Sie sind auf Seite 1von 2

Checklist for Dr.

Fixit Pidiproof LW+ work procedure

Area of Application: All construction activities - for use in concrete, plasters etc.
Pre application checklist:

 Select all appropriate ingrediants e.g. cement, sand, aggregates of correct sizes and mix
 Clean the concrete mixer with water and then charge cement, sand & aggregates as per
the mix design, mix in dry state for 1-2 minutes
 Start addition of about 75-80% of mixing water and mix for 2 to 3 minutes
 Add Dr Fixit Pidiproof LW+ 200 ml in the remaining water, per every 50 kg bag of
cement in the desired mix design used and mix well
 Add this water with LW+ to the concrte mix in mixer and run for another 2 to 3 minutes
 Discharge the mix for application
 Cure the concrete or plaster as normal

Precautions & Limitations


 Do not add Dr Fixit Pidiproof LW+ directly to dry cement & aggregate mix
 Always maintain water-cement ratio as low as possible.
 Do not increase the doasage of Dr Fixit Pidiproof LW+ than the recommendation
Post application checklist:
 Wash all application tools and hands etc., immediately with water after use.
 Ensure proper cleaning of area
 The waste material has not been thrown down the drain but disposed off properly.
Precautions :
 Do not add directly to the concrete or plaster mix
 Note all details (B.No. / date etc.) of the material received for further references.

All the above mentioned parameters are checked and verified for the pre- application,
during application and post application work carried for the project.
Also followed and adhered to are the precautions mentioned in the list as mentioned by
the manufacturer.

Das könnte Ihnen auch gefallen