USER TRAINING

MANUAL

PM – Preventive MaintenanceUSER Training


MANUAL
Submitted by: Rana Adeel
USER TRAINING MANUAL
PM – Preventive Maintenance

TABLE OF CONTENTS

MODULE: PERFORMANCE MAINTENANCE - SINGLE CYCLE PLAN ....................... 3

1. Create General Task List – IA05 .................................................................................................................. 3

2. Create Single Cycle Maintenance Plan – IP41 ........................................................................................13

3. Change Maintenance Plan – IP02...............................................................................................................23

4. Schedule Single Cycle Maintenance Plan (Manually) – IP10 ..............................................................27

MODULE: PERFORMANCE BASED – STRATEGY PLAN ..........................................32

1. Create Maintenance Strategy – IP11 .........................................................................................................32

2. Create General Task List using Maintenance Strategy – IA05 ...........................................................39

3. Create Performance Based Strategy Plan – IP42...................................................................................49

4. Deadline Monitoring for Plans (Automatic Scheduling/ Foreground) – IP30 .................................59

5. Background Job for Deadline Monitoring of Plans – IP30 ..................................................................65

6. Display Generated Order List – IW39 ........................................................................................................72

USER TRAINING MANUALPM – Preventive Version 1.0 Page 2 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Module: Performance Maintenance - Single


Cycle Plan
At the conclusion of the exercises, you will be able to:
 Create, change and display the single cycle maintenance plan
 Schedule maintenance plans to generate the maintenance
orders
 Display the generated work order list
 Deactivate maintenance plan

1. Create General Task List – IA05


SCENARIO
Will create a general task list that contains multiple operations with different cycles

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Work Scheduling Task Lists General Maintenance Task Lists IA05 –
Create

1. Double click IA05 – Create

Note:

Will use Copy reference function to create general task list with strategy

Using copy function saving the time for creating new task list

USER TRAINING MANUALPM – Preventive Version 1.0 Page 3 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Information step:

Field Name Field Description


Group Key identifying a task list group.
Profile A profile is a collection of default values and settings for maintenance of
routings or standard networks
Key Date Date on which the task list is edited or displayed. All objects (for example,
header or operation) that are valid on this key date are displayed

3. Exercise step: Update the following fields:

Field Name Values


Group Enter task list group
Profile NOVA

4. Click Enter

USER TRAINING MANUALPM – Preventive Version 1.0 Page 4 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

5. Information step:

Field Name Field Description


Group counter This key and the task list group uniquely identify
Planning plant Planning plant that in charge of planning this task list
Work center Which work center will carry out this tasks
Planner group Key which identifies the planner group responsible for maintaining the task list.
Usage Key specifying the areas in which the task list can be used (for example, in
production or plant maintenance).
Status You use the status key to indicate the processing status of a task list. For example,
you can indicate whether the task list is still in the creation phase or has already
been released.

6. Exercise step: Update the following fields:

Field Name Values


Group counter Type suitable description
description
Planning plant 1000
Work center Enter suitable Work Center
Planner Group Select planner group

7. Click Enter to validate your data.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 5 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

8. Click Continue

9. Click Operation to add the required operations to task list

USER TRAINING MANUALPM – Preventive Version 1.0 Page 6 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

10. Information step:

Field Name Field Description


Operation/Activity Task list operation number
number (OpAC)
Sub operation (Sop) Task list sub operation number
Work center This work center is populated from header
Plant Plant of work center
Control key Key that differentiate between the internal and external operation
Operation description Description of the task list operation
Work Is the man hour
Unit for work (Un) Work unit of measure
Number of capacities Number of persons involved in this operation
required (No)
Duration Duration of operation (work) to be executed.
Normal duration/unit Duration unit of measure
(Un)

USER TRAINING MANUALPM – Preventive Version 1.0 Page 7 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Key for calculation The calculation key, if you select it 1 system will
(Calc) automatically calculate the duration required for this
operation
Activity type (Act Type) The activity type used to determine the operation cost

