Strut Load in “H” Pole Structures with Four Stays (kgf) for 300mm “Upas”
AAAC (Severe Weather Area)

Stay Angle
LINE ANGLE 30° 35° 40° 45°
Strut Load (kgf)
0° 3559 3217 2951 2735
5° 5421 4753 4233 3811
10° 7278 6283 5510 4882
15° 9124 7806 6780 5948
20° 10957 9317 8041 7006
25° 12772 10814 9291 8055
Level Conditions 30° 14568 12294 10526 9091
35° 16339 13755 11745 10114
40° 18083 15193 12945 11121
45° 19797 16606 14124 12110
50° 21476 17991 15279 13080
55° 23119 19345 16410 14028
60°* 24722 20666 17512 14954
0° 6014 5672 5406 5190
5° 7877 7208 6688 6266
10° 9733 8739 7965 7338
15° 11579 10261 9235 8404
20° 13412 11772 10496 9462
25° 15228 13269 11746 10510
Downpull 1:10 30° 17023 14749 12981 11546
35° 18794 16210 14200 12569
40° 20538 17648 15400 13576
45° 22252 19061 16579 14565
50° 23932 20446 17735 15535
55° 25574 21800 18865 16484
60°* 27177 23122 19967 17409
Note: * Denotes value for selection of terminal pole at specified gradient.

2
19.11 Table 10 – Strut Loading in Single Pole Construction Terminals (kgf) for 300mm
“Upas” AAAC (Severe Weather Area)

LINE ANGLE Structure Back Stay Angle (64°)


Level Conditions Construction Terminal 10411
Downpull 1:10 Construction Terminal 15321

© SP Power Systems Ltd Page 82 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.12 Table 11 – Stayed Pole Strut Capabilities for 300mm “Upas” AAAC (Severe Weather
Area)

Pole Pole Top Dia. Dia. 1.5m Taper Planting Depth Pole Strut Strength
(m) (mm) from Butt (mm/m) (mm) (kgf)
8.5 190 265 10.71 2200 21937
8.5 206 285 11.25 2200 29985
8.5 226 305 11.25 2200 41670
9 190 275 11.33 2200 20034
9 211 295 11.25 2200 28609
9 231 315 11.25 2200 39431
9.5 190 280 11.25 2200 17917
9.5 210 300 11.25 2200 25347
9.5 230 320 11.25 2200 34878
10 190 285 11.18 2200 16174
10 209 305 11.25 2200 22666
10 229 325 11.25 2200 31140
10.5 190 290 11.11 2200 14715
10.5 209 310 11.25 2200 20434
10.5 229 330 11.25 2200 28030
11 190 295 11.05 2200 13483
11 208 315 11.25 2200 18555
11 228 335 11.25 2200 25412
11.5 190 300 11.00 2400 12817
11.5 208 320 11.25 2400 17494
11.5 228 340 11.25 2400 23944
12 190 305 10.95 2400 11860
12 207 325 11.25 2400 16042
12 227 345 11.25 2400 21924
13 195 320 10.87 2400 11227
13 211 340 11.25 2400 14836
13 231 360 11.25 2400 20096
14 195 335 11.20 2400 10192
14 214 355 11.25 2400 13919
14 234 375 11.25 2400 18696
15 195 350 11.48 2800 9755
15 218 370 11.25 2800 13780
15 238 390 11.25 2800 18392
16 200 365 11.38 2800 9528
16 222 385 11.25 2800 13149
16 242 405 11.25 2800 17417
17 200 375 11.29 2800 8676
17 221 395 11.25 2800 11782
17 241 415 11.25 2800 15567
18 200 390 11.52 3000 8298
18 224 410 11.25 3000 11625
18 244 430 11.25 3000 15262
20 200 415 11.62 3000 7323
20 227 435 11.25 3000 10394
20 247 455 11.25 3000 13525
22 200 435 11.46 3000 6468
22 224 455 11.25 3000 8902
22 244 475 11.25 3000 11533
Note: The minimum pole top diameter for single poles of angles in excess of 13° shall be 215mm.
The minimum pole top diameter for “H” poles of angles in excess of 31° shall be 225mm.

© SP Power Systems Ltd Page 83 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
19.13 Table 12 – Pole Sizing for Intermediate and Section Poles for 300mm “Upas” AAAC (Severe Weather Area)

Maximum Wind Span Length (m)


Pole Length
50 60 70 80 90 100 115
(m)
Diameter of Pole 1.5m from Butt (mm)
8.5 265 265 265 285* 285* 2 x 265 2 x 265
9 275 275 275 295* 295* 2 x 275 2 x 275
9.5 280 280 280* 300* 300* 2 x 280 2 x 280
10 285 285 285* 305* 325* 2 x 285 2 x 285
10.5 290 290 290* 310* 330* 2 x 290 2 x 290
11 295 295 315* 315* 335* 2 x 295 2 x 295
11.5 300 300 320* 320* 340* 2 x 300 2 x 300
12 305 305 325* 325* 345* 2 x 305 2 x 305
13 320 320 340* 340* 360* 2 x 320 2 x 320
14 335 335* 335* 355* 2 x 335 2 x 335 2 x 335
15 350 350 350 370* 370* 2 x 350 2 x 350
16 365 365 365 365* 385* 2 x 365 2 x 365
17 375 375 375 395* 395* 2 x 375 2 x 375
18 390 390 390 390* 410* 2 x 390 2 x 390
20 415 415 415 415* 435* 2 x 415 2 x 415
22 435 435 435 435* 455* 2 x 435 2 x 435
Note: Pole sizes marked * shall have two blocks fitted

Pole Length (m) Foundation Depth (m)


8.5 – 11.0 inc. 2.2
11.5 – 14.0 inc. 2.4
15.0 – 17.0 inc. 2.8
18.0 – 22.0 inc 3.0

© SP Power Systems Ltd Page 84 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

20. APPENDIX 7 – INSTALLATION REQUIREMENTS FOR CONDUCTORS INCORPORATING


OPTICAL FIBRES

20.1 Introduction

This appendix has been prepared to provide a design for 33kV overhead lines suitable for installation
on SP Energy Networks’ network, utilising optical fibre communication cores embedded within the
phase conductors.

The optical fibres are enclosed within two separate stainless steel tubes in a phase conductor. This
appendix is complementary to the equivalent standard conductor installation requirements, and
should be read in conjunction with it.

This appendix details the specific stringing requirements for:

200mm² AAAC Poplar Equivalent OPPC (L34)

300mm² AAAC Upas Equivalent OPPC (L36)

20.2 General

When compared to a standard overhead line construction, lines incorporating optical fibres shall have
the centre phase conductors substituted with an equivalent OPPC.

All overhead line components and design parameters shall comply with the requirements of the
standard conductor as specified in the relevant appendix with the exception of those specified in the
following sections.

There are specific installation techniques, which require to be employed when installing lines
incorporating optical fibres within the conductors. Supplementary guidance for the erection of OPPC,
to be used in conjunction with conventional conductor installation guidance, is documented in OHL-
18-022.

20.2.1 OPPC

The maximum working tension of an equivalent OPPC is designed to be the same as for a standard
AAAC conductor. However, due to the difference in physical construction of the OPPC when compared
with standard conductor, the maximum sag of the OPPC will be marginally less than standard
conductor, therefore the maximum design sag for the standard conductor should be used when
profiling as indicated in Table 2 of the relevant appendix.

20.2.2 Crossarms, Supports and Stays

As the loadings for the equivalent OPPC are almost identical to the standard conductor, structure
sizing, stay strength and their deployment, and crossarm sizing shall be in accordance with the
corresponding standard conductor appendix.

© SP Power Systems Ltd Page 85 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

20.3 Materials

Except where otherwise specified, all materials used in the construction of lines to this appendix shall
comply with current British Standards, ENA Technical Specifications and international standards
where appropriate. Only Approved materials shall be used.

20.3.1 OPPC

The optical conductors physical and electrical parameters considered by this specification are detailed
in OHL-03-096. Each conductor shall incorporate two stainless steel buffer tubes each containing a
minimum of 12 single mode optical fibres.

20.3.2 Vibration Damper

As for standard 33kV line construction, no vibration dampers are normally required to be employed on
the OPPC.

20.3.3 Suspension Components

33kV polymeric post insulators and armour grip suspension clamps shall be used at all intermediate
insulator positions. The proposed suspension arrangements are not designed to take any uplift load.
Where the structure is deemed to be in uplift, the line should be sectioned and tension support
components employed.

© SP Power Systems Ltd Page 86 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

20.3.4 Upas Equivalent OPPC Tension String Components

From termination strap on the crossarm, the following components are required for termination of the
OPPC:

© SP Power Systems Ltd Page 87 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

20.3.5 Poplar Equivalent OPPC Tension String Components

From termination strap on the crossarm, the following components are required for the OPPC:

© SP Power Systems Ltd Page 88 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

20.4 Optical Splice Enclosures

At OPPC in-line splice and terminal positions, only Approved fibre optic splice enclosures may be
installed. These fittings comprise of a rigid stand-off composite insulator and one or two fibre optic
splice chambers where appropriate.

At terminal positions these will be mounted on two H Pole carryover channels as detailed in SP
Energy Networks’ Drawing Reference SP4008885 and secured using two transformer clamping plates
as detailed in ENA TS Drawing Reference 439529.

At in-line splice positions, on “H” Pole section structures, the unit will be mounted on the centre phase
conductor section strap. On Single pole section structures, the unit will be mounted on the outside of
the angle on the section crossarm. This component shall be substituted for items 11 & 13 of the
general assembly drawings.

