Description of
S. Unit Labour constant in
work
days.
Excavation over
areas
(hard/dense
soil),depth up to Mate 0.06 E
1) M3
1.5m and
removal (up to
one meter from
edge)
Labour 0.62 M
Excavation in
trenches (soft/
loose soil),for
foundations not
exceeding 1.5m
in width and for
shafts, wells, E
Mate 0.05
2) cesspits and the M3
like, not
exceeding 10m3
and on plan,
depth up to 1.5m
and removal(up
to one meter
away from edge)
Labour 0.5 M
Returning,
filling and
ramming of
excavated earth
in layers not E
Mate 0.02
3) exceeding 20 cm M3
in depth,
watering, well
ramming and
leveling, lead up
to 50m
Labour 0.25 M
Concrete : Labour 0.5 M
Mixing by
machine (mixer)
at banker,
cement concrete Bhisti 0.1
4) (with 20mm M3
graded coarse
aggregate)
M
Mixer
0.07
operator M
Mixer 0.07 E
mason 0.1 M
Labour 1.63 M
bhisti 0.7 E
Mixer mixed
5) M3 mixer
cement concrete 0.07
operator M
mixer 0.07 E
vibrator 0.07 E
Reinforced
cement
concrete in situ
in foundations,
footings, bases
for columns, etc mason 0.17
excluding form
work and
6) M3
reinforcement.
(The constants
for items include
mixing, pouring,
consolidating and
curing. This does
not include fair
finish.)
M
Labour 2 M
mixer
0.07
operator M
mixer 0.07 E
vibrator 0.07 E
Reinforced
mason 0.24
cement
concrete in situ
in suspended
7) M3
floors/roofs
M
excluding form
work, and Labour 2.5 M
bhisti 0.9 E
reinforcement.
mixer
0.07
operator M
work, and
reinforcement.
mixer 0.07 E
vibrator 0.07 E
Mortars: Labour 0.75 M
Mixing by hand,
cement mortar of
any
mix/proportions
8) (Labour required M3 E
Bhisti 0.07
will be
approximately
same for
different mix
proportions.)
Brick work
(straight mason 0.94
M
walls):
Brick work in
walls exceeding
one brick thick,
9) in cement / lime M3
Labour 1.8
mortar (The
constants include
labour involved
in scaffolding.)
M
bhisti 0.2 E
Brick work in
walls, one brick
thick, in
cement/lime
mason 0.25
mortar. (The
10) M2
constants could
be adopted for
brick work with
any mix or
mortar.)
M
Labour 0.4 M
bhisti 0.1 E
Formwork / Carpente
M3 0.25 M
Shuttering: r
a) fabrication
and erection with
all supports,
struts, braces,
M2 Labour 0.2 M
etc, and dressing
with oil as
cleaning of
11)
formwork:
1) rectangular Carpente
M2 0.23 M
column and walls r
2) suspended
Labour 0.2 M
floors/roofs
3) sides and Carpente
0.3 M
soffits of beam r
Labour 0.2 M
Bar
Reinforcement: 1 M
bender
Bar
reinforcement
including cutting
to length, hooked
ends, cranking or
bending, hoisting
12) and placing in Quintal
any position, Labour 1 M
binding wire and
holding firmly so
as not to be
disturbed while
placing and
ramming of
concrete
Plastering and
M2 mason 0.08 M
pointing:
a) 15mm thick
cement plaster to
M2 Labour 0.1 M
ceiling including
mixing of mortar.
b) 15mm thick
cement plaster
on brick walls
M2 bhisti 0.1 E
(exterior)
including mixing
13)
of mortar
c) Tuck pointing
to random rubble
masonry in
mason 0.06 M
cement mortar
including mixing
mortar.
Labour 0.1 M
bhisti 0.1 E
mason 0.1 M
Labour 0.15 M
bhisti 0.1 E
Damping proof
Mason 0.1 M
course:
14) M3
a) Laying damp
proof course
40mm thick
14) cement concrete M3
Labour 0.1 M
including form
work and fair
finishing to edges
and mixing.
bhisti 0.01 E
Pkg 1 80 130 150 160
Pkg 2 30 44 62 160 120
Pkg 3 & 4 30 45 52 80
1 2 3 4 5 6
Labour 0.35
1 28 45.5 52.5 56
2 10.5 15.4 21.7 56 42
3 0 10.5 15.75 18.2 28
Carpenter 0.15
1 12 19.5 22.5 24
2 0 4.5 6.6 9.3 24 18
3 0 0 4.5 6.75 7.8 12
Barbender 0.15
1 12 19.5 22.5 24
2 0 4.5 6.6 9.3 24 18
3 0 0 4.5 6.75 7.8 12
Mason 0.2
1 16 26 30 32 0 0
2 0 6 8.8 12.4 32 24
3 0 0 6 9 10.4 16
Concret pump 1
Compactor 10
Asphalt cutting machine 2
Concrete mixer 10
Vibrator 2
Boom loader 1
Steel bending/cutting machine 8
JCB 1
Water tanker 2
Diesel tanker 2
Air compressor 4
80
28
0
12
0
12
0
0
16
68
1
230
2
150
87