11. Exercise step: Update the following fields:

Field Name Values


Operation description 1st line item – enter operation text
2nd line item – enter operation text
3rd line item – enter operation text
4th line item – enter operation text
5th line item – enter operation text
Work 1st line item – 3
2nd line item – 1
3rd line item – 1
4th line item – 5
5th line item – 6
Unit for work (Un) 1st line item – H
2nd line item – H
3rd line item – H
4th line item – H
5th line item – H
Number of capacities 1st line item – 1
required (No) 2nd line item – 1
3rd line item – 1
4th line item – 3
5th line item – 4
Normal duration/unit 1st line item – H
(Un) 2nd line item – H
3rd line item – H
4th line item – H
5th line item – H
Key for calculation 1st line item – 2
(Calc) 2nd line item – 2
3rd line item – 2
4th line item – 2
5th line item – 2

USER TRAINING MANUALPM – Preventive Version 1.0 Page 8 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Calculation executed”

12. Click of the 5thline item to selectthe Operation

13. Click component

USER TRAINING MANUALPM – Preventive Version 1.0 Page 9 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

14. Information step:

Field Name Field Description


Material Material number that will be used in the task list operation
Quantity The required quantity of the material in the task list operation

15. Exercise step: Update the following fields:

Field Name Values


Material Select Suitable Material
Quantity 1

Note:

This material will be reserved when this operation is due

USER TRAINING MANUALPM – Preventive Version 1.0 Page 10 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

16. Click Enter

17. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 11 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “General task list xx saved”


18. Write down the general task list group created to be used in next
exercises……………….

19. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 12 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Create Single Cycle Maintenance Plan – IP41


SCENARIO
You will do the following exercise steps if you need to put a maintenance plan for the
same activities that must be executed at regular intervals.

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Maintenance Planning  Maintenance PlansCreateIP41 - Single Cycle Plan

1. Double click IP41 - Single Cycle Plan

2. Information step:

Field Name Field Description


Maintenance plan Number identifying a maintenance plan/ The title or number of Maintenance
Plan.
Maint. plan cat. Maintenance plan category
Indicator that determines which maintenance call object the system
generates for a due maintenance call. In addition, here you can define the
number ranges, the view of the reference object (for example, equipment)
and so on.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 13 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

3. Exercise step: Update the following fields:


Field Name Values

Maint. plan cat. Maintenance Order

4. Click Enter

USER TRAINING MANUALPM – Preventive Version 1.0 Page 14 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

5. Information step:

Field Name Field Description


Maintenance plan Maintenance plan description
Cycle/Unit The maintenance cycle defines the interval after which a task becomes due.
/ Unit is unit of the interval
Offset/Unit The offset of a maintenance package or maintenance cycle determines the
time after which a maintenance package first becomes due.
Counter This key is assigned internally by the system when you create the
measuring point for the equipment assigned to the plan
Maintenance Item A description of the maintenance and inspection tasks required at regular
intervals for maintenance objects.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 15 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Functional loc. Label that uniquely identifies a functional location
Equipment Number by which a piece of equipment can be clearly identified.
Planning plant Maintenance Planning Plant
Order Type Key that differentiates orders according to their purpose/ order type that will
be generated by this plan
Main WorkCtr Key which uniquely identifies the response work center for this technical
object.
Priority The key in this field indicates the importance of the processing of the order
that will be generated by this plan
Maint. Planner Group Planner Group for Customer Service and Plant Maintenance
MaintActivityType Activities are divided into repairs, shutdowns, regular activities, inspections
and so on.
Task LstGrp Key that identify which task list operations that assigned to the plan item

6. Exercise step: Update the following fields:


Field Name Values

Maintenance plan Write the plan description

Cycle/Unit 5000/ KM

Cycle text 5000 KM

Equipment Select Equipment

Order Type PM02

Maint.Activity type Vehicle

Note 1:

Enter the functional location if your intention is only in functional location


preventive maintenance for otherwise leave it blank, if you leave it blank the
functional location will be automaticallypopulated once you have entered an
equipment number in the equipment field.

Note 2:

Maintenance package offset: The offset of a maintenance package or


maintenance cycle determines the time after which a maintenance package first
becomes due

Example:

Cycle length of maintenance package: every 5months and the offset is 7months
this means that the first time due (offset) will be after 7months

USER TRAINING MANUALPM – Preventive Version 1.0 Page 16 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

7. Click Enter to verify your entries

Note: 1

The following fields are automatically populated form the equipment master
data.

