Sie sind auf Seite 1von 3

Annex B-2

Notarized LGU Certification for Potable Water System Projects

LETTERHEAD OF THE LOCAL GOVERNMENT UNIT

CERTIFICATION

In the implementation of Potable Water System Project/s in the Municipality of


____________________ under the 2018 AM Program for the following project/s:

1.
2.
3.

We hereby certify that:

1. The Detailed Engineering Design (DED) and the Program of Work (POW)
have been prepared and approved in accordance with the national
government standards and relevant provisions of the R.A. No. 10964 (F.Y.
2018 GAA) and other applicable laws and issuances, and copies submitted
to the concerned DILG-PO thru the MLGOO.

2. All bidding documents have been completed and ready to proceed with
publications of Invitation to Bid/ Advertisement (ITB/Ad).

3. ECC or CNC application have been submitted to the concerned DENR-EMB.

4.a The Project is not located in an ancestral domain area; or

4.b The project is located in an ancestral domain area; application for free-prior
informed consent (FPIC) has been submitted to NCIP.

5. The site of the project has no problem on Land Ownership and/or Road
Right-of-Way (RROW).

6. The water source has been validated by the Municipal Engineer and has been
found to be:

6.1 Feasible to supply the intended beneficiaries (based on the water


source assessment and feasibility study); and

6.2 Potable for drinking or scientific or engineering interventions /


measures have been included in the design to make the water potable.
Water is potable if it has passed the Potability Test/Water Quality Test.

7. For Vertical Structures for Potable Water Supply Projects (i.e.


Ground/Elevated Water Tank, Reservoir, Filtration Facilities, Pump House,
among others):

a. The project site is located in safe zone based on the MGB hazard map; or
Annex B-2
Notarized LGU Certification for Potable Water System Projects

b. The project is located in hazard zone but engineering mitigation


measures have been included in the design to address the potential
problems

8. Funds shall be made available for the maintenance and insurance where
applicable once the project is completed.

9. Procurement of the project/s is included in the MUNICIPALITY’s Annual


Procurement Plan and the Invitation to Bid (ITB)/ Advertisement is targeted
to commence within 7 days after the date of this Certification.

10. The copies of approved DED and POW have been provided to DILG-PO thru
the MLGOO. Consequently, concerned CSOs have been notified of the
submission of Annexes A and B to DILG.

11. The Implementation Schedule (Annex C) have been prepared and approved
in accordance with the prescribed implementation timelines in the DILG MC
No. __, Series of 2018, and copies submitted together with this Certification
to the concerned DILG-PO thru the MLGOO. Revised Annex C shall be
furnished to DILG-MLGOO and concerned CSOs for every revision thereof.

12. The above documents shall be made available to DILG during field
monitoring visits and/or as may be requested.

13. The LGU has a functional Project Monitoring Team in-charged of closely
monitoring the projects under the Local Government Support Fund (LGSF).
Attached is a copy of an Executive Order intended for the purpose.

This Certification is being issued in compliance with the DILG Memorandum Circular
No._____, Series of 2018.

______________________ ________________
Municipal Planning and Date
Development Coordinator

______________________ ________________
Municipal Engineer Date

______________________ ________________
Local Chief Executive Date
Annex B-2
Notarized LGU Certification for Potable Water System Projects

ACKNOWLEDGEMENT
REPUBLIC OF THE PHILIPPINES
(Municipality/City of ________________) S.S.

Subscribed and sworn to before me on this date, a Notary Public for and in
__________, Philippines.

NOTARY PUBLIC

Doc. No. ________


Book No. ________
Page No. ________
Series of ________

Das könnte Ihnen auch gefallen