Sie sind auf Seite 1von 64

PILE FOUNDATION

TABLE
pile cap pile BULB

Double
Items No. length width hight cap qty Dia hight pile qty Bulb
A B C D E F G H I J
3.14* G^
ALL DIM. IN FEET C*D*E 2*H/4 I/3
P1 13 3 3 0.5 4.5 1 10.5 8.24 2.75
P2 9 0 0 0 0 0.75 8 3.53 1.18
P3 5 2 2 0.5 2 0.75 8 3.53 1.18

TOTAL 27
Execavtion Shuttering STEEL

Total Bore All All


size Excavatio Total Con. foundatio concrete Total In
/Excavati Excavatio n in all In one n conrete Foundatio All Foun. Steel In
on in one n in all cum Foun. cuf n. In cum Pile cap Shutering SQ.M kg
K L M N O P Q R S T
(C+D)*2*
I+J K*B L/35.32 F+I+J N*B O/35.32 E Q*B R/10.76 P*100
10.99 142.87 4.05 15.49 201.37 5.70 6 78 7.25 570.13
4.71 42.39 1.20 4.71 42.39 1.20 0 0 - 120.02
4.71 23.55 0.67 6.71 33.55 0.95 4 20 1.86 94.99
208.81 5.91 277.31 7.85 98 9.11 690.15
SHUTERI
EXCAVATIO 4 CONCRETE NG STEEL
G.F. Estimate from 45' x49'

DEPTH/HEI
SOR ITEMS NO. side LENGTH WIDTH GHT

Foundation work

2.2.1 Excavation work

5.18 Pcc work

Shuttering

5.7 Concrete

5.20.1 Steel
As per foundation table

FILLING PLINTH
providing and filling in plinth with / bed room 1 12.00 10.00 3
stone dust and hard moorum
under floor including water dining 1 8.39 10.75 3
ramming consolidation dressing kitchen 1 11.70 8.00 3
and cost of labour materials T&P drg hall 1 11.52 15.13 3
etc. complete required for the
work. toilet 1 4.00 7.44 3
2.27.3 ots 1 4.00 3.00 2.5
staire 1 11.52 7.92 3
poarch 1 11.88 13.00 3
open front 1 12.44 9.00 2
open back 1 3.00 1.44 2

SAND/CRUSSER STONE DUST


FLOOR CONCRETING

5.7 providing and laying mechanical bed room 1 12.00 10.00 0.33
mix concrete with crushed stone
aggregate cxcluding cost of cetering dining 1 8.39 10.75 0.33
& shuttering with 40mm nominal kitchen 1 11.70 8.00 0.33
size graded aggregate. drg hall 1 11.52 15.13 0.33
toilet 1 4.00 7.44 0.33
ots 1 4.00 3.00 0.33
staire 1 11.52 7.92 0.33
poarch 1 11.88 13.00 0.33
open front 1 12.44 9.00 0.33
open back 1 3.00 1.44 0.33

FLOOR CONCRETING
BEAM SHUTTERING plinth beam

providing & fixing from work I/C


cemtering shuttering sturting
stagging propping bracing etc.
complete & including its removal
for foundation,footing ,base,of
column & plinth beam in any shape
A & size long wall 1 2 19.04 0.75
B long wall 2 2 25.00 0.75
II/1 short wall 1 2 31.00 0.75
short wall 1 2 27.00 0.75
short wall 1 2 7.92 0.75
short wall 3 2 11.23 0.75
short wall 1 2 10.75 0.75
short wall 1 2 4.00 0.75
bo. Wall lef 1 2 9.39 0.75
A bo. Wall right 1 2 13 0.75
bo wall back 1 2 7.92 0.75
bo wall front 1 2 25.00 0.75

providing & fixing from work I/c


lintel beam
Centering,shuttering,stuting,staggi long wall 1 2 19.04 0.375
ng priping bracing etc.complete &
including its removal upto height of long wall 2 2 25 0.375
4m above plinth level. short wall 1 2 31 0.375
short wall 1 2 27 0.375
short wall 1 2 7.92 0.375
short wall 3 2 11.23 0.375
short wall 1 2 10.75 0.375
short wall 1 2 4 0.75

C SLAB BEAM
long wall 1 2 19.04 1
long wall 2 2 25 1
short wall 1 2 31 1
short wall 1 2 27 1
short wall 3 2 11.23 1
short wall 1 2 10.75 1
poach beam 1 2 34.27 1
projection 1 1

COLUMN
upto plinth
BEAM 27 2 0.75 3

boundary 9 2 0.75 5
main 13 4 0.75 10

Suspended floor,roofs,landing ROOFING


shelves & supported balconies &
chhajjas
bed room 1 12 10
dining 1 8.39 10.75
kitchen 1 11.7 8
drg hall 1 11.52 15.13
toilet 1 4 7.44
ots 1 4 3
staire 1 11.52 7.92
poarch 1 11.88 13