They will be located on section and terminal structures as indicated on SP Energy Networks’ Drawing
Reference SP4019865.

In order to prevent damage to the stainless steel buffer tubes containing the optical fibres the line
conductor should be dressed directly from the dead end fitting directly to the splice enclosures and
should be installed in such a manner to ensure the minimum bending radius of the conductor is not
compromised. Only competent persons who have been appointed by SP Energy Networks shall carry
out the splicing of the optical fibres.

20.4.1 Electrical Connections

At terminal positions where a load carrying electrical connection is required, for example, to a cable
termination, these should be connected to the splice enclosure jumper by one or two 3-bolt parallel
groove clamps. (See also general arrangement drawings and associated component listings). Parallel
groove clamps should be used for all electrical connections associated with the OPPC.

It is essential that all conductors are thoroughly cleaned using a suitable wire brush and an Approved
conductive paste should be applied to the conductor prior to the application of the parallel groove
clamps. The clamps should be tightened with a suitable torque wrench to the manufacturer’s
recommended torque. Compression fittings must not be applied to the OPPC conductor. At splice
enclosures, the termination connecting rod should be cleaned using 150-grade abrasive paper and an
Approved conductive paste should be applied to the conductor and connecting rod prior to the
application of the parallel groove clamp(s).

20.5 Earthing

As is normal practise, all metalwork including optical splice enclosures on all structures shall be
bonded and/or earthed in accordance with OHL-25-001.

A connection hole is provided on the base plate of the optical termination unit to which the earth-
bonding lug should be connected.

20.6 Optical Fibre Cable Connections

The fibre optic underground cables shall be secured every 500mm down the pole and protected at the
bottom of the pole by cable guards 3.0m long sunk 150mm into the ground.

© SP Power Systems Ltd Page 89 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

20.7 General Arrangement OPPC Splice Enclosures

© SP Power Systems Ltd Page 90 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

21. APPENDIX 7A – POPLAR EQUIVALENT OPTICAL CONDUCTOR (L34)


2
21.1 200mm AAAC “Poplar” Equivalent OPPC Conductor (Normal Weather Area)
2
21.1.1 Table 1 – 200mm AAAC “Poplar” Equivalent OPPC Conductor (Normal Weather Area)

Design Parameters
Conductor Code name Poplar OPPC
Greased Conductor Weight (kg/m) 0.678
Cross Sectional Area of Conductor (mm²) 226.42
Conductor Overall Diameter (mm) 20.09
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 5700
Rated Breaking Strength of Conductor (kgf) 6808
Basic / Recommended Span (m) 90
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1897.2
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1368.2
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1897.2
Maximum Conductor Weight (MCW) (kg/m) 1.484
Maximum Conductor Pressure (MCP) (kg/m) 1.515
Freezing Point Tension (FPT) (kgf) @ 0ºC 1304.4

© SP Power Systems Ltd Page 91 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

21.1.2 Table 2 – Conductor Design Table for 200mm² “Poplar Equivalent OPPC” AAAC (Normal Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120
-6 1458.9 0.15 0.21 0.28 0.37 0.47 0.58 0.70 0.84
0 1304.4 0.16 0.23 0.32 0.42 0.53 0.65 0.79 0.94
5 1181.7 0.18 0.26 0.35 0.46 0.58 0.72 0.87 1.03
10 1066.1 0.20 0.29 0.39 0.51 0.64 0.79 0.96 1.14
15 959.1 0.22 0.32 0.43 0.57 0.72 0.88 1.07 1.27
20 862.3 0.25 0.35 0.48 0.63 0.80 0.98 1.19 1.42
25 776.6 0.27 0.39 0.53 0.70 0.88 1.09 1.32 1.57
30 702.2 0.30 0.43 0.59 0.77 0.98 1.21 1.46 1.74
35 638.7 0.33 0.48 0.65 0.85 1.07 1.33 1.61 1.91
40 584.8 0.36 0.52 0.71 0.93 1.17 1.45 1.75 2.09
45 539.3 0.39 0.57 0.77 1.01 1.27 1.57 1.90 2.26
50 500.8 0.42 0.61 0.83 1.08 1.37 1.69 2.05 2.44
55 468.1 0.45 0.65 0.89 1.16 1.47 1.81 2.19 2.61
60 440.0 0.48 0.69 0.94 1.23 1.56 1.93 2.33 2.77
65 415.7 0.51 0.73 1.00 1.30 1.65 2.04 2.47 2.94
70 394.6 0.54 0.77 1.05 1.37 1.74 2.15 2.60 3.09
75 376.1 0.56 0.81 1.10 1.44 1.83 2.25 2.73 3.25
80 359.7 0.59 0.85 1.15 1.51 1.91 2.36 2.85 3.39

© SP Power Systems Ltd Page 92 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

21.1.3 Table 3 – Conductor Pre-Tension Table for 200mm² “Poplar Equivalent OPPC” AAAC (Normal Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
1642 0.13 0.19 0.25 0.33 0.42 0.52 0.62 0.74 0.87

21.1.4 Table 4 – Conductor Erection Table for 200mm² “Poplar Equivalent OPPC” AAAC (Normal Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120
-6 1578.8 0.13 0.19 0.26 0.34 0.43 0.54 0.65 0.77
0 1419.7 0.15 0.21 0.29 0.38 0.48 0.60 0.72 0.86
5 1291.9 0.16 0.24 0.32 0.42 0.53 0.66 0.79 0.94
10 1169.9 0.18 0.26 0.35 0.46 0.59 0.72 0.88 1.04
15 1055.0 0.20 0.29 0.39 0.51 0.65 0.80 0.97 1.16
20 949.0 0.22 0.32 0.44 0.57 0.72 0.89 1.08 1.29
25 853.3 0.25 0.36 0.49 0.64 0.80 0.99 1.20 1.43
30 768.7 0.28 0.40 0.54 0.71 0.89 1.10 1.33 1.59
35 695.5 0.30 0.44 0.60 0.78 0.99 1.22 1.47 1.75
40 632.9 0.33 0.48 0.66 0.86 1.08 1.34 1.62 1.93
45 579.9 0.37 0.53 0.72 0.94 1.18 1.46 1.77 2.10
50 535.2 0.40 0.57 0.78 1.01 1.28 1.58 1.92 2.28
55 497.3 0.43 0.61 0.84 1.09 1.38 1.70 2.06 2.45
60 465.1 0.46 0.66 0.89 1.17 1.48 1.82 2.20 2.62
65 437.4 0.48 0.70 0.95 1.24 1.57 1.94 2.34 2.79
70 413.5 0.51 0.74 1.00 1.31 1.66 2.05 2.48 2.95
75 392.7 0.54 0.78 1.06 1.38 1.75 2.16 2.61 3.11
80 374.4 0.57 0.81 1.11 1.45 1.83 2.26 2.74 3.26

© SP Power Systems Ltd Page 93 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
21.2 200mm AAAC “Poplar” Equivalent Optical Conductor (Severe Weather Area) (L34)
2
21.2.1 Table 1 – 200mm AAAC “Poplar” Equivalent OPPC Conductor (Severe Weather Area)

Design Parameters
Conductor Code name Poplar OPPC
Greased Conductor Weight (kg/m) 0.678
Cross Sectional Area of Conductor (mm²) 226.42
Conductor Overall Diameter (mm) 20.09
Coefficient of Linear Expansion (/Degree C) 0.000023
Modulus of Elasticity (kg/mm²) 5700
Rated Breaking Strength of Conductor (kgf) 6808
Basic / Recommended Span (m) 80
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 2200
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1440
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1825.5
Maximum Conductor Weight (MCW) (kg/m) 1.484
Maximum Conductor Pressure (MCP) (kg/m) 1.515
Freezing Point Tension (FPT) (kgf) @ 0ºC 1383.6

© SP Power Systems Ltd Page 94 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

21.2.2 Table 2 – Conductor Design Table for 200mm² “Poplar Equivalent OPPC” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120
-6 1545.3 0.14 0.20 0.27 0.35 0.44 0.55 0.66 0.79
0 1383.6 0.15 0.22 0.30 0.39 0.50 0.61 0.74 0.88
5 1253.3 0.17 0.24 0.33 0.43 0.55 0.68 0.82 0.97
10 1128.4 0.19 0.27 0.37 0.48 0.61 0.75 0.91 1.08
15 1010.6 0.21 0.30 0.41 0.54 0.68 0.84 1.01 1.21
20 901.8 0.23 0.34 0.46 0.60 0.76 0.94 1.14 1.35
25 803.7 0.26 0.38 0.52 0.67 0.85 1.05 1.28 1.52
30 717.6 0.30 0.43 0.58 0.76 0.96 1.18 1.43 1.70
35 643.8 0.33 0.47 0.65 0.84 1.07 1.32 1.59 1.90
40 581.5 0.36 0.52 0.71 0.93 1.18 1.46 1.76 2.10
45 529.5 0.40 0.58 0.78 1.02 1.30 1.60 1.94 2.30
50 486.1 0.44 0.63 0.85 1.12 1.41 1.74 2.11 2.51
55 449.9 0.47 0.68 0.92 1.21 1.53 1.88 2.28 2.71
60 419.4 0.51 0.73 0.99 1.29 1.64 2.02 2.45 2.91
65 393.5 0.54 0.78 1.06 1.38 1.74 2.15 2.61 3.10
70 371.2 0.57 0.82 1.12 1.46 1.85 2.28 2.76 3.29
75 351.9 0.60 0.87 1.18 1.54 1.95 2.41 2.91 3.47
80 335.1 0.63 0.91 1.24 1.62 2.05 2.53 3.06 3.64

