141. the best method of arresting the development process is to place the film in a fixer solution.

142. Wetting agent are used primarily as a Detergent for Water spots.

143. Kegunaan yang utama dari fungsi larutan fixer ialah Menghapus garam perak yang tak bereaksi.

144. The RT Procedure and technique as per AWS D.1.1:2015 shall be in conformance with Part E of
Section as required by paragraph 6.14.1.

145. Suatu fabrikasi pengelasan girth weld pressure piping di weld dengan SMAW, dan diharuskan
diperiksa dengan 100% Radiography, yang akan dilaksanakan oleh PT. Lekomaras dengan RT procedure
007/LM/RT/ASME V/2/2006. Anda sebagai Welding Inspector ditugaskan mengevaluasi pekerjaan
tersebut, apakah tindakan anda yang pertama terhadap prosedur RT diatas. merekomendasikan untuk
mendemonstrasikan RT procedure diatas dan mengevaluasi hasilnya dengan referensi acuannya sesuai
persyaratan ASME V paragraph T221-2.

146. RT procedure covering Pressure piping is ASME V Article 2 and Acceptance Criteria:

a. AS.ME Section VIII division 1

b. ASME B 31.1

c. ASME B 31.3

d. API 1104

147. As per ASME V Article 2, the transmitted film density through the radiographic image of the body of
the appropriate adjacent to the designated wire of a wire IQI and the area of interest shall be: 4.0
Maximum for either single or composite viewing. (VII-282.1)

148. As per API 1104 RT film result shall be interpreted by – Level II or III only in accordance ASNT-TC-1A,
ACCP or other recognized national certification programs _ paragraph reference (8.4.1)

True or false

149. API 1104 call Rejected if any inadequate penetration: (9.3.1.a, 9.3.2.a)

a. Any length regardless of condition joints

b. Any 1” length with density 4.0

c. Any exceed 1” individual for penetration without Hi-Low

d. Any exceed 2” individual for penetration with Hi-Low

150. One of the rejection criteria of Burnt Through (BT) for pipe OD > 60.3 mm of API 1104

a. the maximum dimension exceeds 1/4”

b. the maximum dimension exceeds the thinner of the c: specified s: nominal wall thicknesses joined and
the density in any portion of the BT’s image exceeds that of the thinnest adjacent parent material.

d. a and b correct.
151. In most codes, standard rules of specification dealing with RT acceptance criteria, called that any
cracks is rejected, except for API 1104. Paragraph Reference 9.3.10. True.

152. The RT acceptance criteria for Un Fired pressure vessel

a. ASME SECTION V Part 2

b. ASME B 31.3

c. ASME SECTION VIII Curent edition

d. a and c Correct

153. Berkabutnya film radiography yang akan di review (Overall Fog) dapat disebabkan oleh factor
dibawah ini: developer terlalu lama (over-development), dan film expired (over-age film). Dan terlalu lama
tersinari safe light sebelum di tembak dan di proses (Prolonged exposure to safelight), dan safe light yang
tak sesuai (improper safelight filter) e.

154. Dibawah ini termasuk parameter yang dapat mempengaruhi kualitas RT film, sebelum dibaca
(direview) kecuali.

155. Penampilan Film yang telah diproses seperti putih susu (Milky appearance) disebabkan oleh dibawah
ini kecuali: Proses fixer yang terlalu lama (Over Fixing)

156. Slag lnclusion adalah cacat pada All the above correct.

157. Penyebab terjadinya Lack of Penetration (IP) pada Las-lasan SMAW ialah, Kecuali: Tungsten electode
diameter tidak sesuai.