TOTAL SHUTTERING UPTO ROOF

CONCRETING
providing & laying mechanically PLINTH BEAM
fixed excluding the
centering,shuttering & long wall 1 19.04 0.75 0.75
reinforcement in foundation ,plinth long wall 2 25 0.75 0.75
& super structure upto a hight of 4 short wall 1 31 0.75 0.75
short wall 1 27 0.75 0.75
short wall 1 7.92 0.75 0.75
short wall 3 11.23 0.75 0.75
short wall 1 10.75 0.75 0.75
short wall 1 4 0.75 0.75
bo. Wall lef 1 9.39 0.75 0.75
bo. Wall right 1 13 0.75 0.75
bo wall back 1 7.92 0.75 0.75
bo wall front 1 25 0.75 0.75
LINTEL BEAM LINTEL BEAM
long wall 1 19.04 0.75 0.375
long wall 2 25 0.75 0.375
short wall 1 31 0.375 0.375
short wall 1 27 0.375 0.375
short wall 1 7.92 0.375 0.375
short wall 3 11.23 0.375 0.375
short wall 1 10.75 0.375 0.375
short wall 1 4 0.375 0.375

SLAB BEAM SLAB BEAM

long wall 1 19.04 0.75 1


long wall 2 25 0.75 1
short wall 1 31 0.75 1
short wall 1 27 0.75 1
short wall 3 11.23 0.75 1
short wall 1 10.75 0.75 1
poach beam 1 34.27 0.75 1
projection 1 0 0.75 1

COLUMN
upto plinth
BEAM 27 0.75 0.75 3
boundary 9 0.75 0.75 5
main 13 0.75 0.75 10

SLAB bed room 1 12 10 0.375


dining 1 8.39 10.75 0.375
kitchen 1 11.7 8 0.375
drg hall 1 11.52 15.13 0.375
toilet 1 4 7.44 0.375
ots 1 4 3 0.375
staire 1 11.52 7.92 0.375
poarch 1 11.88 13 0.375
TOTAL CONCRTING M-20 MIX
1:1.5:3 all total
TOTAL STEEL
providing & placing in position cold
twisted steel & hot rolled deformed qty in
steel rainforcement for RCC work TOTAL STEEL cum steel %
including cutting ,bending,binding
etc. complete as per drawing PLINTH BEAM 1 3.80 1
including cost of binding wire &
including all wastage Lintel beam 1 1.01 0.8
Slab beam 1 4.37 1
column 1 4.08 1.2
Slab 1 8.13 0.8
TOTAL STEEL

BRICK WORK
Brick work with well burnt chimeny 3'-9" bo
bricks in bull patent trench kiln wall 3'-1'
crushing strength not less than upto to plinth 75"
25/sqcm & water absorption not BEAM
more than 20% in foundation &
plinth
long wall 1 19.04 0.75 2.25
long wall 2 25 0.75 2.25
short wall 1 31 0.75 2.25
short wall 1 27 0.75 2.25
short wall 1 7.92 0.75 2.25
short wall 3 11.23 0.75 2.25
short wall 1 10.75 0.75 2.25
short wall 1 4 0.75 2.25
bo. Wall lef 1 9.39 0.75 1.25
bo. Wall right 1 13 0.75 1.25
bo wall back 1 7.92 0.75 1.25
bo wall front 1 25 0.75 1.25

up to SLAB
d VIII/3 CEMENT MORTAR 1:6 BEAM 10'6-1'-4.5"

long wall 1 19.04 0.75 9.12


long wall 2 25 0.75 9.12
short wall 1 31 0.75 9.12
short wall 1 27 0.75 9.12
short wall 1 7.92 0.75 9.12
short wall 3 11.23 0.75 9.12
short wall 1 10.75 0.75 9.12
short wall 1 4 0.75 9.12
bo. Wall lef 1 9.39 0.75 5.00
bo. Wall right 1 13 0.75 5.00
bo wall back 1 7.92 0.75 5.00
bo wall front 1 25 0.75 5.00
DEDUCTION

D 1 3.5 0.75 7
D1 3 3 0.75 7
D2 1 2.5 0.375 7
W1 3 4 0.75 4.5
w2 2 2.5 0.75 3.5
V 1 2 0.375 1.5
gate 1 8 0.375 6

