Beruflich Dokumente
Kultur Dokumente
- CICLO: 10°CICLO
1
TAREA DE MALLA DE PERFORACIÓN
clear,clc
fprintf(' \n')
disp(' MALLAS DE PERFORACION')
fprintf(' \n')
disp(' Condiciones de entrada')
fprintf(' \n')
hole_diameter=45;
empty_hole=102;
tunnel_width=4.5;
abutment_height=4;
Height_of_arch=0.5;
Lookout_for_contours_holes=3;
Angular_deviation=0.01;
Collar_deviation=0.02;
Heat_of_explosion=4.5;
Gas_volume_at_STP=0.85;
Density=1200;
Rock_constant=0.4;
fprintf(' \n')
fprintf(' \n')
disp(' Calculando')
fprintf(' \n')
Qe_LFB_dynamite=5;
Ve_LFB_dynamite=0.85;
2
S_LFB=((5*tunnel_width)/(6*Qe_LFB_dynamite))+((1*Gas_volume_at_STP)/(6*Ve
_LFB_dynamite));
S_LFB_ANFO=0.84;
S_ANFO=S_LFB/S_LFB_ANFO;
fprintf(' \n')
Maximum_Burden=round(1.7*empty_hole/1000,2);
H=round(0.15+34.1*(empty_hole/1000)-39.4*((empty_hole/1000)^2),2);
Practical_Burden=round(Maximum_Burden-
(Angular_deviation*H+Collar_deviation),2);
Charge_Concentration=55*(hole_diameter/1000)*((Maximum_Burden/(empty_hole
/1000))^1.5)*(Maximum_Burden-
((empty_hole/1000)/2))*(Rock_constant/0.4)/S_ANFO;
Unloaded_hole_length=round(10*(hole_diameter/1000),2);
Hole_distance_in_quadrangle=round(sqrt(2)*Practical_Burden,2);
No_of_25_x_600_cartridges=(H-Unloaded_hole_length)/(cartridge1/1000);
fprintf(' \n')
3
fprintf(' \n')
fprintf(' \n')
Rectangular_Opening = round(sqrt(2)*(Practical_Burden-
((H*Angular_deviation+Collar_deviation))),2);
B=round(8.8*(10^(-
2))*sqrt(Rectangular_Opening*charge_concentration*S_ANFO/((hole_diameter/
1000)*Rock_constant)),2);
Practical_Burden_B2=round(B(2)-(Angular_deviation*H+Collar_deviation),2);
Unloaded_hole_length_hs=10*hole_diameter/1000;
Hole_distance_in_quadrangle2=sqrt(2)*(Practical_Burden_B2+Hole_distance_i
n_quadrangle/2);
No_of_32_x_600_cartridges=(H-Unloaded_hole_length_hs)/(cartridge2/1000);
fprintf(' \n')
fprintf(' \n')
fprintf(' \n')
F=round((H*Angular_deviation+Collar_deviation),2);
A=round(sqrt(2)*(Practical_Burden_B2 + B(1)/2 - F),2);
Maximum_Burden3=round(8.8*(10^(-
2))*sqrt(A*charge_concentration(3)*S_ANFO/((hole_diameter/1000)*Rock_cons
tant)),2);
Practical_Burden3=round(Maximum_Burden3-
(Angular_deviation*H+Collar_deviation),2);
Unloaded_hole_length_h=10*hole_diameter/1000;
Hole_distance_in_quadrangle3=sqrt(2)*(Practical_Burden3+Hole_distance_in_
quadrangle2/2);
No_of_38_x_600_cartridges=(H-Unloaded_hole_length_h)/(cartridge3/1000);
4
fprintf(' -Maximum burden for d38 cartridges B = %3.2f m
\n',Maximum_Burden3)
fprintf(' -Practical_Burden (B3) = %3.2f m
\n',Practical_Burden3)
fprintf(' -Unloaded_hole_length = %3.2f m
\n',Unloaded_hole_length_h)
fprintf(' -Hole_distance_in_quadrangle (A´) = %3.2f m
\n',Hole_distance_in_quadrangle3)
fprintf(' -No_of_32_x_600_cartridges = %3.2f
\n',No_of_38_x_600_cartridges)
fprintf(' \n')
fprintf(' \n')
fprintf(' \n')
F=round((H*Angular_deviation+Collar_deviation),2);
A2=round(sqrt(2)*(Practical_Burden3 + Hole_distance_in_quadrangle2/2 -
F),2);
Maximum_Burden4=round(8.8*(10^(-
2))*sqrt(A2*charge_concentration(3)*S_ANFO/((hole_diameter/1000)*Rock_con
stant)),2);
Practical_Burden4=round(Maximum_Burden4-
(Angular_deviation*H+Collar_deviation),2);
Unloaded_hole_length_h2s=10*hole_diameter/1000;
Hole_distance_in_quadrangle4=sqrt(2)*(Practical_Burden4+Hole_distance_in_
quadrangle3/2);
No_of_38_x_600_cartridges=(H-Unloaded_hole_length_h)/(cartridge3/1000);
fprintf(' \n')
fprintf(' \n')
disp(' Lifters')
fprintf(' \n')
l=charge_concentration(3);
Max_Burden=round(0.9*sqrt((l*S_ANFO/((Rock_constant+(0.07/1.4))*1.45))),2
);
