NR 600, Ch 6, Sec 4

• Reception: scheduled tests and traceability on the equipment upon


Information about consignment (traceability of con- arrival and/or after installation.
signment specifying date of arrival, type of inspec- • Testing and damage reference documents:
tion, check on product packaging, types of specific
For all the previously defined MTI plan processes, pro-
tests performed).
cedures are to be written, defining the types of tests or
• Traceability: inspections performed, the acceptance criteria and the
Description of the yard process to ensure traceability means of handling non-conformities.
of the materials from the time of the reception to the
end of the production operations.
5.5 Society’s certificate
• Hull construction:
Description of the yard process to ensure that the scant- 5.5.1 Certificate of recognition
lings and construction meet the rule requirements in
After completion of the examination, by the Society, of the
relation to the approved drawings.
quality assurance manual, the MTI plan and the yard audit,
• Installation of internal structure: a Certificate of recognition may be granted as per the provi-
Information about the main operations of the internal sions of NR320 Classification Scheme of Materials & Equip-
structure installation. ment, as amended.
• Equipment:
The main equipment to be covered by the rules of the 5.5.2 Certificate of conformity
Society are portholes, windows and deck hatches, Each hull may be certified individually upon request made
watertight doors, independent tanks and rudders, the to the Society.

190 Bureau Veritas February 2017

Das könnte Ihnen auch gefallen