BRICK WORK

FRAME WORK

Providing wood work in frame of


9.1.2 door & windows & clear story
FRAME windows & other frame wrought
9.1.2 framed & fixed in position D 1 1 3.5 0.21 0.42
1 2 7 0.21 0.42
D1 3 1 3 0.21 0.42
3 2 7 0.21 0.42
D2 1 1 2.5 0.21 0.42
1 2 7 0.21 0.42
W1 3 2 4 0.21 0.42
3 4 4.5 0.21 0.42
w2 2 2 2.5 0.21 0.42
hz 2 3 3.5 0.21 0.42
vt V 1 2 2 0.21 0.42
1 2 1.5 0.21 0.42

FRAME WORK

PANNEL
B 9.6.2 Sal, bija sal, benteak, haldu
pannel providing & fixing 35 . Th paneled
glazed or panneled glazed or D 1 3.5 7
door ,window,I/C ms but hinges & D1 3 3 7
necessary screws. D2 1 2.5 7
W1 3 4 4.5
w2 2 2.5 3.5
V 1 2 1.5

Pannels

VIII Grills
providing & fixing ms satty grills of
req.pattern in wooden framed
window etc. with round head nuts
by screws etc plain grills

73 kg/sqf
W1 3 1.5 4 4.5
w2 2 1.5 2.5 3.5
V 1 1.5 2 1.5

grills Grills

MARBLE

40 mm thick marble chips flooring bed room 1 12 10


rubbed & polished layer of 31 mm
thick cemant concrete 1:2:4 and dining 1 8.39 10.75
top layer 9 mm thick with white & kitchen 1 11.7 8
black marble chips of size lais in drg hall 1 11.52 15.13
cement marble power mix 1:3
toilet 1 4 7.44
ots 1 4 3
staire 1 11.52 7.92

MARBLE

marble chips
poarch 1 11.88 13
open front 1 12.44 9
open back 1 3 1.44

MARBLE chips

Dark shade pigment with ordinary


cemant

a wall tiles white & colour glazed tiles kitchen 1 1 11.7 8 7


in skirttir & rise of stairs & dado on
12mm thick cemant mortar 1:3 & toilet 1 2 4 7.44 5
pointing & white deduction.
TOTAL
D1 1 3 7
D2 1 2.5 7
TOTAL
total with deduction

PLASTER
12 mm cemant plaster (inside wall)
both side ignore outer
long wall 1 2 19.04 10
long wall 2 1 25 10
short wall 1 1 31 10
short wall 1 1 27 10
short wall 1 2 7.92 10
short wall 3 2 11.23 10
short wall 1 2 10.75 10
short wall 1 2 4 10

TOTAL

DEDUCTION D 1 2 3.5 7
D1 3 2 3 7
D2 1 2 2.5 7
W1 3 2 4 4.5
w2 2 2 2.5 3.5
V 1 2 2 1.5
gate 1 2 8 6

TOTAL

In cement mortar 1:6 total inside plaster with dedution

15mm cement plaster(outside wall) long wall 2 1 25 10


short wall 1 1 31 10
short wall 1 1 27 10
bo. Wall lef 1 2 9.39 5
bo. Wall right 1 2 13 5
bo wall back 1 2 7.92 5
bo wall front 1 2 25 5

XI/2 In cement mortar 1:6 total outer plaster with deduction

13.17 6 mm cemant plaster to celling bed room 1 12 10


dining 1 8.39 10.75
kitchen 1 11.7 8
drg hall 1 11.52 15.13
toilet 1 4 7.44
ots 1 4 3
staire 1 11.52 7.92
poarch 1 11.88 13
CHHAJJAS
total celling plaster total celling plaster

WHITE CEMANT & COLOUR


White cemant (2 or more coat ) inside wall
with dry distemper of 2 coats of plaster celling
reqired shade inside wall plaster on
b XIV 10 new work (3 or more coats) to give all plaster
an even shade.

Finishing wall with water proofing out side wall


cemant out side wall plaster paint plaster
XIV of req. shade on new work (2 or
15 more coats) ton give an even
shade.

painting (2 or more coats ) with


synthethic enamel paint on new
work over & including an under
13.4.2 coats of primer to give an even all wall
shade Qty 2.5 times
qty limit no.
(8.5)
Add increement to S.O.R.S. to meet
the current market rates
For sanitary from work
for electric from work
ADDING
TOTAL ESTIMATE ABOVE ALL
ADD FOR ADD EXTER ITEMS (1)..add for
EXTRA boundary wall 140' rf @ 600/=RS
ITEMS per rf

(2)..Add for water proofing


treatments to slab @ RS 40 per sqf

(3)..Add for difference to putty


inside wall & celling sqf @ 22 RS
per sqf
(4).. Add for tube wall boaring with
jet pump
starire cost with recc des, plaster,
white cement
(5)..Mosquito net door & window
shuite
(6)..Modeler kitchen platform with
S.S sink
(7)..Mumty tower over stair case &
parapet wall
(8)..Marble flooring in tread & riser
of steps.
(9)..steel railing in stair case.
GRAND TOTAL

