Sie sind auf Seite 1von 2

FIELD INSPECTION REPORT

PROJECT FORM No: CRM-C-P-001


INSPECTION ITEM: PROJECT : CROWN BEVERAGE CANS MYANMAR
JOB No : PF-001
PILE FABRICATION PLANT :Depawaddy Production Yard
SIGNATURE
INSPECTION NOTICE No : PF-001 CONTRACTOR ACT CLIENT
CLIENT 'S INSPECTOR : / / / / / /
ACT INSPECTOR :
CONTRACTOR'S INSPECTOR :
LOCATION: Depawaddy Production Yard
Dwg No: SPC-01 Precast Concrete Pile Detail (Approved)
BASES FOR INSPECTION:
Doc No:
Pile/pile section

Date Checked

Date Approved

Evaluation
Formwork
Diameter

Top plate
Quantity

Cleanes
Spacer
Length

Stirrup
Rebar

Nose

Other comments:

Conclusion: Accepted Accepted with condition Not accepted