© SP Power Systems Ltd Page 95 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

21.2.3 Table 3 – Conductor Pre-Tension Table for 200mm² “Poplar Equivalent OPPC” AAAC (Severe Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
1625 0.13 0.19 0.26 0.33 0.42 0.52 0.63 0.75 0.88

21.2.4 Table 4 – Conductor Erection Table for 200mm² “Poplar Equivalent OPPC” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120
-6 1664.1 0.13 0.18 0.25 0.33 0.41 0.51 0.62 0.73
0 1499.3 0.14 0.20 0.28 0.36 0.46 0.57 0.68 0.81
5 1365.3 0.16 0.22 0.30 0.40 0.50 0.62 0.75 0.89
10 1235.7 0.17 0.25 0.34 0.44 0.56 0.69 0.83 0.99
15 1111.7 0.19 0.27 0.37 0.49 0.62 0.76 0.92 1.10
20 995.0 0.21 0.31 0.42 0.55 0.69 0.85 1.03 1.23
25 887.6 0.24 0.34 0.47 0.61 0.77 0.95 1.16 1.37
30 791.1 0.27 0.39 0.52 0.69 0.87 1.07 1.30 1.54
35 706.7 0.30 0.43 0.59 0.77 0.97 1.20 1.45 1.73
40 634.5 0.33 0.48 0.65 0.85 1.08 1.34 1.62 1.92
45 573.7 0.37 0.53 0.72 0.95 1.20 1.48 1.79 2.13
50 523.0 0.41 0.58 0.79 1.04 1.31 1.62 1.96 2.33
55 480.8 0.44 0.63 0.86 1.13 1.43 1.76 2.13 2.54
60 445.4 0.48 0.69 0.93 1.22 1.54 1.90 2.30 2.74
65 415.6 0.51 0.73 1.00 1.31 1.65 2.04 2.47 2.94
70 390.2 0.54 0.78 1.06 1.39 1.76 2.17 2.63 3.13
75 368.4 0.58 0.83 1.13 1.47 1.86 2.30 2.78 3.31
80 349.5 0.61 0.87 1.19 1.55 1.96 2.43 2.93 3.49

© SP Power Systems Ltd Page 96 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

22. APPENDIX 7B – UPAS EQUIVALENT OPTICAL CONDUCTOR (SEVERE WEATHER


AREA) (L36)
2
22.1 Table 1 – 300mm AAAC “Upas” Equivalent OPPC Conductor (Severe Weather Area)

Design Parameters
Conductor Code name Upas OPPC
Greased Conductor Weight (kg/m) 1.022
Cross Sectional Area of Conductor (mm²) 342.54
Conductor Overall Diameter (mm) 24.71
Coefficient of Linear Expansion (/Degree C) 2.30E-05
Modulus of Elasticity (kg/mm²) 5810
Rated Breaking Strength of Conductor (kgf) 10300.7
Basic / Recommended Span (m) 80
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 2350.0
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 2060.1
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 2350.0
Maximum Conductor Weight (MCW) (kg/m) 1.954
Maximum Conductor Pressure (MCP) (kg/m) 1.694
Freezing Point Tension (FPT) (kgf) @ 0ºC 1653.7

© SP Power Systems Ltd Page 97 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

22.2 Table 2 – Conductor Design Table for 300mm² “Upas Equivalent OPPC” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120
-6 1866.5 0.17 0.25 0.34 0.44 0.55 0.68 0.83 0.99
0 1653.7 0.19 0.28 0.38 0.49 0.63 0.77 0.93 1.11
5 1476.4 0.22 0.31 0.42 0.55 0.70 0.87 1.05 1.25
10 1314.2 0.24 0.35 0.48 0.62 0.79 0.97 1.18 1.40
15 1169.6 0.27 0.39 0.54 0.70 0.88 1.09 1.32 1.57
20 1044.1 0.31 0.44 0.60 0.78 0.99 1.22 1.48 1.76
25 937.4 0.34 0.49 0.67 0.87 1.10 1.36 1.65 1.96
30 848.2 0.38 0.54 0.74 0.96 1.22 1.51 1.82 2.17
35 774.1 0.41 0.59 0.81 1.06 1.34 1.65 2.00 2.38
40 712.4 0.45 0.65 0.88 1.15 1.45 1.79 2.17 2.58
45 660.8 0.48 0.70 0.95 1.24 1.57 1.93 2.34 2.78
50 617.2 0.52 0.75 1.01 1.32 1.68 2.07 2.50 2.98
55 580.2 0.55 0.79 1.08 1.41 1.78 2.20 2.66 3.17
60 548.3 0.58 0.84 1.14 1.49 1.89 2.33 2.82 3.36
65 520.6 0.61 0.88 1.20 1.57 1.99 2.45 2.97 3.53
70 496.4 0.64 0.93 1.26 1.65 2.08 2.57 3.11 3.71
75 475.0 0.67 0.97 1.32 1.72 2.18 2.69 3.25 3.87
80 455.9 0.70 1.01 1.37 1.79 2.27 2.80 3.39 4.03

© SP Power Systems Ltd Page 98 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

2
22.3 Table 3 – Conductor Pre-Tension Table for 300mm “Upas Equivalent OPPC” AAAC (Severe Weather Area)

Pre-tension Sag (m) for Span (m)


at all temperatures
(kgf) 50 60 70 80 90 100 110 120 130
2127 0.15 0.22 0.29 0.38 0.49 0.60 0.73 0.86 1.01

2
22.4 Table 4 – Conductor Erection Table for 300mm “Upas Equivalent OPPC” AAAC (Severe Weather Area)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 50 60 70 80 90 100 110 120
-6 2029.2 0.16 0.23 0.31 0.40 0.51 0.63 0.76 0.91
0 1807.9 0.18 0.25 0.35 0.45 0.57 0.71 0.86 1.02
5 1620.5 0.20 0.28 0.39 0.50 0.64 0.79 0.95 1.14
10 1445.8 0.22 0.32 0.43 0.57 0.72 0.88 1.07 1.27
15 1286.6 0.25 0.36 0.49 0.64 0.80 0.99 1.20 1.43
20 1145.4 0.28 0.40 0.55 0.71 0.90 1.12 1.35 1.61
25 1023.3 0.31 0.45 0.61 0.80 1.01 1.25 1.51 1.80
30 920.0 0.35 0.50 0.68 0.89 1.12 1.39 1.68 2.00
35 833.7 0.38 0.55 0.75 0.98 1.24 1.53 1.85 2.21
40 762.0 0.42 0.60 0.82 1.07 1.36 1.68 2.03 2.41
45 702.3 0.45 0.65 0.89 1.16 1.47 1.82 2.20 2.62
50 652.3 0.49 0.71 0.96 1.25 1.59 1.96 2.37 2.82
55 610.1 0.52 0.75 1.03 1.34 1.70 2.09 2.53 3.02
60 574.0 0.56 0.80 1.09 1.42 1.80 2.23 2.69 3.20
65 543.0 0.59 0.85 1.15 1.51 1.91 2.35 2.85 3.39
70 516.0 0.62 0.89 1.21 1.58 2.01 2.48 3.00 3.57
75 492.3 0.65 0.93 1.27 1.66 2.10 2.59 3.14 3.74
80 471.4 0.68 0.98 1.33 1.73 2.20 2.71 3.28 3.90

© SP Power Systems Ltd Page 99 of 182 Design Manual (SPD, SPM)


Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

23. APPENDIX 8 – INSTALLATION REQUIREMENTS FOR HORSE OPGW

This appendix has been prepared to provide a design for an OPGW conductor to replace the existing
“Hardex” communication network on existing 33kV overhead lines structures.

This appendix details the specific stringing requirements for a 70mm² AACSR Horse Equivalent
OPGW.

23.1 General

Where there is a requirement to modernise the existing “Hardex” communication network, OPGW
may be employed in accordance with the following requirements.

There are specific installation techniques, which require to be employed when installing conductors
incorporating optical fibres. Supplementary guidance for the erection of OPPC, to be used in
conjunction with conventional conductor installation guidance, is documented in OHL-18-022.

23.1.1 OPGW

The maximum working tension of an equivalent OPGW is designed to be the same as for a standard
AACSR conductor. However, due to the difference in physical construction of the OPGW when
compared with standard conductor, the maximum sag of the OPGW will be marginally less than
standard conductor, therefore the maximum design sag for the OPGW conductor may be used when
profiling as indicated in Table 2 of this appendix.

See Section 12.13.1 for guidance on minimum height of conductors.

Note: Land usage may have changed since the original line was profiled and obstacles may have been
erected which could infringe on the basic requirements set out in Section 12.13.1, therefore it is
recommended this is given full consideration.

23.1.2 Supports and Stays

As the loadings for the OPGW are not significantly greater than the “Hardex” communication cable,
there are no requirements to alter existing structures.

23.2 Materials

Except where otherwise specified, all materials used in the construction of lines to this appendix shall
comply with current British Standards, ENA Technical Specifications and international standards
where appropriate. Only Approved materials shall be used.

23.2.1 OPGW

The OPGW considered by this appendix is detailed in OHL-03-096. Each conductor shall incorporate
two stainless steel buffer tubes each containing a minimum of 12 single mode optical fibres.

23.2.2 Vibration Damper

No vibration dampers are normally required to be employed on the OPGW.