Stair Table

Shuttering 1 27.36 3
Rcc 1 27.36 3 0.375
steel 1 0.87 1
trade wt riser
Brick step 18 0.92 3.00 0.58

Plaster Bottom 1 0 27.36 3


Side 18 0.92 0.96
riser+rcc
trade depth

Marble Tread 16 0.92 3


riser 18 0.58 3
Landing 2 6.5 3
Skirting 18 1.50 0.25
trade +
rise

Steel Railing railling 1 15


pipe 2
Total

Excavation work 208.81 cuf 5.91 cum


pcc work - M15 cement

Foundation 0 1:2:4 306


floar cons. 291.00

291.00 cuf 8.24 cum 2,521.09

shuttering
Foundation 98.00
floar to slab 2,254.64
staire 82.08

2,434.72 sqf 226.28 sqm

concrete
Foundation 277.31 M20 cement
floar to slab 755.16 1:1.5:3 390
staire 30.78
1,063.25 cuf 30.10 cum 11,740.30

steel
Foundation 690.15
floar to slab 2,036.93
staire 87.15
2,814.23 kg

filling 2,523.15 cuf 71.44 cum

brick work 1,654.83 cuf 46.85 cum


bags

1:4 ratio
plaster
12mm 2133 sqf 198.23 sqm

15mm 1,633.10 sqf 151.78 sqm

6mm 765.53 sqf 71.15 sqm


total
UNIT (in QU.M.(in
QUT f) m) RATE AMOUNTS(RS)

208.81 cuf 5.91 203 1,200.13

cuf - 4392

98.00 9.11 250 2,276.95

277.31 cuf 7.85 5000 39,256.80

690.15 kg 690.15 60 41,408.83

360.00 cuf
270.58 cuf
280.80 cuf
522.89 cuf
89.28 cuf
30.00 cuf
273.72 cuf
463.32 cuf
223.92 cuf
8.64 cuf

2,523.15 cuf 71.44 570 40,718.94

39.60 cuf
29.76 cuf
30.89 cuf
57.52 cuf
9.82 cuf
3.96 cuf
30.11 cuf
50.97 cuf
36.95 cuf
1.43 cuf

291.00 cuf 8.24 570.00 4,696.15


28.56 sqf
75.00 sqf
46.50 sqf
40.50 sqf
11.88 sqf
50.54 sqf
16.13 sqf
6.00 sqf
14.09 sqf
19.50 sqf
11.88 sqf
37.50 sqf

358.07 sqf 33.28

14.28 sqf
37.50 sqf
23.25 sqf
20.25 sqf
5.94 sqf
25.27 sqf
8.06 sqf
6.00 sqf

140.55 13.06

38.08 sqf
100.00 sqf
62.00 sqf
54.00 sqf
67.38 sqf
21.50 sqf
68.54 sqf
- sqf

411.50 sqf

121.5
0
67.5
390

579 SQFT

120.00 sqf
90.19 sqf
93.60 sqf
174.30 sqf
29.76 sqf
12.00 sqf
91.24 sqf
154.44 sqf

765.53 sqf

2,254.64 sqf 209.5394 216 45,260.50

10.71 cuf
28.13 cuf
17.44 cuf
15.19 cuf
4.46 cuf
18.95 cuf
6.05 cuf
2.25 cuf
5.28 cuf
7.31 cuf
4.46 cuf
14.06 cuf
134.27 cuf 3.80

5.36 cuf
14.06 cuf
4.36 cuf
3.80 cuf
1.11 cuf
4.74 cuf
1.51 cuf
0.56 cuf

35.50 cuf 1.01

14.28 cuf
37.50 cuf
23.25 cuf
20.25 cuf
25.27 cuf
8.06 cuf
25.70 cuf
- cuf

154.31 cuf 4.37

45.56 cuf
25.31 cuf
73.13 cuf
144.00 4.08

45.00 cuf
33.82 cuf
35.10 cuf
65.36 cuf
11.16 cuf
4.50 cuf
34.21 cuf
57.92 cuf

287.07 cuf 8.13


755.16 cuf 21.38 5,000.00 106,902.53

380.17
80.41
436.90
489.24
650.22
2,036.93 kg 2,036.93 60 122,216.01

32.13 cuf
84.38 cuf
52.31 cuf
45.56 cuf
13.37 cuf
56.85 cuf
18.14 cuf
6.75 cuf
8.80 cuf
12.19 cuf
7.43 cuf
23.44 cuf

337.90 cuf

130.23 cuf
342.00 cuf
212.04 cuf
184.68 cuf
54.17 cuf
230.44 cuf
73.53 cuf
27.36 cuf
35.21 cuf
48.75 cuf
29.70 cuf
93.75 cuf
1,461.87 cuf