Functional location

Maintenance planning plant

Main work center

Maintenance planner group

USER TRAINING MANUALPM – Preventive Version 1.0 Page 17 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Maintenance activity type and order type are default value copied from
customization

8. Click select task list

Note:

Searching criteria as equipment and plant are defaulted from the plan you are
creating

You can put other searching criteria to minimize your searching result

9. Exercise step: Update the following fields:


Field Name Values

Functional location task list Unselect

USER TRAINING MANUALPM – Preventive Version 1.0 Page 18 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Values

Gen. Task List Unselect

10. Click Execute

11. Exercise step: Update the following fields:


Field Name Values

Group/ Group counter Select suitable task list

12. Click Choose

USER TRAINING MANUALPM – Preventive Version 1.0 Page 19 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “A task list was selected”

13. Click Maintenance plan scheduling parameters


tab

14. Information step:

Field Name Field Description


Call horizon The call horizon determines when a maintenance call object, for example, a
maintenance order should be generated for a maintenance call
Scheduling period You can use the scheduling period to determine the length of time for which
the system creates maintenance calls during maintenance plan scheduling
Completion requirement Completion requirement. If you set this indicator, the system only generates
the next call object once the preceding call object has been completed

USER TRAINING MANUALPM – Preventive Version 1.0 Page 20 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Start of cycle Date at which the system should start the maintenance plan

15. Exercise step: Update the following fields:


Field Name Values
Call horizon 95
Scheduling period 5 yr
Start of cycle 0

16. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 21 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Maintenance plan xx created”


17. Write down the maintenance plan number to be used in the next exercises………..

18. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 22 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

3. Change Maintenance Plan – IP02


SCENARIO
Follow the following steps if you need to change the maintenance plan you just created
in the previous step

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Maintenance Planning Maintenance Plans IP02 – Change

1. Double click IP02 – Change

2. Information step:

Field Name Field Description


MaintenancePlan MaintenancePlan number

3. Exercise step: Update the following fields:


Field Name Values
MaintenancePlan Refer to previous exercise # 1

USER TRAINING MANUALPM – Preventive Version 1.0 Page 23 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

4. Click Enter

5. Change description of maintenance plan and maintenance plan item for matching
with the cycle

6. Exercise step: Update the following fields:


Field Name Values
Maintenance plan Write a suitable description
description
Maintenance item Write a suitable description
description

USER TRAINING MANUALPM – Preventive Version 1.0 Page 24 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

7. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 25 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Maintenance plan xx changed”

8. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 26 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

4. Schedule Single Cycle Maintenance Plan (Manually) – IP10


SCENARIO
You have to schedule the maintenance plan to generate and create the planned work
orders once the operations are due

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Maintenance Planning Scheduling for Maintenance Plans IP10 – Schedule

1. Double click IP10 – Schedule

2. Exercise step: Update the following fields:


Field Name Values
MaintenancePlan Refer to exercise # 1

3. Click Enter

USER TRAINING MANUALPM – Preventive Version 1.0 Page 27 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

4. Click Start to schedule the plan

Note:

Start date is copied from the plan scheduling parameters, you can change if
required

5. Click Continue

USER TRAINING MANUALPM – Preventive Version 1.0 Page 28 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

6. Information step:

Field Name Field Description


Call number Continual numbers of the maintenance call.
Plan date The next planned date describes the time at which maintenance task, for
example, a maintenance order is to be executed.
Call date Date on which the system creates a maintenance call object, for example, a
maintenance order or a service entry sheet from the maintenance call
Scheduling type/ status Description of scheduling type and call status
Specifies under which scheduling type the maintenance call is found and the
current status of that call.
The following statuses are possible:
Called
Save to call
Blocked
Confirmed
Skipped
On hold
Completed

USER TRAINING MANUALPM – Preventive Version 1.0 Page 29 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

7. Click Schedule overview list

8. Click Continue

9. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 30 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Maintenance plan xx scheduled”

10. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 31 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Module: Performance Based – Strategy Plan

At the conclusion of the exercises, you will be able to:


 Create measuring point and counter for an equipment
 Create measuring document
 Create performance based maintenance strategy
 Create General task list using strategy
 Create performance based strategy plan
 Schedule performance single strategy plan
 Display generated order list

1. Create Maintenance Strategy – IP11


SCENARIO
A strategy based maintenance plan is used when an item of equipment requires
maintenance at two different levels, for example it requires a visual inspection after a
month and a full overhaul after six months. The strategy based maintenance item allows
the user to create a maintenance plan that contains two maintenance packages
covering each level of maintenance.

You will now create a maintenance strategy.

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Maintenance Planning Maintenance Strategies IP11 - Change

1. Double click IP11 – Change

USER TRAINING MANUALPM – Preventive Version 1.0 Page 32 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Click New Entries

USER TRAINING MANUALPM – Preventive Version 1.0 Page 33 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

3. Information step:

Field Name Field Description


Name The name of the maintenance strategy that you are creating
Description Description of the maintenance strategy that you are creating
Scheduling indicator Used to define the type of scheduling for preventive maintenance plans or
define a cycle set.
The following scheduling indicators are possible:

Strategy unit Unit which determines the basis on which the scheduling calculation should
be made.
Call horizon The call horizon determines when a maintenance call object, for example, a
maintenance order should be generated for a maintenance call

4. Exercise step: Update the following fields:

USER TRAINING MANUALPM – Preventive Version 1.0 Page 34 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Values


Name Write a short name
Description Write a good description
Scheduling indicator Time
Strategy unit MON

5. Double click Packages

USER TRAINING MANUALPM – Preventive Version 1.0 Page 35 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “No entries found that match searching criteria”

6. Click New Entries

USER TRAINING MANUALPM – Preventive Version 1.0 Page 36 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

7. Information step:

Field Name Field Description


Package Maintenance package number
Cycl.length The maintenance cycle defines the interval after which a task becomes due.
Unit Unit which determines the basis on which the scheduling calculation should
be made.
Maintenance Cycle text Text for maintenance package/cycle (time/performance)
Cycle ShortText Short text for the maintenance cycle (time/performance)
Hierarchy The value number of a maintenance package determines its place in the
hierarchy.
You can use the hierarchy to define the priority of maintenance packages
with the same due date.
Note
If several maintenance packages are due at the same time, they must have
the same hierarchy.
If a maintenance package is to replace other maintenance packages when
due, it must have a higher hierarchy.
Examples
If two packages with the same hierarchy are due at the same time, then
both packages are performed.
If the two packages have different hierarchies, only the package with the
higher hierarchy is performed.
Hierarchy Text Short text of the maintenance package hierarchy

8. Exercise step: Update the following fields:


Field Name Values
Package 10
Cycle. length 1
Unit MON
Maintenance cycle text Monthly
Cycle Short Text 1M
Hierarchy 1
HierarchyShort Text L1

Package 20
Cycle. length 3
Unit MON
Maintenance cycle text Three months
Cycle Short Text 3M
Hierarchy 2
HierarchyShort Text L2

Package 30
Cycle. length 6
Unit MON

USER TRAINING MANUALPM – Preventive Version 1.0 Page 37 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Values


Maintenance cycle text 6 Months
Cycle Short Text 6M
Hierarchy 3
HierarchyShort Text L3

9. Click Enter to verify data

10. Click Save

The system displays the message “Data was saved”


11. Write down the maintenance strategy name created to be used in the next
exercises……………

12. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 38 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Create General Task List using Maintenance Strategy –


IA05
SCENARIO
Will create a general task list that contains multiple operations with different cycles

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Work Scheduling Task Lists General Maintenance Task Lists IA05 –
Create

1. Double click IA05 – Create

Note:

Will use Copy reference function to create general task list with strategy

Using copy function saving the time for creating new task list

2. Click Enter

USER TRAINING MANUALPM – Preventive Version 1.0 Page 39 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

