INSPECTION CHECKLIST FOR INSTALLATION OF INTERLOCKING PRECAST

CONCRETE PAVERS AND KERBSTONES


Project : ICL Ref. No.
Consultant IR Ref. No.
Contractor Date:
CONSULTANT's
CONTRACTOR
SL No. ACTIVITY REP.
CHECK CHECK

1 Review material submittal for interlock pavers and kerbstone


2 Review drawings
3 Verify Delivered Materials Approval
4 Foundation of kerbstone done as per approved detail
5 Installation of Kerbs & Concrete haunching
Ensure substrate is compacted to a field density not less than 95% of the
6
maximum dry density
7 Sand bedding to 100mm thickness
8 String or chalk line to start and maintain straight bond lines
9 Paver surface broom clean prior to initial compaction
Simultaneous sweeping and vibrating sand into joints with minimum of 4 passes
11
of plate compactor
12 No compaction within 2 m of an unrestrained edge of pavers
Remove excess sand after entire pavement is compacted and joints are filled to
13
bottom of chamfer; broom clean
14 Surface level of pavers 6 mm above adjacent drainage inlets & gullies

15 Surface levels conform to drawings


16 Check filling of joints with sand Fill and re-vibrate if necessary

CONTRACTOR:
NAME :___________________________________SIGNATURE :_______________________________
DATE :___________________

CONSULTANT's REPRESENTATIVE :
NAME :____________________________________
SIGNATURE :_______________________________
DATE :__________________

Form No. -