18.38 cuf
47.25 cuf
6.56 cuf
40.50 cuf
13.13 cuf
1.13 cuf
18.00 cuf
144.94

1,654.83 cuf 46.85 4326 202,684.38

0.31 cuf
1.23
0.79 cuf
3.70
0.22 cuf
1.23
2.12 cuf
4.76
0.88 cuf
1.85
0.35 cuf
0.26

17.73 cuf 0.50 70550 35,411.23

24.5 sqf
63 sqf
17.5 sqf
54 sqf
17.5 sqf
3 sqf

179.5 sqf 16.68 2495 41,621.98

18 kg
7.5 kg
3 kg

28.5 kg 28.50 80 2,280.00

120.00 sqf
90.19 sqf
93.60 sqf
174.30 sqf
29.76 sqf
12.00 sqf
91.24 sqf

611.09 sqf 56.79 1482 84,166.65

154.44 sqf
111.96 sqf
4.32 sqf

270.72 sqf 25.16 760 19,121.49

(F+G)D*E*
H

655.2
297.6

952.8
21
17.5
38.5
914.3 sqf 84.97 890 75,625.19

380.80 SQFT
500.00 SQFT
310.00 SQFT
270.00 SQFT
158.40 SQFT
673.80 SQFT
215.00 SQFT
80.00 SQFT

2,588.00 SQFT

49 SQFT
126 SQFT
35 SQFT
108 SQFT
35 SQFT
6 SQFT
96 SQFT

455 SQFT

2133 SQFT 198.23 156 30,924.54

500.00 SQFT
310.00 SQFT
270.00 SQFT
93.90 SQFT
130.00 SQFT
79.20 SQFT
250.00 SQFT

1,633.10 SQFT 151.78 182 27,623.07

120.00 SQFT
90.19 SQFT
93.60 SQFT
174.30 SQFT
29.76 SQFT
12.00 SQFT
91.24 SQFT
154.44 SQFT

765.53 SQFT 71.15 172 12,237.07

2,398.63 sqf 222.92 33 7,356.39

1,633.10 sqf 151.78 38 5,767.45

4,031.73 sqf 374.70 47 17,610.71

966,366.98
8.00% 77,309.36
8.00% 77,309.36

1,120,985.69

120

40

15

90000
16,189.65 16,189.65

2600

80000

80000

16,700.05 16,700.05
9,000.00 9,000.00
1,162,875.39

82.08 sqf 7.63 216 1,647.70


30.78 cqf 0.87 5000 4,357.30
87.15 kg 87.15 60 5,228.77

28.88 sqf 0.82 4326 3,536.62

82.08 sqf
15.8125 sqf

97.8925 sqf 9.10 156 1,419.26

16,189.65
44 sqf
31.5 sqf
39 sqf
6.75 sqf

121.25 sqf 11.27 1,482.00 16,700.05

15 rf 15.00 600 9,000.00


2p 2.00 850 1,700.00

16,700.05
sand aggregate

kg/cum 0.43 cum/cum 0.86 cum/cum 0.214286 300

kg 3.54 cum 7.09 cum

sand aggregate
0.41 0.82
3 0.181818
KG 12.34 cum 24.68

cum

100 KG/CUM 0.28 CUM/CUM 500 P


cement sand brick
4,685.26 KG 13.12 CUM 23,426.30 P
93.71

5.53 Kg/sqm 0.015 cum/sqm


1,096.24 2.97 cum

F*6.68 F*0.0187
1,013.86 2.84 cum

F*2.67 F*0.0075
189.96 0.53 cum
21,246.70 kg 18.69 cum
424.93 begs
0.818182 1145.455
G.F. Estimate from 45' x49'

DEPTH/HEI
SOR ITEMS NO. side LENGTH WIDTH GHT
FILLING PLINTH
beam detail bed room 1 12.00 10.00
staire 1 11.52 12.66
drawing hall 1 11.70 8.00
drg hall 1 11.52 13.00
bed room 1 12.00 10.75
2.27.3 tiolet 1 4.00 7.44
tiolet 1 10 10.75
ots 1 4.00 3.00
sit out 1 11.52 10.52
open back 1 11.50 3.13

