This manual concerns the alternator which We wish to draw your attention to the contents
you have just purchased. of this maintenance manual. By following
certain important points during installation,
The latest addition to a whole new generation use and servicing of your alternator, you can
of alternators, this range benefits from the look forward to many years of trouble-free
experience of the leading manufacturer operation.
worldwide, using advanced technology and
incorporating strict quality control.
WARNING
ARNING
Note: LEROY-SOMER reserves the right to modify the Copyright 2003: LEROY-SOMER
characteristics of its products at any time in order to This document is the property of:
incorporate the latest technological developments. The MOTEURS LEROY-SOMER
information contained in this document may therefore be It may not be reproduced in any form without prior
changed without notice. authorization.
All brands and models have been registered and patents
applied for.
2
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
CONTENTS
1.1 - Standards and safety measures ..................... 4 5.1 - First maintenance parts ................................. 24
2 - TECHNICAL CHARACTERISTICS
3 - INSTALLATION
4 - SERVICING - MAINTENANCE
3
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
ALTERNATEURS ALTERNATORS
LSA Date PUISSANCE / RATING
Tension
N° 5700 125897 A15 Hz Voltage
V
Min-1/R.P.M. 1500 Protection Ph.
Made in France - 1 024 959/a
4
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
Armature
5+ 6-
T4 T10 T5 T11 T6 T12
Field
Armature
5+ 6-
T4 T10 T5 T11 T6 T12
Field
PMG
Armature
5+ 6-
T4 T10 T5 T11 T6 T12
Field
5
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
Frequency
50 Hz 60 Hz Hz
Voltage reference
4 x Ø5.8 x 50 mm
1A
0V E— E+ Z2 X1 Z1 X2
75 mm L1
E+
0V
110
L2
E-
140 mm
115 mm
S2 P2
L3
5+
S1 P1
F1 Slow fuse
250V 8 A
P1 U V W
6
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
Response time
ST2 normal fast
Pwr supply
(see 2.3.2)
LAM 15%
200 x 140 mm
ST10 LAM 25% 4 x fl5.8 x 175 x 115
P3 380
Stability
With PMG excitation, a permanent magnet generator (PMG)
is added to the alternator. This is fitted at the rear of the P2
machine and connected to the R 448 AVR. The PMG supplies Voltage
the AVR with voltage which is independent of the main
alternator winding. As a result the machine has a short-circuit ST646.2
current capacity of 3 IN for 10 s, and good immunity to 47.1
distortions generated by the load. 49.1
P1 ST9
AREP
Quad droop
The AVR monitors and corrects the alternator output voltage ST1 PMG
Single-phase
by adjusting the excitation current. detection
to approximately 1A.
The alternator must be stopped (or the power switched off,
see section 3.5.3) in order to reset the protection. 2.4.2 - R 448 power supply connection
- Fuse:
AREP excitation
• F1 on X1,X2.
- voltage sensing: 5 VA isolated via transformer Yellow
0-110 V terminals = 95 to 140 V R448 X2
Red
0-220 V terminals = 170 to 260 V Z1
0-380 V terminals = 340 to 520 V Green Aux. windings
X1
- voltage regulation ± 0.5% Black
Z2
- normal or rapid response time via ST2 jumper
- voltage adjustment via P2 potentiometer E+ 5+ 6-
other adaptation transformer voltages E-
- current sensing: (parallel operation): Exciter field
C.T. 2.5 VA cl1, secondary 1A (optional)
- quadrature droop adjustment via potentiometer P1
- underspeed protection (U/f) and LAM: frequency threshold
7
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
PMG excitation
R448 14 Voltage
X2
15
Z1 PMG Transient voltage drop
16 UN
X1
Z2
5+ 6-
E+ 0.9
E-
(U/f)
2.4.3 - Frequency compared with voltage 0.8 LAM
(without LAM)
Frequency
Voltage Bend 57.5 Hz Max. speed drop
U/UN 48 Hz LAM
100 %
fN
50 Hz
60 Hz
0.9
0.8
Frequency
50 Hz 60 Hz Hz Power
LAM
2.4.4 - LAM characteristics
Load on the
8
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
9
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
A L1(U) Winding 50 Hz 60 Hz
T1 T7
3-phase 6 190 - 208 190 - 240
L3(W)
7 220 - T12 T6 T9 T3
T4 T10 N
L2(V)
T12 T5 8 - 190 - 208
T11 T5 T8 T2
T9 T2
T11 R 230 voltage sensing: L1(U)
T6 0 => (T8) / 110 V => (T11) T10 T4 T7 T1
Winding 50 Hz 60 Hz
T1 L1(U)
D 6 380 - 415 380 - 480
3-phase T4 L3(W)
T7
7 440 -
T12 T6 T9 T3
N 8 - 380 - 416 L2(V)
T10
T12 T11 T5 T8 T2