No_of_Lifters=floor((tunnel_width+2*H*sin(Lookout_for_contours_holes*pi/1
80))/Max_Burden+2);
5
Spacing=round((tunnel_width+2*H*sin(Lookout_for_contours_holes*pi/180))/(
No_of_Lifters-1),2);
Spacing_corner_holes=round((Spacing-
H*sin(Lookout_for_contours_holes*pi/180)),2);
Practical_Burden_Pl=round(Max_Burden-
H*sin(Lookout_for_contours_holes*pi/180)-F,2);
Length_of_bottom_charge_hb = (1.25*Practical_Burden_Pl);
Length_of_column_charge_hc= H-Length_of_bottom_charge_hb-
10*(hole_diameter/1000);
fprintf(' \n')
Spacing_S=15.1*hole_diameter/1000;
Burden_B=Spacing_S/0.8;
Bpr=Burden_B-H*sin(Lookout_for_contours_holes*pi/180)-F;
l_min=90*((hole_diameter/1000)^2);
No_of_holes=floor(4.7/Spacing_S+2);
fprintf(' \n')
fprintf(' \n')
fprintf(' \n')
contour=round(4-1.14-Bpr,2);
Maximun_Burden=round(0.9*sqrt((l*S_ANFO/((Rock_constant+(0.07/1.4))*1.2*1
.25))),2);
Practical_Burden=Maximun_Burden-H*sin(Lookout_for_contours_holes*pi/180)-
F;
N_holes=floor((contour/(Maximun_Burden*1.25))+2);
Spacing_contour=contour/2;
6
hb=1.25*Practical_Burden;
hc=H-hb-10*(hole_diameter/1000);
fprintf(' \n')
fprintf(' \n')
disp(' Stoping')
fprintf(' \n')
length_contour = tunnel_width-1.42-2*Spacing_contour;
Max_Burden_B =
round(0.9*sqrt((l*S_ANFO/((Rock_constant+(0.07/1.4))*1.45*1.25))),2);
Practical_burden_Bph = Max_Burden_B-F;
fprintf(' \n')
fprintf(' \n')
disp('Initiation sequence')
fprintf(' \n')
fprintf(' \n')
fprintf(' \n')
disp(' table Summary of explosive consumption')
fprintf(' \n')
7
Number_holes=O;
number_cartridges_D25mm=P;
number_cartridges_D32mm=Q;
number_cartridges_D38mm=R;
Charge_per_hole=S;
Total=T;
fprintf(' \n')
fprintf(' \n')
table(Number_holes,number_cartridges_D25mm,number_cartridges_D32mm,number
_cartridges_D38mm,Charge_per_hole,Total)
fprintf(' \n')
fprintf(' \n')
8
RESULTADO DE TAREA DE MALLA DE PERFORACIÓN
MALLAS DE PERFORACION
Condiciones de entrada
*Hole_diameter(mm) = 45.0000
*Empty_hole(mm) = 102.0000
*Tunnel_width(m) = 4.5000
*Abutment_height(m) = 4.0000
*Height_of_arch(m) = 0.5000
Calculando
S_LFB = 0.9167
S_ANFO = 1.0913
diamentro_mm charge_concentration
____________ ____________________
25 0.59
32 0.97
38 1.36
-Rectangular_Opening A = 0.10 m
-Maximum burden for d25 cartridges B = 0.17 m
-Maximum burden for d32 cartridges B = 0.21 m
9
-Maximum burden for d38 cartridges B = 0.25 m
-Practical_Burden (B2) = 0.16 m
-Unloaded_hole_length = 0.45 m
-Hole_distance_in_quadrangle (A´) = 0.35 m
-No_of_32_x_600_cartridges = 4.62
-Rectangular_Opening A = 0.28 m
-Maximum burden for d38 cartridges B = 0.42 m
-Practical_Burden (B3) = 0.37 m
-Unloaded_hole_length = 0.45 m
-Hole_distance_in_quadrangle (A´) = 0.77 m
-No_of_32_x_600_cartridges = 4.62
-Rectangular_Opening A = 0.70 m
-Maximum burden for d38 cartridges B = 0.67 m
-Practical_Burden (B3) = 0.62 m
-Unloaded_hole_length = 0.45 m
-Hole_distance_in_quadrangle (A´) = 1.42 m
-No_of_32_x_600_cartridges = 4.62
Lifters
-Spacing S = 0.68 m
-Burden_B = 0.85 m
-Burden Practico = 0.63 m
-Minimum charge concentration = 0.18 kg/m
-No_of_holes = 8
10
Stoping
-Length_contour = 0.85 m
-Max_Burden_B = 1.21 m
-Practical_burden_Bph = 1.16 m
Initiation sequence
ans =
7×6 table
Number_holes number_cartridges_D25mm number_cartridges_D32mm number_cartridges_D38mm Charge_per_hole Total
____________ _______________________ _______________________ _______________________ _______________ _____
-Advance =3.0 m
-Specific charge =1.9 Kg/m3
-Total charge weight =111.6 Kg
-Hole depth =3.2 m
-Specific drilling =2.2 m/m3
-Cross-sectional area =19.5 m2
-Total no.of holes =40
11