BEAM SHUTTERING plinth beam


A beam detail long wall 1 2 24.92
B long wall 1 2 12.92
II/1 short wall 1 2 30.21
short wall 1 2 29.56
short wall 1 2 12.39
short wall 1 2 12.79
short wall 2 2 10.79
short wall 1 2 8.79
short wall 3 2 11.5
A

providing & fixing from work I/c


lintel beam
Centering,shuttering,stuting,staggi long wall 1 2 24.92 0.375
ng priping bracing etc.complete &
including its removal upto height of long wall 1 2 12.92 0.375
4m above plinth level. short wall 1 2 30.21 0.375
short wall 1 2 29.56 0.375
short wall 1 2 12.39 0.375
short wall 1 2 12.79 0.375
short wall 2 2 10.79 0.375
short wall 1 2 8.79 0.375
short wall 3 2 11.5 0.375
C SLAB BEAM
long wall 1 2 24.92 1
long wall 1 2 12.92 1
short wall 1 2 30.21 1
short wall 1 2 29.56 1
short wall 1 2 12.39 1
short wall 1 2 12.79 1
short wall 2 2 10.79 1
short wall 1 2 8.79 1
short wall 3 2 11.5 1
projection 1 2 30.49 1

COLUMN
balcony 4 4 0.75 0.75 10
main 13 4 0.75 0.75 10

Suspended floor,roofs,landing ROOFING


shelves & supported balconies &
chhajjas
bed room 1 0 12 10
staire 1 0 11.52 12.66
drawing hall 1 0 11.7 8
drg hall 1 0 11.52 13
bed room 1 0 12 10.75
tiolet 1 0 4 7.44
tiolet 1 0 10 10.75
ots 1 0 4 3
sit out 1 0 11.52 10.52
open back 1 0 11.5 3.13

TOTAL SHUTTERING UPTO ROOF

CONCRETING

LINTEL BEAM LINTEL BEAM


providing & laying mechanically long wall 1 24.92 0.75 0.375
fixed excluding the
centering,shuttering & long wall 1 12.92 0.75 0.375
reinforcement in foundation ,plinth short wall 1 30.21 0.375 0.375
& super structure upto a hight of 4
providing & laying mechanically
fixed excluding the
centering,shuttering &
reinforcement in foundation ,plinth
& super structure upto a hight of 4 short wall 1 29.56 0.375 0.375
short wall 1 12.39 0.375 0.375
short wall 1 12.79 0.375 0.375
short wall 2 10.79 0.375 0.375
short wall 1 8.79 0.375 0.375

SLAB BEAM

long wall 1 24.92 0.75 1


long wall 1 12.92 0.75 1
short wall 1 30.21 0.75 1
short wall 1 29.56 0.75 1
short wall 1 12.39 0.75 1
short wall 1 12.79 0.75 1
short wall 2 10.79 0.75 1
short wall 1 8.79 0.75 1

COLUMN
balcony 4 4 0.75 0.75 10
main 13 4 0.75 0.75 10

SLAB bed room 1 0 12 10 0.375


staire 1 0 11.52 12.66 0.375
drawing hall 1 0 11.7 8 0.375
drg hall 1 0 11.52 13 0.375
bed room 1 0 12 10.75 0.375
tiolet 1 0 4 7.44 0.375
tiolet 1 0 10 10.75 0.375
ots 1 0 4 3 0.375
sit out 1 0 11.52 10.52 0.375
open back 1 0 11.5 3.13 0.375

TOTAL CONCRTING M-20 MIX


1:1.5:3 all total
TOTAL STEEL
providing & placing in position cold
twisted steel & hot rolled deformed qty in
steel rainforcement for RCC work TOTAL STEEL cum steel %
including cutting ,bending,binding
etc. complete as per drawing
including cost of binding wire &
including all wastage
providing & placing in position cold
twisted steel & hot rolled deformed
steel rainforcement for RCC work
including cutting ,bending,binding
etc. complete as per drawing Lintel beam 1 0.76 0.8
including cost of binding wire &
including all wastage Slab beam 1 3.25 1
column 1 2.71 1.2
Slab 1 9.65 0.8
TOTAL STEEL

BRICK WORK
up to SLAB
d VIII/3 CEMENT MORTAR 1:6 BEAM 10'6-1'-4.5"
Brick work with well burnt chimeny
bricks in bull patent trench kiln
crushing strength not less than long wall 1 2 24.92 0.75 9.12
25/sqcm & water absorption not long wall 1 2 12.92 0.75 9.12
more than 20% in foundation & short wall 1 2 30.21 0.375 9.12
plinth
short wall 1 2 29.56 0.375 9.12
short wall 1 2 12.39 0.375 9.12
short wall 1 2 12.79 0.375 9.12
short wall 2 2 10.79 0.375 9.12
short wall 1 2 8.79 0.375 9.12
short wall 3 2 11.5 0.375 5.00