R 230 voltage sensing:
T9 L1(U)
T11 T5 0 => (T8) / 110 V => (T11)
T10 T4 T7 T1
T3 T6 T8 T2
R 448 voltage sensing:
N NDE
L3(W) L2(V) 0 => (T3) / 380 V => (T2)
9 - 600
Winding 9: R 448 voltage sensing + transformer (Diagram on request)
L1(U) Winding 50 Hz 60 Hz
F ( )
Single-phase
T12 T1 6 220 - 240 220 - 240
L3(W)*
or 7 240 - 254
T9 T4 - T12 T6 T9 T3
3-phase T6 T7
L2(V)
8 - 220 - 240
T11 T5 T8 T2
T3 T10
R 230 voltage sensing: L1(U)
L3(W) L2(V)
T11 T8 T5 T2
L 0 => (T8) / 110 V => (T11) T10 T4 T7 T1
L M AR M
Voltage LM = 1/2 voltage LL
R 448 voltage sensing:
0 => (T3) / 220 V => (T2) Operating phases L2 (V), L3 (W)
single phase
10
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
N - L2(V)
T4
8S 380 - 416
T5 T2
T5 L1(U)
T6 R 448 voltage sensing:
0 => (T3) / 380 V => (T2) T4 T1
T3 T2 N
NDE
L3(W) L2(V)
9S - 600
Winding 9: R 448 voltage sensing + transformer (Diagram on request)
Winding 50 Hz 60 Hz ( )
F
Single-phase
L1(U)
6S 220 - 240 220 - 277 L3(W)
*
T6 T3
or 3-phase T6 7S 240 - 254 -
T1
L2(V)
8S - 220 - 240 T5 T2
L1(U)
T3 T4
T4 T1
R 448 voltage sensing: NDE
T5 T2 0 => (T3) / 220 V => (T2)
L3(W) L2(V) Operating phases: L2 (V), L3 (W) single phase
R 791 T Interference suppression kit (standard for CE marking) Remote voltage potentiometer
Connections A D F
Black T1 T1 T1
Black T2 T2 T2
ST4
Black T3 T3 T3 Voltage adjustment
Blue N N via remote potentiometer
White
11
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
12
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
WARNING
ARNING
The various adjustments during tests must be Before any intervention on the AVR, make sure that the
made by a qualified engineer. ST9 jumper is closed with AREP excitation and open
circuit with PMG excitation.
WARNING
ARNING
Ensure that the drive speed specified on the
nameplate is reached before commencing
adjustment
Voltage 400V - 50 Hz
After operational testing, replace all access panels (Input
minimum fully anti-clockwise P2
or covers. 0 - 380 V)
13
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
f) Turn the stability potentiometer P3 anti-clockwise to 2 3.5.3 - Max. excitation setting (excitation
marks away from the central position. ceiling)
g) Start the engine and set its speed to a frequency of 48 Hz Max. excitation depending on the mains frequency
for 50 Hz, or 58 for 60 Hz. ST3
14
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
X2 AREP / PMG
Z1
X1
Z2
E+
- Field forcing
Z1 t - +
X1 Battery (B Volt)
Z2
E+
~ 10 ohms
E-
Exciter field
Field forcing
B Volt
Time
15
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
WARNING
ARNING
Do not use: trichlorethylene, perchlorethylene,
Servicing or troubleshooting must be carried out trichloroethane or any alkaline products.
strictly in accordance with instructions so as to
avoid the risk of accidents and to maintain the Certain strictly defined pure volatile degreasing agents can be
machine in its original state. used, such as:
- Normal petrol (without additives)
- Toluene (slightly toxic); inflammable
- Benzene (or benzine, toxic); inflammable
- Ciclohexare (non toxic); inflammable
All such operations performed on the alternator
should be undertaken by personnel trained in the Cleaning of the stator, rotor, exciter and diode bridge
commissioning, servicing and maintenance of The insulating components and the impregnation system are
electrical and mechanical components. not at risk of damage from solvents (see the above list of
authorised products).
Before any intervention on the machine, ensure that it cannot Avoid letting the cleaning product run into the slots. Apply the
be started by a manual or automatic system and that you product with a brush, sponging frequently to avoid
have understood the operating principles of the system. accumulation in the housing. Dry the winding with a dry cloth.
Let any traces evaporate before reassembling the machine.
4.2 - Routine maintenance
4.2.5 - Mechanical servicing
4.2.1 - Checks after start-up
After approximately 20 hours of operation, check that all fixing WARNING
ARNING
screws on the machine are still tight, plus the general state of
the machine and the various electrical connections in the Cleaning the machine using water or a high-
installation. pressure washer is strictly prohibited.