3. Information step:

Field Name Field Description


Group counter This key and the task list group uniquely identify
Planning plant Planning plant that in charge of planning this task list
Work center Which work center will carry out this tasks
Planner group Key which identifies the planner group responsible for maintaining the task list.
Usage Key specifying the areas in which the task list can be used (for example, in
production or plant maintenance).
Status You use the status key to indicate the processing status of a task list. For example,
you can indicate whether the task list is still in the creation phase or has already
been released.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 40 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

4. Exercise step: Update the following fields:

Field Name Values


Group counter Type suitable description
description
Planning plant 1000
Work center Enter suitable Work Center
Usage 4
Status 4
Strategy HWB-T

5. Click Enter to validate your data.

6. Click Continue

7. Click Operation to add the required operations to task list

USER TRAINING MANUALPM – Preventive Version 1.0 Page 41 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

8. Information step:

Field Name Field Description


Operation/Activity Task list operation number
number (OpAC)
Sub operation (Sop) Task list sub operation number
Work center This work center is populated from header
Plant Plant of work center
Control key Key that differentiate between the internal and external operation
Operation description Description of the task list operation
Work Is the man hour
Unit for work (Un) Work unit of measure
Number of capacities Number of persons involved in this operation
required (No)
Duration Duration of operation (work) to be executed.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 42 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Normal duration/unit Duration unit of measure
(Un)
Key for calculation The calculation key, if you select it 1 system will
(Calc) automatically calculate the duration required for this
operation
Activity type (Act Type) The activity type used to determine the operation cost

9. Exercise step: Update the following fields:

Field Name Values


Operation description 1st line item – enter operation text
2nd line item – enter operation text
3rd line item – enter operation text
4th line item – enter operation text
5th line item – enter operation text
Work 1st line item – 3
2nd line item – 1
3rd line item – 1
4th line item – 5
5th line item – 6
Unit for work (Un) 1st line item – H
2nd line item – H
3rd line item – H
4th line item – H
5th line item – H
Number of capacities 1st line item – 1
required (No) 2nd line item – 1
3rd line item – 1
4th line item – 3
5th line item – 4
Normal duration/unit 1st line item – H
(Un) 2nd line item – H
3rd line item – H
4th line item – H
5th line item – H
Key for calculation 1st line item – 2
(Calc) 2nd line item – 2
3rd line item – 2
4th line item – 2
5th line item – 2

USER TRAINING MANUALPM – Preventive Version 1.0 Page 43 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Calculation executed”

10. Click of the 6thline item to selectthe Operation

USER TRAINING MANUALPM – Preventive Version 1.0 Page 44 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

11. Click component

12. Information step:

Field Name Field Description


Material Material number that will be used in the task list operation
Quantity The required quantity of the material in the task list operation

13. Exercise step: Update the following fields:

Field Name Values


Material Select Suitable Material

USER TRAINING MANUALPM – Preventive Version 1.0 Page 45 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Values


Quantity 1

Note:

This material will be reserved when this operation is due

14. Click Enter

15. Click Back

16. Clickmaintenance package

USER TRAINING MANUALPM – Preventive Version 1.0 Page 46 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Note:

This screen wouldn’t appear if you did not assign the maintenance strategy in
the task list.

Here you will select which operation is due at which cycle

USER TRAINING MANUALPM – Preventive Version 1.0 Page 47 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

17. Click Save

The system displays the message “General task list xx saved”

18. Write down the general task list group created to be used in next
exercises……………….

19. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 48 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

3. Create Performance Based Strategy Plan – IP42


SCENARIO
A strategy based maintenance plan is used when an item of equipment requires
maintenance at two different levels, for example it requires a visual inspection after a
month and a full overhaul after one thousand working hours. The strategy based
maintenance item allows the user to create a maintenance plan that contains two
maintenance packages covering each level of maintenance.

In this exercise create a strategy based plan for a piece of equipment.

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive
MaintenanceMaintenance Planning Maintenance Plans CreateIP42 -
Strategy Plan

1. Double click IP42 - Strategy Plan

2. Information step:

Field Name Field Description


Maintenance plan Number identifying a maintenance plan/ The title or number of Maintenance
Plan.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 49 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Maint. plan cat. Maintenance plan category
Indicator that determines which maintenance call object the system
generates for a due maintenance call. In addition, here you can define the
number ranges, the view of the reference object (for example, equipment)
and so on.