DEDUCTION

D 3 3.5 0.75 7
D1 2 3 0.75 7
D2 2 2.5 0.375 7
W1 3 4 0.75 4.5
w2 1 2.5 0.75 3.5
V 0 2 0.375 1.5

BRICK WORK

FRAME WORK

Providing wood work in frame of


9.1.2 door & windows & clear story
FRAME windows & other frame wrought
9.1.2 framed & fixed in position D 3 1 3.5 0.21 0.42
1 2 7 0.21 0.42
D1 2 1 3 0.21 0.42
3 2 7 0.21 0.42
D2 2 1 2.5 0.21 0.42
1 2 7 0.21 0.42
W1 3 2 4 0.21 0.42
3 4 4.5 0.21 0.42
w2 1 2 2.5 0.21 0.42
hz 2 3 3.5 0.21 0.42
vt V 0 2 2 0.21 0.42
1 2 1.5 0.21 0.42

FRAME WORK

PANNEL
B 9.6.2 Sal, bija sal, benteak, haldu
pannel providing & fixing 35 . Th paneled
glazed or panneled glazed or D 3 3.5 7
door ,window,I/C ms but hinges & D1 2 3 7
necessary screws. D2 2 2.5 7
W1 3 4 4.5
w2 1 2.5 3.5
V 0 2 1.5

Pannels

VIII Grills
providing & fixing ms satty grills of
req.pattern in wooden framed
window etc. with round head nuts
by screws etc plain grills

73 kg/sqf
W1 3 1.5 4 4.5
w2 1 1.5 2.5 3.5
V 0 1.5 2 1.5

grills Grills

MARBLE

40 mm thick marble chips flooring bed room 1 0 12 10


rubbed & polished layer of 31 mm
thick cemant concrete 1:2:4 and staire 1 0 11.52 12.66
top layer 9 mm thick with white & drawing hall 1 0 11.7 8
black marble chips of size lais in
cement marble power mix 1:3 drg hall 1 0 11.52 13
bed room 1 0 12 10.75
tiolet 1 0 4 7.44
tiolet 1 0 10 10.75
ots 1 0 4 3
sit out 1 0 11.52 10.52
open back 1 0 11.5 3.13

MARBLE

marble chips
ots 1 0 4 3
sit out 1 0 11.52 10.52
open back 1 0 11.5 3.13

MARBLE chips

Dark shade pigment with ordinary


cemant

a wall tiles white & colour glazed tiles tiolet 1 2 4 7.44 7


in skirttir & rise of stairs & dado on
12mm thick cemant mortar 1:3 & tiolet 1 2 10 10.75 5
pointing & white deduction.
TOTAL
D2 2 0 2.5 7
TOTAL
total with deduction

PLASTER
12 mm cemant plaster (inside wall)
both side ignore outer
long wall 1 2 24.92 10
long wall 1 1 12.92 10
short wall 1 1 30.21 10
short wall 1 1 29.56 10
short wall 1 1 12.39 10
short wall 1 1 12.79 10
short wall 2 2 10.79 10
short wall 1 2 8.79 10

TOTAL

DEDUCTION D 3 2 3.5 7
D1 2 2 3 7
D2 2 2 2.5 7
W1 3 2 4 4.5
w2 1 2 2.5 3.5
V 0 2 2 1.5

TOTAL

In cement mortar 1:6 total inside plaster with dedution

15mm cement plaster(outside wall) long wall 1 1 12.92 10


short wall 1 1 30.21 10
short wall 1 1 29.56 10
short wall 1 1 12.39 5
short wall 1 1 12.79 5

XI/2 In cement mortar 1:6 total outer plaster with deduction

13.17 6 mm cemant plaster to celling bed room 1 12 10


staire 1 11.52 12.66
drawing hall 1 11.7 8
drg hall 1 11.52 13
bed room 1 12 10.75
tiolet 1 4 7.44
tiolet 1 10 10.75
ots 1 4 3
sit out 1 11.52 10.52
open back 1 11.5 3.13
CHHAJJAS
total celling plaster total celling plaster

WHITE CEMANT & COLOUR


White cemant (2 or more coat ) inside wall
with dry distemper of 2 coats of plaster celling
reqired shade inside wall plaster on
b XIV 10 new work (3 or more coats) to give all plaster
an even shade.
Finishing wall with water proofing out side wall
cemant out side wall plaster paint plaster
XIV of req. shade on new work (2 or
15 more coats) ton give an even
shade.

painting (2 or more coats ) with


synthethic enamel paint on new
work over & including an under
13.4.2 coats of primer to give an even all wall
shade Qty 2.5 times
qty limit no.
(8.5)
Add increement to S.O.R.S. to meet
the current market rates
For sanitary from work
for electric from work
ADDING
TOTAL ESTIMATE ABOVE ALL
ADD FOR ADD EXTER ITEMS (1)..add for
EXTRA boundary wall 140' rf @ 600/=RS
ITEMS per rf