Any problems arising from such treatment are not
4.2.2 - Cooling circuit covered by our warranty.
It is advisable to check that circulation of air is not reduced by
Degreasing: Use a brush and detergent (suitable for
partial blocking of the air intake and outlet grilles: mud, fibre,
paintwork).
grease, etc.
Dusting: Use an air gun.
If filters have been added to the machine after manufacture
4.2.3 - Bearings and do not have thermal protection, the service personnel
The bearings are regreasable (option). It is advisable to should clean the air filters periodically and systematically, as
lubricate the machine during operation. Time intervals and often as is necessary (every day in very dusty atmospheres).
quantity of grease are given in the table below. The filter cant be cleaned with air gun in case of dry dust.
NDE/DE bearing 6318 C3 6315 C3 The filter must be changed in case of greasy dust.
After cleaning the alternator, it is essential to check the
Quantity of grease 41 g 30 g winding insulation (see sections 3.2 and 4.8).
Regreasing interval 3500 hrs 4500 hrs
16
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
Fault Action
- If the bearing has turned blue or if the grease has turned black, change
Bearing Excessive temperature rise in one or the bearing.
both bearings (bearing temperature
more than 80 °C) with or without - Bearing not fully locked (abnormal play in the bearing cage).
abnormal bearing noise.
- Check the end shield alignment (flange not properly fitted).
- Air flow (intake-outlet) partially clogged or hot air is being recycled from
Excessive temperature rise in the the alternator or engine
Abnormal alternator housing (more than 40° C
temperature above the ambient temperature) - Alternator operating at too high a voltage (> 105% of Un on load)
- Alternator overloaded
- Misalignment (coupling)
Excessive vibration
Vibration - Defective mounting or play in coupling
- Mis-paralleling
Possible consequences:
17
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
- Loose connections
Voltage Adjust the If no effect: try normal or fast
oscillations AVR stability stability modes (ST2) - Faulty AVR
potentiometer
- Speed too low when on load (or LAM set too high)
Voltage between E+ and E-
(DC) - Check the speed (or LAM set too high)
SHUNT/AREP/PMG < 10V
Voltage Run at no load and
correct check the voltage - Faulty rotating diodes
at no load and between E+ and E- on Voltage between E+ and E-
too low when the AVR - Short-circuit in the revolving field coil. Check the
on load SHUNT/AREP/PMG > 15V resistance
18
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
4.5.1 - Checking the winding Assembly A: Connect a 12 V battery in series with a rheostat
of approximately 50 ohms - 300 W and a diode on both exciter
You can check the winding insulation by performing a high field wires (5+) and (6-).
voltage test. In this case, you must disconnect all AVR wires.
ASSEMBLY A 6 - Exciter field 5 +
WARNING
ARNING
Diode 1A Rh. 50½ -300W
Damage caused to the AVR in such conditions is
not covered by our warranty.
+
-
12V battery
After operational testing, replace all access panels
or covers.
4.5.2 - Checking the diode bridge Assembly B: Connect a “Variac” variable power supply and
a diode bridge on both exciter field wires (5+) and (6-).
A diode in good working order should allow the current to flow
Both these systems should have characteristics which are
only in the anode-to-cathode direction
compatible with the field excitation power of the machine (see
the nameplate).
Anode A Cathode 3) Run the unit at its rated speed.
C 4) Gradually increase the exciter field current by adjusting the
- + rheostat or the variac and measure the output voltages on L1
C C C A C - L2 - L3, checking the excitation voltage and current at no
load and on load (see the machine nameplate or ask for the
factory test report).
When the output voltage is at its rated value and balanced
A A A within 1% for the rated excitation level, the machine is in good
+ ~ ~ ~ + working order. The fault therefore comes from the AVR or its
associated wiring (ie. sensing, auxiliary windings).
~ ~ ~ + ASSEMBLY B
- - -
C A 6 - Exciter field 5+
C C C
40
50 60 +
30
70
Diode 1A
20
80
10
90
A A A 0 100
- DC
Variac AC 12V
4.5.3 - Checking the windings and rotating 220V
diodes using separate excitation
19
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
20
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
4 78 36
Threaded rod
Dowel
Nut
Rotor
NDE shield
WARNING
ARNING
When dismantling the rotor involves changing
parts or rewinding, the rotor must be rebalanced.
WARNING
ARNING
4.6.8 - Reassembling the machine
When dismantling the shields, you will need to
- Mount the rotor (4) in the stator (1) (see drawing above)
change the antifriction bearings, the “O” ring seal
taking care not to knock the windings.
and the preloading (wavy) washer.