23.2.3 Suspension Components

The OPGW shall be supported at all intermediate positions using a standard pole outrigger bracket
(ENA TS Drawing Reference 431403) in conjunction with a galvanised steel suspension link
connected to an Armour Grip Suspension Clamp.

© SP Power Systems Ltd Page 100 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

The pole bolt securing the outrigger bracket should be positioned 225mm above the profiled OPGW
position to allow for the suspension components.

The proposed suspension arrangements are not designed to take any uplift load. Where the structure
is deemed to be in uplift, the line should be sectioned and tension support components employed.

23.2.4 Horse Equivalent Tension String Components

From the BS 3288 Ref 14/88 eyebolt on the structure, the following components are required for
termination of the OPGW:

1. Ball/ Hook (BS Ref. 15/ 32).


2. Socket/ clevis (BS Ref.15/ 84).
3. Single Link (length 400mm)
4. Thimble/clevis (BS Ref. 15/86)
5. Protection Rods
6. Helical dead-end

Items 4 - 7 are generally supplied in a kit.

Item Part name Q'ty Load Rating


1 Protection rods 1 70 kN
2 Dead end 1 70 kN
3 Thimble 1 100 kN
4 400mm Link 1 70 kN

4 3 1

2 Cable

23.2.5 Connection to Splice Enclosures

At OPGW intermediate and terminal splice positions an optical fibre splice enclosure is required to
facilitate the splicing of the optical fibres.

The optical splice enclosure shall be fixed above anti-climber level and secured using two 10mm x
75mm galvanised coach bolts.

At terminal positions the Fibre Optic underground cables shall be secured every 500mm down the
pole and protected at the bottom of the pole by cable guards 3.0m long sunk 150mm into the ground.

© SP Power Systems Ltd Page 101 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

23.3 Conductor Design/Erection Sags and Tensions

Conductor design sags and tensions are given in Tables 2 & 3 of this appendix. The original lines
incorporating “Hardex” communications cables were profiled using a “Wolf” Sag template (normally
50°C) The design sag of the Horse OPGW replacement at an assumed maximum ambient
temperature of 45°C whilst greater than the “Hardex” is equal to or slightly less than the Wolf Profile
used when the line was originally planned and hence the Horse OPGW may be strung as a direct
replacement for the “Hardex” communications’ cable.

The erection tensions given in Table 3 of this appendix are based on the conductor design tension,
but have been subjected to an over tension equivalent to a -13°C temperature shift to allow for
bedding in of the strands and long term creep of the conductor during the life of the line. No pre-
tensioning or other adjustments is necessary during the erection of the line.

23.4 Location of OPGW Attachment Points on Structures.

The attachment positions for OPGW on all structures will be as follows:

23.4.1 Straight Section, Intermediate and Pin Angle Structures

The Outrigger Bracket (ENA TS Drawing Reference 431403) shall be installed:

1365mm below phase conductors for spans up to 107m.


1675mm below phase conductors for spans up to 152m.

23.4.2 Angle Section and Terminal Structures

The Eye Bolt (ENA TS Drawing Reference 439603) shall be installed:

1520mm below phase conductors for spans up to 107m.


1830mm below phase conductors for spans up to 152m

23.5 Bonding and Earthing of OPGW and Components

As is common with all metalwork on structures constructed to this specification, at optical splice
enclosure positions, the splice enclosure will be required to be bonded in accordance with Section
12.16.

The OPGW shall also be bonded to all steelwork on the structure. In addition it shall be earthed at
intervals of approximately 400m in accordance with Section 12.16.

© SP Power Systems Ltd Page 102 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

24. APPENDIX 8A – “HORSE” EQUIVALENT OPGW CONDUCTOR (80M BASIC SPAN)


2
24.1 Table 1 – 70mm AACSR “Horse” Equivalent OPGW Conductor (80m Basic Span)

Design Parameters
Conductor Code name Horse OPGW
Greased Conductor Weight (kg/m) 0.445
Cross Sectional Area of Conductor (mm²) 103.93
Conductor Overall Diameter (mm) 13.95
Coefficient of Linear Expansion (/Degree C) 0.0000177
Modulus of Elasticity (kg/mm²) 9177
Rated Breaking Strength of Conductor (kgf) 5948
Basic / Recommended Span (m) 80
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1217.6
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1189.0
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1217.6
Maximum Conductor Weight (MCW) (kg/m) 1.084
Maximum Conductor Pressure (MCP) (kg/m) 1.277
Freezing Point Tension (FPT) (kgf) @ 0ºC 742.4

Design Temperature
0
Maximum Conductor Temperature for Assessing Ground Clearances 45 C

© SP Power Systems Ltd Page 103 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

24.2 Table 2 – Conductor Design Table for 70mm² “Horse Equivalent OPGW” AACSR (80m Basic Span)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 80 90 100 110 120 130 140 150
-6 812.6 0.44 0.55 0.68 0.83 0.99 1.16 1.34 1.54
0 735.0 0.48 0.61 0.76 0.92 1.09 1.28 1.48 1.70
5 669.6 0.53 0.67 0.83 1.01 1.20 1.40 1.63 1.87
10 608.8 0.58 0.74 0.91 1.11 1.32 1.54 1.79 2.06
15 553.1 0.64 0.81 1.01 1.22 1.45 1.70 1.97 2.26
20 503.1 0.71 0.90 1.11 1.34 1.59 1.87 2.17 2.49
25 458.9 0.78 0.98 1.21 1.47 1.75 2.05 2.38 2.73
30 420.3 0.85 1.07 1.32 1.60 1.91 2.24 2.59 2.98
35 387.1 0.92 1.16 1.44 1.74 2.07 2.43 2.82 3.23
40 358.5 0.99 1.26 1.55 1.88 2.23 2.62 3.04 3.49
45 333.9 1.07 1.35 1.67 2.02 2.40 2.82 3.27 3.75
50 312.7 1.14 1.44 1.78 2.15 2.56 3.01 3.49 4.00
55 294.4 1.21 1.53 1.89 2.29 2.72 3.19 3.70 4.25
60 278.4 1.28 1.62 2.00 2.42 2.88 3.38 3.92 4.49
65 264.5 1.35 1.70 2.10 2.54 3.03 3.55 4.12 4.73
70 252.2 1.41 1.79 2.21 2.67 3.18 3.73 4.32 4.96
75 241.2 1.48 1.87 2.31 2.79 3.32 3.90 4.52 5.19
80 231.4 1.54 1.95 2.40 2.91 3.46 4.06 4.71 5.41

© SP Power Systems Ltd Page 104 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

24.3 Table 3 – Conductor Erection Table for 70mm² “Horse Equivalent OPGW” AACSR (80m Basic Span)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 80 90 100 110 120 130 140 150
-6 1009.3 0.35 0.45 0.55 0.67 0.79 0.93 1.08 1.24
0 925.7 0.38 0.49 0.60 0.73 0.87 1.02 1.18 1.35
5 853.1 0.42 0.53 0.65 0.79 0.94 1.10 1.28 1.47
10 783.1 0.45 0.58 0.71 0.86 1.02 1.20 1.39 1.60
15 716.1 0.50 0.63 0.78 0.94 1.12 1.31 1.52 1.75
20 652.8 0.55 0.69 0.85 1.03 1.23 1.44 1.67 1.92
25 594.1 0.60 0.76 0.94 1.13 1.35 1.58 1.84 2.11
30 540.5 0.66 0.83 1.03 1.25 1.48 1.74 2.02 2.32
35 492.4 0.72 0.92 1.13 1.37 1.63 1.91 2.21 2.54
40 449.9 0.79 1.00 1.24 1.50 1.78 2.09 2.42 2.78
45 412.8 0.86 1.09 1.35 1.63 1.94 2.28 2.64 3.03
50 380.8 0.93 1.18 1.46 1.77 2.10 2.47 2.86 3.29
55 353.3 1.01 1.28 1.57 1.91 2.27 2.66 3.09 3.54
60 329.5 1.08 1.37 1.69 2.04 2.43 2.85 3.31 3.80
65 309.1 1.15 1.46 1.80 2.18 2.59 3.04 3.53 4.05
70 291.3 1.22 1.55 1.91 2.31 2.75 3.23 3.74 4.30
75 275.8 1.29 1.63 2.02 2.44 2.90 3.41 3.95 4.54
80 262.2 1.36 1.72 2.12 2.57 3.06 3.59 4.16 4.77

© SP Power Systems Ltd Page 105 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

25. APPENDIX 8B – “HORSE” EQUIVALENT OPGW CONDUCTOR (100M BASIC SPAN)


2
25.1 Table 1 – 70mm AACSR “Horse” Equivalent OPGW Conductor (100m Basic Span)

Design Parameters
Conductor Code name Horse OPGW
Greased Conductor Weight (kg/m) 0.445
Cross Sectional Area of Conductor (mm²) 103.93
Conductor Overall Diameter (mm) 13.95
Coefficient of Linear Expansion (/Degree C) 0.0000177
Modulus of Elasticity (kg/mm²) 9000
Rated Breaking Strength of Conductor (kgf) 5945.0
Basic / Recommended Span (m) 100
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1253.6
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1189.0
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1253.6
Maximum Conductor Weight (MCW) (kg/m) 1.084
Maximum Conductor Pressure (MCP) (kg/m) 1.277
Freezing Point Tension (FPT) (kgf) @ 0ºC 648.7

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 45ºC

© SP Power Systems Ltd Page 106 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

