Sie sind auf Seite 1von 10

problem 1

DC BUFFALO ALBANY PHILA CLEVELAND


ALLENTOWN 0 0 52500 47500 100000
TOLERDO 40500 22300 32700 0 95500
22300 85200 47500
>= >= >= >=

DEMAND 40500 22300 85200 47500

DC BUFFALO ALBANY PHILA CLEVELAND


ALLENTOWN 52 32 11 69
TOLERDO 45 84 76 15
OBJECTIVE 384
SUPPLY
<= 100000
<= 100000

1.1

Ans

1.2

Ans

1.3

Ans
1.1           Suppose SteelCo wants to minimize costs. How many pounds of steel should be shippe

100000

1.2          What is the minimum total cost (at which all contraints are met)?

10035900

1.3          If we follow the suggested strategy, only one of the DCs will have additional available

Tolerdo =(100000-95500) = 4500


f steel should be shipped from the DC in Allentown, PA, to the four construction projects, in total?

ve additional available capacity. Which one?


ion projects, in total?
problem 3

PLANT 1 PLANT 2 PLANT 3


CAP/DEMAND 200 300 100
cosst CROSS DOCK 1 30 23 35
CROSS DOCK 2 50 66 14

Quantity to be shifted
PLANT A PLANT B PLANT C
CROSS DOCK 1 0 0 100
CROSS DOCK 2 200 300 0
Total cost 10000 19800 3500
total units 200 300 100

CUSTOMER 1CUSTOMER 2CUSTOMER 3


CROSS DOCK 1 150 0 110
CROSS DOCK 2 0 100 0
total cost 1800 2200 2420
total units 150 100 110
PLANT 4 PLANT 5 CUSTOMER 1 CUSTOMER 2 CUSTOMER 3 CUSTOMER 4
150 220 150 100 110 200
70 65 12 25 22 40
12 70 65 22 23 12

PLANT D PLANT E
150 0
0 220
10500 15400 59200
150 220

CUSTOMER 4CUSTOMER 5
0 0
200 180
2400 2700 11520
200 180
CUSTOMER 5
180
41
15
store 1 store 2 wholesaler capacity
Requirement 20 20
cost whle sale 1 25 26 50
whle sale 2 25.5 25.5 50
boston area 20 20 10 boxes once a week

no.of boxes
whle sale 1 10 0
whle sale 2 0 10
boston area 10 10 20
total boxes 20 20
total cost 450 455 905 Mini.cost of the system

stores demand 20 20
NOW wholesaler 2 24 24
total cost 480 480 960 cost even when wholesaler 2 agreed t
problem 2

boxes once a week

Fruity Juice

the system

hen wholesaler 2 agreed to distribute at Rs 24