Beruflich Dokumente
Kultur Dokumente
side (ME)
ger 1
side (ME)
or 1
side (ME)
Gear 1
RG1
RG1 100 H
RG1
500 H
RG1
RG1 1000 H
RG1 6 Months
RG1 2 Years
RG1
4 Years
RG1
Engine Room Portside (Location)
Hours (Interval)
No time requirement (Non Interval)
tside (AE)
Diesel) 1
AT1 20000 H
tside (AE)
(Diesel) 1
tside (AE)
(Diesel) 2
AE2
AE2
tside (AE)
Diesel) 2
tside (AE)
(Diesel) 2
oard (ME)
ger 2
oard (ME)
or 2
oard (ME)
Gear 2
RG2
RG2 100 H
RG2
500 H
RG2
RG2 1000 H
RG2 6 Months
RG2 2 Years
RG2
4 Years
RG2
Engine Room Starboard (Location)
Hours (Interval)
No time requirement (Non Interval)
tside (AE)
Diesel) 1
AT3 20000 H
tside (AE)
(Diesel) 1
tside (AE)
(Diesel) 2
AE4
AE4
tside (AE)
Diesel) 2
tside (AE)
(Diesel) 2
C -System Location
LOS - Lubricating Oil System
C -System Location
SWS - Sea Water Cooler System
C -System Location
FWS - Fresh Water Cooler System
C -System Location
CWP - Chilled Water Plant System
tion
l System
tion
er System
General Routine
SWS 125 H
SWS
SWS
250 H
SWS General Routine
SWS 500 H
SWS 3000 H
SWS 12000 H
SWS
24000 H
SWS
SWS
SWS Dry Docking
SWS
tion
oler System
tion
ant System