25.2 Table 2 – Conductor Design Table for 70mm² “Horse Equivalent OPGW” AACSR (100m Basic Span)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 80 90 100 110 120 130 140 150
-6 710.8 0.50 0.63 0.78 0.95 1.13 1.32 1.53 1.76
0 648.7 0.55 0.69 0.86 1.04 1.23 1.45 1.68 1.93
5 598.2 0.60 0.75 0.93 1.13 1.34 1.57 1.82 2.09
10 552.5 0.64 0.82 1.01 1.22 1.45 1.70 1.97 2.27
15 511.7 0.70 0.88 1.09 1.32 1.57 1.84 2.13 2.45
20 475.5 0.75 0.95 1.17 1.42 1.68 1.98 2.29 2.63
25 443.6 0.80 1.02 1.25 1.52 1.81 2.12 2.46 2.82
30 415.6 0.86 1.08 1.34 1.62 1.93 2.26 2.62 3.01
35 390.9 0.91 1.15 1.42 1.72 2.05 2.40 2.79 3.20
40 369.2 0.96 1.22 1.51 1.82 2.17 2.55 2.95 3.39
45 350.1 1.02 1.29 1.59 1.92 2.29 2.69 3.11 3.58
50 333.1 1.07 1.35 1.67 2.02 2.40 2.82 3.27 3.76
55 318.0 1.12 1.42 1.75 2.12 2.52 2.96 3.43 3.94
60 304.5 1.17 1.48 1.83 2.21 2.63 3.09 3.58 4.11
65 292.3 1.22 1.54 1.90 2.30 2.74 3.22 3.73 4.28
70 281.4 1.27 1.60 1.98 2.39 2.85 3.34 3.88 4.45
75 271.4 1.31 1.66 2.05 2.48 2.95 3.46 4.02 4.61
80 262.3 1.36 1.72 2.12 2.57 3.05 3.58 4.16 4.77

© SP Power Systems Ltd Page 107 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

25.3 Table 3 – Conductor Erection Table for 70mm² “Horse Equivalent OPGW” AACSR (100m Basic Span)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 80 90 100 110 120 130 140 150
-6 874.2 0.41 0.52 0.64 0.77 0.92 1.08 1.25 1.43
0 800.9 0.44 0.56 0.69 0.84 1.00 1.17 1.36 1.56
5 739.0 0.48 0.61 0.75 0.91 1.08 1.27 1.48 1.69
10 681.3 0.52 0.66 0.82 0.99 1.18 1.38 1.60 1.84
15 627.9 0.57 0.72 0.89 1.07 1.28 1.50 1.74 1.99
20 579.3 0.61 0.78 0.96 1.16 1.38 1.62 1.88 2.16
25 535.6 0.66 0.84 1.04 1.26 1.50 1.76 2.04 2.34
30 496.7 0.72 0.91 1.12 1.36 1.61 1.89 2.20 2.52
35 462.3 0.77 0.97 1.20 1.46 1.73 2.03 2.36 2.71
40 431.9 0.82 1.04 1.29 1.56 1.85 2.18 2.52 2.90
45 405.3 0.88 1.11 1.37 1.66 1.98 2.32 2.69 3.09
50 381.9 0.93 1.18 1.46 1.76 2.10 2.46 2.85 3.28
55 361.3 0.99 1.25 1.54 1.86 2.22 2.60 3.02 3.46
60 343.0 1.04 1.31 1.62 1.96 2.34 2.74 3.18 3.65
65 326.8 1.09 1.38 1.70 2.06 2.45 2.88 3.34 3.83
70 312.4 1.14 1.44 1.78 2.15 2.56 3.01 3.49 4.01
75 299.5 1.19 1.50 1.86 2.25 2.67 3.14 3.64 4.18
80 287.8 1.24 1.57 1.93 2.34 2.78 3.27 3.79 4.35

© SP Power Systems Ltd Page 108 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

26. APPENDIX 8C – “HORSE” EQUIVALENT OPGW CONDUCTOR (120M BASIC SPAN)


2
26.1 Table 1 – 70mm AACSR “Horse” Equivalent OPGW Conductor (120m Basic Span)

Design Parameters
Conductor Code name Horse OPGW
Greased Conductor Weight (kg/m) 0.445
Cross Sectional Area of Conductor (mm²) 103.93
Conductor Overall Diameter (mm) 13.95
Coefficient of Linear Expansion (/Degree C) 0.0000177
Modulus of Elasticity (kg/mm²) 9000
Rated Breaking Strength of Conductor (kgf) 5945.0
Basic / Recommended Span (m) 120
Wind Pressure on Conductor (N/m²) 380
Radial Ice Thickness (mm) 9.5
Ice Density (kg/m³) 913
Absolute Maximum Working Tension (MWT) Limit (kgf) 1284.7
Temperature at MWT Limit (Degrees C) -5.6
Maximum "Everyday" Tension (EDT) Limit (kgf) 1189.0
Temperature at EDT Limit (Degrees C) 5
Maximum Conductor Tension (MCT) (kgf) @ -5.6ºC 1284.7
Maximum Conductor Weight (MCW) (kg/m) 1.084
Maximum Conductor Pressure (MCP) (kg/m) 1.277
Freezing Point Tension (FPT) (kgf) @ 0ºC 574.7

Design Temperature
Maximum Conductor Temperature for Assessing Ground Clearances 45ºC

© SP Power Systems Ltd Page 109 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

26.2 Table 2 – Conductor Design Table for 70mm² “Horse Equivalent OPGW” AACSR (120m Basic Span)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 80 90 100 110 120 130 140 150
-6 620.0 0.57 0.73 0.90 1.09 1.29 1.52 1.76 2.02
0 574.7 0.62 0.78 0.97 1.17 1.39 1.64 1.90 2.18
5 538.6 0.66 0.84 1.03 1.25 1.49 1.75 2.02 2.32
10 506.3 0.70 0.89 1.10 1.33 1.58 1.86 2.15 2.47
15 477.4 0.75 0.94 1.17 1.41 1.68 1.97 2.28 2.62
20 451.7 0.79 1.00 1.23 1.49 1.77 2.08 2.41 2.77
25 428.8 0.83 1.05 1.30 1.57 1.87 2.19 2.54 2.92
30 408.3 0.87 1.10 1.36 1.65 1.96 2.30 2.67 3.07
35 389.9 0.91 1.16 1.43 1.73 2.05 2.41 2.80 3.21
40 373.3 0.95 1.21 1.49 1.80 2.15 2.52 2.92 3.35
45 358.4 0.99 1.26 1.55 1.88 2.23 2.62 3.04 3.49
50 344.9 1.03 1.31 1.61 1.95 2.32 2.73 3.16 3.63
55 332.5 1.07 1.35 1.67 2.02 2.41 2.83 3.28 3.76
60 321.3 1.11 1.40 1.73 2.09 2.49 2.93 3.39 3.90
65 311.0 1.14 1.45 1.79 2.16 2.58 3.02 3.51 4.02
70 301.5 1.18 1.49 1.84 2.23 2.66 3.12 3.62 4.15
75 292.8 1.22 1.54 1.90 2.30 2.74 3.21 3.72 4.27
80 284.7 1.25 1.58 1.95 2.36 2.81 3.30 3.83 4.40

© SP Power Systems Ltd Page 110 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

26.3 Table 3 – Conductor Erection Table for 70mm² “Horse Equivalent OPGW” AACSR (120m Basic Span)

Temp. Tension Sag (m) for Span (m)


(Deg. C) (kgf) 80 90 100 110 120 130 140 150
-6 745.9 0.48 0.60 0.75 0.90 1.07 1.26 1.46 1.68
0 688.1 0.52 0.65 0.81 0.98 1.16 1.37 1.58 1.82
5 641.1 0.56 0.70 0.87 1.05 1.25 1.47 1.70 1.95
10 598.3 0.60 0.75 0.93 1.12 1.34 1.57 1.82 2.09
15 559.8 0.64 0.80 0.99 1.20 1.43 1.68 1.95 2.24
20 525.2 0.68 0.86 1.06 1.28 1.53 1.79 2.08 2.38
25 494.3 0.72 0.91 1.13 1.36 1.62 1.90 2.21 2.53
30 466.8 0.76 0.97 1.19 1.44 1.72 2.01 2.34 2.68
35 442.2 0.81 1.02 1.26 1.52 1.81 2.13 2.47 2.83
40 420.3 0.85 1.07 1.32 1.60 1.91 2.24 2.59 2.98
45 400.7 0.89 1.12 1.39 1.68 2.00 2.35 2.72 3.12
50 383.0 0.93 1.18 1.45 1.76 2.09 2.45 2.85 3.27
55 367.2 0.97 1.23 1.51 1.83 2.18 2.56 2.97 3.41
60 352.8 1.01 1.28 1.58 1.91 2.27 2.66 3.09 3.55
65 339.8 1.05 1.33 1.64 1.98 2.36 2.77 3.21 3.68
70 327.9 1.09 1.37 1.70 2.05 2.44 2.87 3.32 3.82
75 317.1 1.12 1.42 1.75 2.12 2.53 2.96 3.44 3.95
80 307.1 1.16 1.47 1.81 2.19 2.61 3.06 3.55 4.08

© SP Power Systems Ltd Page 111 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27. DRAWINGS AND COMPONENT LISTINGS

