Sie sind auf Seite 1von 1

REQUEST TO MODIFY

EQUIPMENT STANDARD

RIG No.: 12 DATE: 13-05-2017


dd-mmm-yyyy

AREA: Bapetco field NAME (Optional): Abdel Al Aliem Awad


STANDARD #: API 16 D POSITION: Senior Tool Pusher
Accumulator Model No : FKQ480 Product No : 16-21 SHENKAI
EQUIPMENT:

PROPOSED MODIFICATIONS TO STANDARD


After the draw- down test of accumulator , it was observed that the resorded pressure is zero

It is recommended to increase the accumularor volume by increseing the number of HP


Bottles by 4

Required manufacturing approval and supervision

JUSTIFICATION / REASONING BEHIND MODIFICATION

After the draw- down test of accumulator , accumulator pressure should be 200 psi over
desired precharge pressure

ECONOMIC IMPACT (if any)

SUBMITTAL SIGN OFF


RIG Superintendent Operation MANAGER:

SIGNATURE: SIGNATURE:

Drilling QHSE manager


SIGNATURE:

Das könnte Ihnen auch gefallen