Beruflich Dokumente
Kultur Dokumente
2007 LOUISIANA
TRANSPORTATION ENGINEERING CONFERENCE
BATON ROUGE, LA
FEB. 2007
CUT SETIONS
STANDARD 20’ FLAT APPROACH SLAB
FILL SECTIONS
STANDARD 40’ FLAT APPROACH SLAB
LARGE SETTLEMENT
PILE SUPPORTED APPROACH SLAB
NEW DESIGN OPTIONS
FIELD STUDY
LITERATURE SEARCH
PROJECT SELECTION
FIVE PROJECTS
WITH VARIOUS RANGE OF
EMBANKMENT SETTLEMNT AND DIFFERENT
EMBANKMENT DESIGN FEATURES WILL BE
SELECTED FOR FIELD STUDY
Estimated
Testing Embankment Embankment Design Span Length of Type of Approach Slab
Sections Settlement Features Approach Slab Approach Slab Design Table[4]
“S”
Compact Level,
1 S<0.6 Subsurface Drainage, 20 feet Flat Slab Table 14[4]
Protection Layer
Compact Level,
2 S>0.6 Subsurface Drainage, 20 feet Flat Slab Table 14[4]
Protection Layer
Compact Level,
3 S<2.4 Subsurface Drainage, 40 -60 feet Flat Slab Table 16[4]
Protection Layer
Compact Level,
4 S>2.4 Subsurface Drainage, 40 -60 feet Flat Slab Table 16[4]
Protection Layer
Compact Level,
5 S>3 Subsurface Drainage, 60 – 80 feet Ribbed Slab Table 21[4]
Protection Layer,
PROJECT TASK #3
SLAB DESIGN
(BRIDGE DESIGN)
Footing size to
produce same influence
Approach slab Strip footing as the reinforced
reinforcement
Unreinforced
Reinforced stress zone
stress zone
Stress
Soft soil redistribution
GEOTECHNICAL INSTRUMENTATION
(GEOTECH. & LTRC)
STRUCTURAL INSTRUMENTATION
(LSU & BRIDGE DESIGN)
MAIN OBJECTIVES:
VERIFY EMBANKMENT
SETTLEMENT PREDICTION
AND DETERMINE
SETTLEMENT PROFILE
ALONG SOIL DEPTH
EVALUATE PERFORMANCE
Inclinometer OF REINFORCED SOIL
FOUNDATION AT SLAB
END SUPPORT
SCHEMATIC DIAGRAM FOR
GEOTECHNICAL INSTRUMENTATION
MAIN OBJECTIVES:
Original slab position
Reinforcement
MEASURE SLAB
INTERNAL STRESSES
AND DEFORMATION
AND COMPARE WITH
Pressure sensor ANALYSIS RESULTS
Soil line
Strain gauge
CHECK CRACKING
Tilt gauge
AT SLAB
Abutment Cracker gauge
MEASURE STRESS AT
SLAB END SUPPORT
(SLEEPER SLAB)
PROJECT TASK #5
CONSTRUCTION
DATA ANALYSIS
FINAL REPORT
APPROACH SLAB DESIGN GUIDELINES