27.1 Figure 1 11kV Single Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP2147483) .......................................................................................................................................... 114
27.2 Figure 2 11kV “H” Pole Member Drilling, Scarfing and Marking (Drawing Reference SP4000590)
.............................................................................................................................................................. 115
27.3 Figure 3 33kV Light Construction Single Pole Member Drilling, Scarfing and Marking (Drawing
Reference SP4009847)........................................................................................................................ 116
27.4 Figure 4 33kV Light Construction “H” Pole Member Drilling, Scarfing and Marking (Drawing
Reference SP4009848)........................................................................................................................ 117
27.5 Figure 5 33kV Heavy Construction Single Pole Member Drilling, Scarfing and Marking (Drawing
Reference SP4009850)........................................................................................................................ 118
27.6 Figure 6 33kV Heavy Construction “H” Pole Member Drilling, Scarfing and Marking (Drawing
Reference SP4009851)........................................................................................................................ 119
27.7 Figure 7 Delta “H” Pole Member Drilling, Scarfing and Marking (Drawing Reference SP4000875)
.............................................................................................................................................................. 120
27.8 Figure 8 Single Pole Intermediate or Pin Angle (Drawing Reference SP2147473) ........................ 121
27.9 Figure 9 Single Pole Intermediate or Pin Angle (Drawing Reference SP4018552) ........................ 123
27.10 Figure 10 “H” Pole Intermediate Long Span (Drawing Reference SP4019155) ............................. 125
27.11 Figure 11 Single Pole Straight Line or Angle Section (Drawing Reference SP2147476) .............. 127
27.12 Figure 12 Single Pole Straight Line or Angle Section (Drawing Reference SP4018548) .............. 129
27.13 Figure 13 “H” Pole Straight Line or Angle Section (Drawing Reference SP4019003)................... 131
27.14 Figure 14 Long Span “H” Pole Straight Line or Angle Section (Drawing Reference SP2147486)133
27.15 Figure 15 Delta “H” Pole Section or Section Angle (Drawing Reference SP2059611) .................. 135
27.16 Figure 16 Delta Long Span “H” Pole Section or Section Angle (Drawing Reference SP2059372)
.............................................................................................................................................................. 137
27.17 Figure 17 Single Pole Terminal (Drawing Reference SP2147474) .................................................. 139
27.18 Figure 18 “H” Pole Terminal (Drawing Reference SP2147485) ....................................................... 141
27.19 Figure 19 Single Pole Double Terminal (Drawing Reference SP4000578) ..................................... 143
27.20 Figure 20 General Arrangement Intermediate Crossarm (Drawing Reference SP4018402) ......... 145
27.21 Figure 21 General Arrangement Section Crossarm (Drawing Reference SP4018433) ................. 146
27.22 Figure 22 General Arrangement Terminal Crossarm (Drawing Reference SP4018401) ............... 147
27.23 Figure 23 General Arrangement Long Span Crossarm (Drawing Reference SP4017663) ............ 148
27.24 Figure 24 General Arrangement Crossarm Strut (Drawing Reference SP4017649) ...................... 149
27.25 Figure 25 General Arrangement Long Crossarm Strut (Drawing Reference SP4017635) ............ 150
27.26 Figure 26 General Arrangement Long Span Delta Crossarm Strut (Drawing Reference
SP2143987) .......................................................................................................................................... 151
27.27 Figure 27 General Arrangement Terminal Strap (Drawing Reference SP4017664) ....................... 152
27.28 Figure 28 General Arrangement Section Strap (Drawing Reference SP4017666) ......................... 153
27.29 Figure 29 General Arrangement Insulator Bracket (Drawing Reference SP4018449) ................... 154
27.30 Figure 30 General Arrangement Insulator Plate (Drawing Reference SP4017637) ....................... 155
27.31 Figure 31 General Arrangement Foundation Brace Steelwork “H” Pole 1830mm Centres (Drawing
Reference SP4017651)........................................................................................................................ 156
27.32 Figure 32 General Arrangement Foundation Brace Steelwork “H” Pole 2500mm Centres (Drawing
Reference SP4017652)........................................................................................................................ 157

© SP Power Systems Ltd Page 112 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.33 Figure 33 General Arrangement Stay and Foundation Blocks (Drawing Reference SP4019020) 158
27.34 Figure 34 General Arrangement Wood Brace Block Type 1 “H” Pole 1830mm Centres (Drawing
Reference SP4019036)........................................................................................................................ 159
27.35 Figure 35 General Arrangement Wood Brace Block Type 2 “H” Pole 2500mm Centres (Drawing
Reference SP4019037)........................................................................................................................ 160
27.36 Figure 36 General Arrangement “H” Pole Carryover Support Steelwork (Drawing Reference
SP4008885) .......................................................................................................................................... 161
27.37 Figure 37 General Arrangement “H” Pole Cable Cleat / Coffin Support Steelwork (Drawing
Reference SP2143955)........................................................................................................................ 162
27.38 Figure 38 General Arrangement “H” Pole Crucifix Support Steelwork (Drawing Reference
SP2143957) .......................................................................................................................................... 163
27.39 Figure 39 General Arrangement Single Pole Fuse Steelwork (Drawing Reference SP2059590) . 164
27.40 Figure 40 General Arrangement Single Pole Fuse Outrigger Steelwork (Drawing Reference
SP2143963) .......................................................................................................................................... 165
27.41 Figure 41 General Arrangement “H” Pole Fuse Steelwork (Drawing Reference SP2143487) ...... 166
27.42 Figure 42 General Arrangement Surge Arrester Support Steelwork (Drawing Reference
SP2143956) .......................................................................................................................................... 167
27.43 Figure 43 General Arrangement Delta “H” Section Strap (Drawing Reference SP2146143) ........ 168
27.44 Figure 44 General Arrangement Terminal Bracing Strap (Drawing Reference SP4015138)......... 169
27.45 Figure 45 General Arrangement Terminal Bracing Strap (Drawing Reference SP4020576)......... 170
27.46 Figure 46 General Arrangement Long Section Strap for Long Span Delta “H” Pole (Drawing
Reference SP4019183)........................................................................................................................ 171
27.47 Figure 47 General Arrangement Heavy Construction Stay Attachment Plates (Drawing Reference
SP4009774) .......................................................................................................................................... 172
27.48 Figure 48 General Arrangement Heavy Construction Stay Attachment (Drawing Reference
SP4009862) .......................................................................................................................................... 173
27.49 Figure 49 General Arrangement Transformer Platform Steelwork for a Single Pole (Drawing
Reference SP4020579)........................................................................................................................ 174
27.50 Figure 50 General Assembly Transformer Platform Steelwork for a Single Pole (Drawing
Reference SP4020581)........................................................................................................................ 175
27.51 Figure 51 General Arrangement Transformer Platform Steelwork for an “H” Pole (Drawing
Reference SP4020578)........................................................................................................................ 176
27.52 Figure 52 General Assembly Transformer Platform Steelwork for an “H” Pole (Drawing Reference
SP4020580) .......................................................................................................................................... 177
27.53 Figure 53 General Arrangement Single Pole Bog Shoe (Drawing Reference SP2146665) ........... 178
27.54 Figure 54 General Arrangement “H” Pole Bog Shoe (Drawing Reference SP2146682)................ 179
27.55 Figure 55 General Arrangement Bog Shoe Strut (Drawing Reference SP2146662) ...................... 180
27.56 Figure 56 General Arrangement 30° Angle Bracket (Drawing Reference SP4018951) ................. 181
27.57 Figure 57 General Arrangement Wind Stay Attachment (Drawing Reference SP4000336) .......... 182

© SP Power Systems Ltd Page 113 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.1 Figure 1 11kV Single Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP2147483)

© SP Power Systems Ltd Page 114 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.2 Figure 2 11kV “H” Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP4000590)

© SP Power Systems Ltd Page 115 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.3 Figure 3 33kV Light Construction Single Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009847)

© SP Power Systems Ltd Page 116 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.4 Figure 4 33kV Light Construction “H” Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009848)

© SP Power Systems Ltd Page 117 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.5 Figure 5 33kV Heavy Construction Single Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009850)

© SP Power Systems Ltd Page 118 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.6 Figure 6 33kV Heavy Construction “H” Pole Member Drilling, Scarfing and Marking
(Drawing Reference SP4009851)

© SP Power Systems Ltd Page 119 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.7 Figure 7 Delta “H” Pole Member Drilling, Scarfing and Marking (Drawing Reference
SP4000875)

© SP Power Systems Ltd Page 120 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.8 Figure 8 Single Pole Intermediate or Pin Angle (Drawing Reference SP2147473)

© SP Power Systems Ltd Page 121 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.8.1 General Assembly Arrangement Single Pole Intermediate or Pin Angle (Drawing Reference SP2147473)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 1 Wood Pole ENA TS 434001 -
02 1 or 2 Pole Block ENA TS 439103 Type 2 SP4019020
03 1 Intermediate Crossarm Member ENA TS 439519 SP4018402
07 2 Crossarm Strut ENA TS 439526 SP4017649
11 3 Insulator ENA TS 43-93 -
12 3 Insulator Pin BS 3288 Fig 4, Ref 29 -
14 3 Helical Ties ENA TS 43-15 -
ENA TS 43-96 Clause 4.2
19 3 or 4 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
21 4 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 1 or 2 M20 Square Curved Washer ENA TS 439605 -
23 3 or 4 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English -
24 1 or 2 -
- Bilingual -
25 As Required Pole Numbers - -
26 1 Insulator Bracket ENA TS 439518 SP4018449
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 122 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.9 Figure 9 Single Pole Intermediate or Pin Angle (Drawing Reference SP4018552)