If using a single-bearing or double-bearing machine with the
regreasable bearing option:
4.6.6 - Replacing the DE bearing - Mount the new preloading (wavy) washer (79) + the new “O”
- Remove the air outlet grille (33). ring seal (349) in the shield (36).
- Remove the 6 screws (31) from the DE shield and the 4 - Screw a threaded rod into the thrust bearing (78).
screws (62) from the inner bearing retainer. - Refit the shield (36) on the machine using a dowel and nut
- Remove the shield (30). in the shaft extension (see diagram).
- Take out the ball bearing (60) using a puller with a central - Slide the threaded rod into the shield hole to make it easier
screw (see section 4.6.5). to assemble (see diagram).
- Fit the new bearing, after heating it by induction to - Fit the thrust bearing screws (78), remove the threaded rod,
approximately 80 °C. fit the other screw and tighten up the assembly.
- Screw a threaded rod into the thrust bearing (68). - Tighten the 5 bearing screws (37).
- Refit the shield (30) on the machine. - Reconnect exciter wires E+, E-.
- Slide the threaded rod into the shield hole to make it easier - Finish reassembling the cover.
to assemble (see basic diagram). - Refit the flange (30) on the stator (1).
- Tighten the bottom thrust bearing screws (68), remove the - Tighten the screws (31).
threaded rod and fit the other screws. If using a double-bearing machine:
- Tighten the 6 shield screws (31). - Mount the new preloading (wavy) washer (79) + the new “O”
- Refit the air outlet grille (33). ring seal (349) in the shield (36).
- Refit the shield (36) on the machine using a dowel and nut
in the shaft extension (see diagram).
WARNING
ARNING - Tighten the 5 shield screws (37).
When dismantling the machine, always change the - Reconnect exciter wires E+, E-.
antifriction bearings. - Finish reassembling the cover.
- Screw a threaded rod into the thrust bearing (68).
- Refit the shield (30) on the machine.
4.6.7 - Dismantling the rotor assembly - Slide the threaded rod into the shield hole to make it easier
- Remove the NDE shield (36) as described in section 4.6.5. to assemble (see basic diagram).
- Remove the DE shield (30) as described in section 4.6.6 if it - Fit the thrust bearing screws (68), remove the threaded rod,
is a double-bearing machine fit the other screw and tighten up the assembly.
- Support the DE rotor (4) with a strap or with a support - Tighten the 6 shield screws (31).
constructed in accordance with the following drawing. - Refit the air outlet grille (33).
- Move the strap as the rotor moves in order to distribute the - Check that the machine assembly is correctly mounted and
weight over it. that all screws are tightened.
21
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
51 WARNING
ARNING
With the PMG, check that the ST9 jumper is open circuit.
418
417
22
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
23
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
Ref. Description Qty LSA 47.2 Part ref 5.3.2 - Temperature sensors with thermistors
Emergency kit 1 (PTC)
198 AVR 1 R 448 AEM 110 RE 005 These are thermistor triplets with a positive temperature
343 Diode bridge assembly 1 LSA 471. 9. 07 ADE 471 EQ 007 coefficient installed in the stator winding (1 per phase). There
LSA 471.9.08 ADE 471 EQ 008 can be a maximum of 2 triplets in the winding (at 2 levels:
347 Surge suppressor 1 LSA 461.9.01 CII 111 PM 005 warning and trip) and 1 or 2 thermistors in the shields.
AVR fuse 2 250 V - 10 A PEL 010 FA 004 These sensors must be linked to adapted sensing relays
(supplied optionally).
Other spare parts Cold resistance of cold thermistor sensors:
100 to 250 Ω per sensor.
60 Drive end bearing 1 6318 2RS/C3 RLT 090 TS030
70 Non drive end bearing 1 6315 2RS/C3 RLT 075 TS030 5.3.3 - Connection accessories
- 6-wire machines
When ordering spare parts, you should indicate the complete Requirements for coupling (F):
machine type, its serial number and the information given on - 3 flexible shunts
the nameplate.
24
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
366 48
130
49 466
365
131 21
53
128 72
71
41
124
198
367
31
325
322
323
37
51
36
90
91
79
349
70
78
100
347
107
343
28
1
4
34
33
15
30 297
296
295
294
293
292
291
290
25
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
366 48
130
49 466
365
131 21
53
128 71
41
124
198
367
31
60
22
62
37
51
36
90
91
79
349
70
100
347
107
343
28
1
4
34
33
15
68 297
30 296
295
294
293
292
291
290
26
LEROY-SOMER INSTALLATION AND MAINTENANCE 3742 en - 04.2003 / a
27