Strategy A rule for the sequence of planned maintenance and inspection tasks.

3. Exercise step: Update the following fields:


Field Name Values

Maint. plan cat. PM Maintenance Order

Strategy ABD-KM

4. Click Enter

USER TRAINING MANUALPM – Preventive Version 1.0 Page 50 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

5. Information step:
Field Name Field Description
Maintenance plan Maintenance plan description
Counter This key is assigned internally by the system when you create the
measuring point for the equipment assigned to the plan
Cycles The maintenance cycles defines the intervals after which a task becomes
due.
Maintenance Item A description of the maintenance and inspection tasks required at regular
intervals for maintenance objects.
Functional loc. Label that uniquely identifies a functional location
Equipment Number by which a piece of equipment can be clearly identified.
Planning plant Maintenance Planning Plant
Order Type Key that differentiates orders according to their purpose/ order type that will
be generated by this plan

USER TRAINING MANUALPM – Preventive Version 1.0 Page 51 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Main WorkCtr Key which uniquely identifies the response work center for this technical
object.
Priority The key in this field indicates the importance of the processing of the order
that will be generated by this plan
Maint. Planner Group Planner Group for Customer Service and Plant Maintenance
MaintActivityType Activities are divided into repairs, shutdowns, regular activities, inspections
and so on.
Task LstGrp Key that identify which task list operations that assigned to the plan item

6. Exercise step: Update the following fields:


Field Name Values

Maintenance plan Write the plan description

Equipment Refer to equipment

7. Click Enter to verify your entries

USER TRAINING MANUALPM – Preventive Version 1.0 Page 52 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Note: 1

The following fields are automatically populated form the equipment master
data.

Functional location

Maintenance planning plant

Main work center

Maintenance planner group

Maintenance activity type and order type are default value copied from
customization

USER TRAINING MANUALPM – Preventive Version 1.0 Page 53 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

8. Click Select task list

9. Click Execute

USER TRAINING MANUALPM – Preventive Version 1.0 Page 54 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “A task list was selected”

10. Click scroll up

Note:

Cycles included in the selected task list will be shown in the cycles screen

USER TRAINING MANUALPM – Preventive Version 1.0 Page 55 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

11. Click Maintenance plan scheduling parameters


tab

12. Information step:

Field Name Field Description


Call horizon The call horizon determines when a maintenance call object, for example, a
maintenance order should be generated for a maintenance call
Scheduling period You can use the scheduling period to determine the length of time for which
the system creates maintenance calls during maintenance plan scheduling
Completion requirement Completion requirement. If you set this indicator, the system only generates
the next call object once the preceding call object has been completed
StartCounterReading The counter reading which the maintenance schedule should be started.

13. Exercise step: Update the following fields:


Field Name Values
Scheduling period 3Y
StartCounterReading 0

USER TRAINING MANUALPM – Preventive Version 1.0 Page 56 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

14. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 57 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Maintenance plan xx created”


15. Write down the maintenance plan number to be used in the next exercises………..

16. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 58 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

4. Deadline Monitoring for Plans (Automatic Scheduling/


Foreground) – IP30
SCENARIO
Deadline monitoring is a tool that is used to generate maintenance calls for maintenance
plans. Using the scheduling details within the maintenance plans it determines when the
next maintenance call is due and create the call object if required.
Unlike in this exercise the deadline monitoring program will be run automatically on a
regular basis.
In this exercise run the deadline monitoring program manually.

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Maintenance Planning Scheduling for Maintenance Plans IP30 - Deadline
Monitoring

1. Double click IP30 - Deadline Monitoring

USER TRAINING MANUALPM – Preventive Version 1.0 Page 59 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Information step:

Field Name Field Description


Maintenance Plan The number of the maintenance plan that you want to be effected by
deadline monitoring
Interval for Call Objects Use this parameter to control the period of time for which the system
generates maintenance call objects for on-hold calls

Example:

Interval for call objects: 14 days and you run this transaction on: 01.01.XX
then the system generates call objects for the calls waiting up to the
15.01.XX.