© SP Power Systems Ltd Page 123 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.9.1 General Assembly Arrangement Single Pole Intermediate or Pin Angle (Drawing Reference SP4018552)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 1 Wood Pole ENA TS 434001 -
02 1 or 2 Pole Block ENA TS 439103 Type 2 SP4019020
03 2 Intermediate Crossarm Member ENA TS 439519 SP4018402
07 4 Crossarm Strut ENA TS 439526 SP4017649
11 3 Insulator ENA TS 43-93 -
12 3 Insulator Pin BS 3288 Fig 4, Ref 29 -
14 3 Helical Ties ENA TS 43-15 -
ENA TS 43-96 Clause 4.2
19 3 or 4 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
21 10 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 1 or 2 M20 Square Curved Washer ENA TS 439605 -
23 1 or 2 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 1 or 2 - -
- Bilingual
25 As Required Pole Numbers - -
26 1 Insulator Bracket ENA TS 439518 SP4018449
27 2 Insulator Plate - SP4017637
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 124 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.10 Figure 10 “H” Pole Intermediate Long Span (Drawing Reference SP4019155)

© SP Power Systems Ltd Page 125 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.10.1 General Assembly Arrangement “H” Pole Intermediate Long Span (Drawing Reference SP4019155)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 2 Wood Pole ENA TS 434001 -
02 2 or 4 Pole Block ENA TS 439103 Type 2 SP4019020
06 2 Long Span Crossarm Member ENA TS 439521 SP4017663
11 3 Insulator ENA TS 43-93 -
12 3 Insulator Pin BS 3288 Fig 4, Ref 29 -
14 3 Helical Ties ENA TS 43-15 -
ENA TS 43-96 Clause 4.2
19 8 or 10 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 4 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 6 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 6 or 8 M20 Square Curved Washer ENA TS 439605 -
23 4 or 6 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 2 or 4 - -
- Bilingual
25 As Required Pole Numbers - -
27 3 Insulator Plate - SP4017637
30 2 Foundation Brace Steelwork 2500mm centres ENA TS 439559 SP4017652
31 1 Foundation Brace Block ENA TS 439112 Type 2 SP4019037
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 126 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.11 Figure 11 Single Pole Straight Line or Angle Section (Drawing Reference SP2147476)

© SP Power Systems Ltd Page 127 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.11.1 General Assembly Arrangement Single Pole Straight Line or Angle Section (Drawing Reference SP2147476)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 1 Wood Pole ENA TS 434001 -
02 1 or 2 Pole Block ENA TS 439103 Type 2 SP4019020
04 2 Section Crossarm Member ENA TS 439520 SP4018433
07 4 Crossarm Strut ENA TS 439526 SP4017649
09 2 Terminal Strap ENA TS 439528 SP4017664
10 2 Section Strap ENA TS 439525 SP4017666
11 2 Pin Insulator ENA TS 43-93 -
13 2 Pilot Pin 50mm Shank BS 3288 Fig 5, Ref 50 -
14 2 Helical Ties ENA TS 43-15 -
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
18 3 Non Tension Joint - -
ENA TS 43-96 Clause 4.2
19 3 or 4 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 2 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 12 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 1 or 2 M20 Square Curved Washer ENA TS 439605 -
23 1 or 2 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 1 or 2 - -
- Bilingual
25 As Required Pole Numbers - -
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 128 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.12 Figure 12 Single Pole Straight Line or Angle Section (Drawing Reference SP4018548)

© SP Power Systems Ltd Page 129 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.12.1 General Assembly Arrangement Single Pole Straight Line or Angle Section (Drawing Reference SP4018548)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 1 Wood Pole ENA TS 434001 -
02 1 or 2 Pole Block ENA TS 439103 Type 2 SP4019020
04 2 Section Crossarm Member ENA TS 439520 SP4018433
08 4 Long Crossarm Strut - SP4017635
09 2 Terminal Strap ENA TS 439528 SP4017664
10 2 Section Strap ENA TS 439525 SP4017666
11 2 Pin Insulator ENA TS 43-93 -
13 2 Pilot Pin 50mm Shank BS 3288 Fig 5, Ref 50 -
14 2 Helical Ties ENA TS 43-15 -
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
18 3 Non Tension Joint - -
ENA TS 43-96 Clause 4.2
19 3 or 4 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 2 or 4 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 12 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 1 or 2 M20 Square Curved Washer ENA TS 439605 -
23 1 or 2 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 1 or 2 - -
- Bilingual
25 As Required Pole Numbers - -
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 130 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.13 Figure 13 “H” Pole Straight Line or Angle Section (Drawing Reference SP4019003)

© SP Power Systems Ltd Page 131 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.13.1 General Assembly Arrangement “H” Pole Straight Line or Angle Section (Drawing Reference SP4019003)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 2 Wood Pole ENA TS 434001 -
02 2 or 4 Pole Block ENA TS 439103 Type 2 SP4019020
04 2 Section Crossarm Member ENA TS 439520 SP4018433
10 3 Section Strap ENA TS 439525 SP4017666
11 2 Pin Insulator ENA TS 43-93 -
13 2 Pilot Pin 50mm Shank BS 3288 Fig 5, Ref 50 -
14 2 Helical Ties ENA TS 43-15 -
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
18 3 Non Tension Joint - -
ENA TS 43-96 Clause 4.2
19 8 or 10 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 4 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 6 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 6 or 8 M20 Square Curved Washer ENA TS 439605 -
23 4 or 6 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 2 or 4 - -
- Bilingual
25 As Required Pole Numbers - -
28 2 Foundation Brace Steelwork 1830mm centres ENA TS 439558 SP4017651
29 1 Foundation Brace Block ENA TS 439112 Type 1 SP4019036
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 132 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.14 Figure 14 Long Span “H” Pole Straight Line or Angle Section (Drawing Reference
SP2147486)

© SP Power Systems Ltd Page 133 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.14.1 General Assembly Long Span “H” Pole Straight Line or Angle Section (Drawing Reference SP2147486)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 2 Wood Pole ENA TS 434001 -
02 2 or 4 Pole Block ENA TS 439103 Type 2 SP4019020
06 2 Long Span Crossarm Member ENA TS 439521 SP4017663
10 3 Section Strap ENA TS 439525 SP4017666
11 2 Pin Insulator ENA TS 43-93 -
13 2 Pilot Pin 50mm Shank BS 3288 Fig 5, Ref 50 -
14 2 Helical Ties ENA TS 43-15 -
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
18 3 Non Tension Joint - -
ENA TS 43-96 Clause 4.2
19 8 or 10 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 4 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 6 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 6 or 8 M20 Square Curved Washer ENA TS 439605 -
23 4 or 6 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 2 or 4 - -
- Bilingual
25 As Required Pole Numbers - -
30 2 Foundation Brace Steelwork 2500mm centres ENA TS 439559 SP4017652
31 1 Foundation Brace Block ENA TS 439112 Type 2 SP4019037
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 134 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.15 Figure 15 Delta “H” Pole Section or Section Angle (Drawing Reference SP2059611)

© SP Power Systems Ltd Page 135 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.15.1 General Assembly Delta “H” Pole Section or Section Angle (Drawing Reference SP2059611)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 2 Wood Pole ENA TS 434001 -
02 2 or 4 Pole Block ENA TS 439103 Type 2 SP4019020
05 2 Terminal Crossarm Member ENA TS 439522 SP4018401
09 2 Terminal Strap ENA TS 439528 SP4017664
11 2 Pin Insulator ENA TS 43-93 -
13 2 Pilot Pin 50mm Shank BS 3288 Fig 5, Ref 50 -
14 3 Helical Ties ENA TS 43-15 -
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
18 3 Non Tension Joint - -
ENA TS 43-96 Clause 4.2
19 10 or 12 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 7 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 12 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 6 or 8 M20 Square Curved Washer ENA TS 439605 -
23 4 or 6 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 2 or 4 - -
- Bilingual
25 As Required Pole Numbers - -
28 2 Foundation Brace Steelwork 1830mm centres ENA TS 439558 SP4017651
29 1 Foundation Brace Block ENA TS 439112 Type 1 SP4019036
32 2 Delta H Section Strap - SP2146143
42 2 30 Degree Angle Bracket - SP4018951
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 136 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.16 Figure 16 Delta Long Span “H” Pole Section or Section Angle (Drawing Reference
SP2059372)

© SP Power Systems Ltd Page 137 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.16.1 General Assembly Delta Long Span “H” Pole Section or Section Angle (Drawing Reference SP2059372)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 2 Wood Pole ENA TS 434001 -
02 2 or 4 Pole Block ENA TS 439103 Type 2 SP4019020
05 2 Terminal Crossarm Member ENA TS 439522 SP4018401
06 2 Long Span Crossarm Member ENA TS 439521 SP4017663
09 2 Terminal Strap ENA TS 439528 SP4017664
11 2 Pin Insulator ENA TS 43-93 -
13 2 Pilot Pin 50mm Shank BS 3288 Fig 5, Ref 50 -
14 2 Helical Ties ENA TS 43-15 -
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
18 3 Non Tension Joint - -
ENA TS 43-96 Clause 4.2
19 8 or 10 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 9 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 8 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 6 or 8 M20 Square Curved Washer ENA TS 439605 -
23 4 or 6 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 2 or 4 - -
- Bilingual
25 As Required Pole Numbers - -
28 2 Foundation Brace Steelwork 1830mm centres ENA TS 439558 SP4017651
29 1 Foundation Brace Block ENA TS 439112 Type 1 SP4019036
32 2 Long Section Strap For Long Span Delta H Pole - SP4019183
41 4 Long Span Delta Crossarm Strut - SP2143987
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 138 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.17 Figure 17 Single Pole Terminal (Drawing Reference SP2147474)

