SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff - June 2014) Rev 8 30-Jun-14

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Copper Piping SATIP-S-060-08 31-Dec-14 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

SAIC SAIC
1.1 Brazer Qualifications
S-4047 S-4047 RH RH
SAIC SAIC
1.2 Brazing Procedures
S-4048 S-4048 RH RH

See See
1.3 Piping material traceability See SATIP-L-350-01 On-Plot Metallic Piping
Remarks Remarks

2.0 MATERIAL RECEIVING

Piping and Fittings SAIC SAIC Saudi Aramco to be notified on delivery of initial
2.1
Receiving Inspection S-4049 S-4049 W W shipment by type or manufacturer

3.0 INSTALLATION

Copper piping and Joint SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.1
Inspection S-4050 S-4050 W W each location

4.0 PRE-COMMISSIONING

4.1 Not Applicable

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3 organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Copper Piping SATIP-S-060-08 31-Dec-14 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use