USER TRAINING MANUALPM – Preventive Version 1.0 Page 60 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Field Name Field Description


Rescheduling included The indicator is set in the standard system. The system therefore
reschedules the maintenance plan. The system ensures that at least one
on-hold maintenance call is always available. Data such as the cycle
modification factor and call interval, which have changed in the meantime, is
considered during deadline monitoring
Immediate start for all Indicator for the immediate scheduling of the maintenance plan selected
If you want to schedule all the maintenance plans selected straight away,
select this field.
If you first want to choose the maintenance plans that are to be scheduled
from a list, leave this field blank.

3. Exercise step: Update the following fields:


Field Name Values
Maintenance Plan Use the maintenance plan created in the previous exercise # 8

Note:

T-Code IP10 used for scheduling only one maintenance plan

T-Code IP30 used for scheduling multiple maintenance plans because system
allow you to select range of Maintenance Plan,Maintenance Plan cat or
Maintenance strategies to schedule

Another difference between IP10 and IP30 is, in IP30 first order will be actually
generated immediately regardless the plan start date or the horizon period.

4. Click Execute

USER TRAINING MANUALPM – Preventive Version 1.0 Page 61 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Maintenance plan xx scheduled”

5. Click Back

The system displays the message “Scheduling called for all maintenance plans
selected”

USER TRAINING MANUALPM – Preventive Version 1.0 Page 62 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

6. Click Continue

7. Click Back

USER TRAINING MANUALPM – Preventive Version 1.0 Page 63 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

8. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 64 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

5. Background Job for Deadline Monitoring of Plans – IP30


SCENARIO
You have to set up an automatic background job for deadline monitoring. The deadline
monitoring is an automatic functionality in the system to trigger the creation of work
order when it is due.

This setup may be performed once only.

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Preventive Maintenance
Maintenance Planning Scheduling for Maintenance Plans IP30 - Deadline
Monitoring

1. Double click IP30 - Deadline Monitoring

USER TRAINING MANUALPM – Preventive Version 1.0 Page 65 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Exercise step: Update the following fields:


Field Name Values
Maintenance Plan Use the maintenance plan created in exercise # 8

3. Follow the Path Program  Execute in Background

4. Select Execute in Background

5. Exercise step: Update the following fields:


Field Name Values
Output Device LP01

USER TRAINING MANUALPM – Preventive Version 1.0 Page 66 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

6. Click Continue

7. Click Continue

8. Click Date/Time

USER TRAINING MANUALPM – Preventive Version 1.0 Page 67 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

9. Information step:

Field Name Field Description


Scheduled start Planned Start Date for Background Job
Time Planned start time for background Job
No Start After Latest Execution Date for a Background Job

10. Exercise step: Update the following fields:


Field Name Values
Scheduled start Date Today’s date
Time 24:00:00

USER TRAINING MANUALPM – Preventive Version 1.0 Page 68 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

11. Click Period values

12. Click Daily

13. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 69 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

Note:

Periodic job indicator has been set automatically

14. Click Save

USER TRAINING MANUALPM – Preventive Version 1.0 Page 70 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

The system displays the message “Background job was scheduled for program
RISTRA20”

Note:

This means that a background job will be automatically run every day night at
midnight

15. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 71 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

6. Display Generated Order List – IW39


SCENARIO
Use the following steps to display the generated order or orders after scheduling the
maintenance plan.

INSTRUCTIONS
Follow the Menu Path: Logistics Plant Maintenance Maintenance Processing
Order Order ListIW39 – Display

1. Double click IW39 – Display

USER TRAINING MANUALPM – Preventive Version 1.0 Page 72 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

2. Scroll down to find Maintenance Plan searching field


3. Exercise step: Update the following fields:
Field Name Values
Period Current date + 10 days
MaintenancePlan Refer to the previous exercise

4. Click Execute

USER TRAINING MANUALPM – Preventive Version 1.0 Page 73 of 74


USER TRAINING MANUAL
PM – Preventive Maintenance

5. Click Exit

USER TRAINING MANUALPM – Preventive Version 1.0 Page 74 of 74