© SP Power Systems Ltd Page 139 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.17.1 General Assembly Single Pole Terminal (Drawing Reference SP2147474)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 1 Wood Pole ENA TS 434001 -
02 1 or 2 Pole Block ENA TS 439103 Type 2 SP4019020
05 2 Terminal Crossarm Member ENA TS 439522 SP4018401
07 4 Crossarm Strut ENA TS 439526 SP4017649
09 3 Terminal Strap ENA TS 439528 SP4017664
15 3 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 3 Tension Insulator ENA TS 43-93 -
17 3 Helical Dead End Assembly ENA TS 43-92 -
ENA TS 43-96 Clause 4.2
19 3 or 4 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 4 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 8 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 1 or 2 M20 Square Curved Washer ENA TS 439605 -
23 1 or 2 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 1 or 2 - -
- Bilingual
25 As Required Pole Numbers - -
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 140 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.18 Figure 18 “H” Pole Terminal (Drawing Reference SP2147485)

© SP Power Systems Ltd Page 141 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.18.1 General Assembly “H” Pole Terminal (Drawing Reference SP2147485)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 2 Wood Pole ENA TS 434001 -
02 2 or 4 Pole Block ENA TS 439103 Type 2 SP4019020
05 2 Terminal Crossarm Member ENA TS 439522 SP4018401
15 3 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 3 Tension Insulator ENA TS 43-93 -
17 3 Helical Dead End Assembly ENA TS 43-92 -
ENA TS 43-96 Clause 4.2
19 8 or 10 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 5 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 6 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 6 or 8 M20 Square Curved Washer ENA TS 439605 -
23 4 or 6 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 2 or 4 - -
- Bilingual
25 As Required Pole Numbers - -
28 2 Foundation Brace Steelwork 1830mm centres ENA TS 439558 SP4017651
29 1 Foundation Brace Block ENA TS 439112 Type 1 SP4019036
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 142 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.19 Figure 19 Single Pole Double Terminal (Drawing Reference SP4000578)

© SP Power Systems Ltd Page 143 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.19.1 General Assembly Single Pole Double Terminal (Drawing Reference SP4000578)

ITEM NUMBER DESCRIPTION ENA TS, BS or OTHER REFERENCE DRAWING NUMBER


01 1 Wood Pole ENA TS 434001 -
02 1 or 2 Pole Block ENA TS 439103 Type 2 SP4019020
05 4 Terminal Crossarm Member ENA TS 439522 SP4018401
07 8 Crossarm Strut ENA TS 439526 SP4017649
09 6 Terminal Strap ENA TS 439528 SP4017664
15 6 Ball End Hook BS 3288 Fig 12 Ref 15/32 -
16 6 Tension Insulator ENA TS 43-93 -
17 6 Helical Dead End Assembly ENA TS 43-92 -
ENA TS 43-96 Clause 4.2
19 5 or 6 M20 Pole Bolt (HYS) and Nut. Length to suit Pole diameter -
(Grade 8.8 HYS)
20 8 M20 Tie Rods ENA TS 439608 Type 2 or 3 -
21 20 M20 x 60mm Assembly Bolt and Nut ENA TS 43-96 Clause 4.2 -
22 1 or 2 M20 Square Curved Washer ENA TS 439605 -
23 1 or 2 M20 Square Flat Washer ENA TS 439604 -
Safety Sign - English
24 1 or 2 - -
- Bilingual
25 As Required Pole Numbers - -
As Required Hardwood Plugs ENA TS 439516 -

© SP Power Systems Ltd Page 144 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.20 Figure 20 General Arrangement Intermediate Crossarm (Drawing Reference


SP4018402)

© SP Power Systems Ltd Page 145 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.21 Figure 21 General Arrangement Section Crossarm (Drawing Reference SP4018433)

© SP Power Systems Ltd Page 146 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.22 Figure 22 General Arrangement Terminal Crossarm (Drawing Reference SP4018401)

© SP Power Systems Ltd Page 147 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.23 Figure 23 General Arrangement Long Span Crossarm (Drawing Reference SP4017663)

© SP Power Systems Ltd Page 148 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.24 Figure 24 General Arrangement Crossarm Strut (Drawing Reference SP4017649)

© SP Power Systems Ltd Page 149 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.25 Figure 25 General Arrangement Long Crossarm Strut (Drawing Reference SP4017635)

© SP Power Systems Ltd Page 150 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.26 Figure 26 General Arrangement Long Span Delta Crossarm Strut (Drawing Reference
SP2143987)

© SP Power Systems Ltd Page 151 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.27 Figure 27 General Arrangement Terminal Strap (Drawing Reference SP4017664)

© SP Power Systems Ltd Page 152 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.28 Figure 28 General Arrangement Section Strap (Drawing Reference SP4017666)

© SP Power Systems Ltd Page 153 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.29 Figure 29 General Arrangement Insulator Bracket (Drawing Reference SP4018449)

© SP Power Systems Ltd Page 154 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.30 Figure 30 General Arrangement Insulator Plate (Drawing Reference SP4017637)

© SP Power Systems Ltd Page 155 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.31 Figure 31 General Arrangement Foundation Brace Steelwork “H” Pole 1830mm Centres
(Drawing Reference SP4017651)

© SP Power Systems Ltd Page 156 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.32 Figure 32 General Arrangement Foundation Brace Steelwork “H” Pole 2500mm Centres
(Drawing Reference SP4017652)

© SP Power Systems Ltd Page 157 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.33 Figure 33 General Arrangement Stay and Foundation Blocks (Drawing Reference
SP4019020)

© SP Power Systems Ltd Page 158 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.34 Figure 34 General Arrangement Wood Brace Block Type 1 “H” Pole 1830mm Centres
(Drawing Reference SP4019036)

© SP Power Systems Ltd Page 159 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.35 Figure 35 General Arrangement Wood Brace Block Type 2 “H” Pole 2500mm Centres
(Drawing Reference SP4019037)

© SP Power Systems Ltd Page 160 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.36 Figure 36 General Arrangement “H” Pole Carryover Support Steelwork (Drawing
Reference SP4008885)

© SP Power Systems Ltd Page 161 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.37 Figure 37 General Arrangement “H” Pole Cable Cleat / Coffin Support Steelwork
(Drawing Reference SP2143955)

© SP Power Systems Ltd Page 162 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.38 Figure 38 General Arrangement “H” Pole Crucifix Support Steelwork (Drawing
Reference SP2143957)

© SP Power Systems Ltd Page 163 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.39 Figure 39 General Arrangement Single Pole Fuse Steelwork (Drawing Reference
SP2059590)

© SP Power Systems Ltd Page 164 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.40 Figure 40 General Arrangement Single Pole Fuse Outrigger Steelwork (Drawing
Reference SP2143963)

© SP Power Systems Ltd Page 165 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.41 Figure 41 General Arrangement “H” Pole Fuse Steelwork (Drawing Reference
SP2143487)

© SP Power Systems Ltd Page 166 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.42 Figure 42 General Arrangement Surge Arrester Support Steelwork (Drawing Reference
SP2143956)

© SP Power Systems Ltd Page 167 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.43 Figure 43 General Arrangement Delta “H” Section Strap (Drawing Reference
SP2146143)

© SP Power Systems Ltd Page 168 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.44 Figure 44 General Arrangement Terminal Bracing Strap (Drawing Reference


SP4015138)

© SP Power Systems Ltd Page 169 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.45 Figure 45 General Arrangement Terminal Bracing Strap (Drawing Reference


SP4020576)

© SP Power Systems Ltd Page 170 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.46 Figure 46 General Arrangement Long Section Strap for Long Span Delta “H” Pole
(Drawing Reference SP4019183)

© SP Power Systems Ltd Page 171 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.47 Figure 47 General Arrangement Heavy Construction Stay Attachment Plates (Drawing
Reference SP4009774)

© SP Power Systems Ltd Page 172 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.48 Figure 48 General Arrangement Heavy Construction Stay Attachment (Drawing


Reference SP4009862)

© SP Power Systems Ltd Page 173 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.49 Figure 49 General Arrangement Transformer Platform Steelwork for a Single Pole
(Drawing Reference SP4020579)

© SP Power Systems Ltd Page 174 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.50 Figure 50 General Assembly Transformer Platform Steelwork for a Single Pole
(Drawing Reference SP4020581)

© SP Power Systems Ltd Page 175 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.51 Figure 51 General Arrangement Transformer Platform Steelwork for an “H” Pole
(Drawing Reference SP4020578)

© SP Power Systems Ltd Page 176 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.52 Figure 52 General Assembly Transformer Platform Steelwork for an “H” Pole (Drawing
Reference SP4020580)

© SP Power Systems Ltd Page 177 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.53 Figure 53 General Arrangement Single Pole Bog Shoe (Drawing Reference SP2146665)

© SP Power Systems Ltd Page 178 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.54 Figure 54 General Arrangement “H” Pole Bog Shoe (Drawing Reference SP2146682)

© SP Power Systems Ltd Page 179 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.55 Figure 55 General Arrangement Bog Shoe Strut (Drawing Reference SP2146662)

© SP Power Systems Ltd Page 180 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.56 Figure 56 General Arrangement 30° Angle Bracket (Drawing Reference SP4018951)

© SP Power Systems Ltd Page 181 of 182 Design Manual (SPD, SPM)
Specification for 11kV and 33kV Overhead Lines OHL-03-099
of Unearthed Construction on Issue 2
Single and “H” Type Wood Poles

27.57 Figure 57 General Arrangement Wind Stay Attachment (Drawing Reference SP4000336)

© SP Power Systems Ltd Page 182 of 182 Design Manual (SPD, SPM)