Evaluation and Development of Network Distribution of Clean Water

PDAM Unit Lawang


Jadfan Sidqi Fidari 1*,Rahmah Dara Lufira 1 , Endang Purwati1, Riyanto Haribowo 1,Ira
Puspita1
1
Water Resources Engineering, Brawijaya University, Malang, East Java, Indonesia
*Corresponding authors: [jadfan@ub.ac.id]

INTRODUCTION
PDAM unit Lawang use 5 clean water sources to meet service, one of them is Polaman Source.
Discharge is drawn from Polaman Source of 70 liters/second. On existing condition 2015
PDAM unit Lawang zone service of Polaman Source may serve 4 villages with a total 4988 SR.
Every village having different percentage services between 25% -65%.
METHOD
It takes several systematically step to achieve the expected goals. The systematically step work
study as follows: Collecting Data, analysis population data and the number of PDAM services,
evaluate the hydraulic conditions using software WaterCAD V8i, development for clean water
need and hydraulic conditions using software WaterCAD V8i, calculate the budget plan at the
development stage.
In this study there is an evaluation and development to 2030. Development planning by
increasing the number of services to each village with percentage services to 65% on the
Lawang Village and Bedali Village, 85% on the Kalirejo Village and Sidodadi Village. To fulfill
the clean water supply with the increasing, important to increase discharge of Polaman Source
to 80 liters/second. In addition, done the installation of new pipe network by means of parallel
to the existing pipe having the big velocity value.
RESULTS AND DISCUSSION
Simulation of water distribution network with condition is not permanent and the 24-hours
simulation of the time with the interval of 1 hour. Based on the simulation result, it has been
shown that the network distribution of clean water in PDAM unit Lawang until 2030 has been
fulfilled the requirement for the technical planning of distribution systems. The cost of the
development step I is 2.173.000.000 IDR and for the development step III is 2.011.500.000
IDR.
REFERENCES

[1] Anonim.   2007.  Peraturan   Menteri   Pekerjaan   Umum   No:   18/PRT/M/2007   Tentang
Penyelenggaraan   Pengembangan   Sistem   Penyediaan   Air   Minum.   Jakarta:   Departemen
Pekerjaan Umum.
[2] Anonim. 2015. Keputusan Direksi PDAM Kabupaten Malang No 05 Tahun 2015 Tentang
Penetapan   Harga   Perhitungan   Sendiri   Pengadaan   Barang/Jasa   PDAM   Kabupaten
Malang. Malang: PDAM Kabupaten Malang
[3] Bentley Methods. 2007. User’s Guide WaterCAD v8 for Windows WATERBUY CT. USA:
Bentley. Press.
[4] Dake.   JMK.   1985.  Hidrolika   Teknik.   Terjemahan   Oleh   Endang   P.   Tacyhan   dan   Y.   P.
Pangaribuan. Jakarta: Erlangga. 
[5] Triatmodjo, Bambang. 1996. Hidraulika I. Second edition. Yogyakarta: Beta Offset
[6] Webber,   N.   B.   1971.  Fluid   Mechanics   For   Civil   Engineering,   S.   I   Edition.   London:
Chapman and Hall Ltd.