(2)..Add for water proofing


treatments to slab @ RS 40 per sqf

(3)..Add for difference to putty


inside wall & celling sqf @ 22 RS
per sqf
(4).. Add for tube wall boaring with
jet pump
starire cost with recc des, plaster,
white cement
(5)..Mosquito net door & window
shuite
(6)..Modeler kitchen platform with
S.S sink
(7)..Mumty tower over stair case &
parapet wall
(8)..Marble flooring in tread & riser
of steps.
(9)..steel railing in stair case.
GRAND TOTAL

Stair Table

Shuttering 1 27.36 3
Rcc 1 27.36 3 0.375
steel 1 0.87 1
trade wt riser
Brick step 18 0.92 3.00 0.58

Plaster Bottom 1 0 27.36 3


Side 18 0.92 0.96
riser+rcc
trade depth

Marble Tread 16 0.92 3


riser 18 0.58 3
Landing 2 6.5 3
Skirting 18 1.50 0.25
trade +
rise

Steel Railing railling 1 15


pipe 2
sit out
railling 1 30.49
pipe 0

Total

shuttering

floar to slab 1,660.15


staire 82.08

1,742.23 sqf 161.92 sqm

concrete
M20 cement
floar to slab 578.10 1:1.5:3 390
staire 30.78
608.88 cuf 17.24 cum 6,723.19
steel

floar to slab 1,482.74


staire 87.15
1,569.89 kg

brick work 571.10 cuf 16.17 cum


bags

1:4 ratio
plaster
12mm 1658 sqf 154.09 sqm

15mm 852.80 sqf 79.26 sqm

6mm 944.65 sqf 87.79 sqm

total
UNIT (in QU.M.(in
QUT f) m) RATE AMOUNTS(RS)

18.69 sqf
9.69 sqf
22.66 sqf
22.17 sqf
9.29 sqf
9.59 sqf
16.19 sqf
6.59 sqf

114.87 10.68
49.84 sqf
25.84 sqf
60.42 sqf
59.12 sqf
24.78 sqf
25.58 sqf
43.16 sqf
17.58 sqf
69.00 sqf
60.98 sqf

375.32 sqf

90
292.5

382.5 SQFT

120.00 sqf
145.84 sqf
93.60 sqf
149.76 sqf
129.00 sqf
29.76 sqf
107.50 sqf
12.00 sqf

787.46 sqf

1,660.15 sqf 154.2893 216 33,326.50

7.01 cuf
3.63 cuf
4.25 cuf
4.16 cuf
1.74 cuf
1.80 cuf
3.03 cuf
1.24 cuf

26.86 cuf 0.76

18.69 cuf
9.69 cuf
22.66 cuf
22.17 cuf
9.29 cuf
9.59 cuf
16.19 cuf
6.59 cuf

114.87 cuf 3.25

22.50 cuf
73.13 cuf
0.00 cuf
95.63 2.71

45.00 cuf
54.69 cuf
35.10 cuf
56.16 cuf
48.38 cuf
11.16 cuf
40.31 cuf
4.50 cuf
45.45 cuf
787.4632
340.75 cuf 9.65

578.10 cuf 16.37 5,000.00 81,837.41


60.84
325.23
324.89
771.79
1,482.74 kg 1,482.74 60 88,964.37

170.45 cuf
88.37 cuf
103.32 cuf
101.10 cuf
42.37 cuf
43.74 cuf
73.80 cuf
30.06 cuf
64.69 cuf

717.91 cuf

55.13 cuf
31.50 cuf
13.13 cuf
40.50 cuf
6.56 cuf
- cuf
146.81

571.10 cuf 16.17 4326 69,947.82

0.93 cuf
1.23
0.53 cuf
3.70
0.44 cuf
1.23
2.12 cuf
4.76
0.44 cuf
1.85
- cuf
0.26

17.51 cuf 0.50 70550 34,970.79

73.5 sqf
42 sqf
35 sqf
54 sqf
8.75 sqf
0 sqf

213.25 sqf 19.82 2495 49,447.84

18 kg
3.75 kg
0 kg

21.75 kg 21.75 80 1,740.00

120.00 sqf
145.84 sqf
93.60 sqf
149.76 sqf
129.00 sqf
29.76 sqf
107.50 sqf
12.00 sqf
121.19 sqf
36.00 sqf

944.65 sqf 87.79 1482 130,108.66

12.00 sqf
121.19 sqf
36.00 sqf

169.19 sqf 15.72 760 11,949.90

(F+G)D*E*
H

416.64
1075

1491.64
35
35
1456.64 sqf 135.38 890 120,484.16

498.40 SQFT
129.20 SQFT
302.10 SQFT
295.60 SQFT
123.90 SQFT
127.90 SQFT
431.60 SQFT
175.80 SQFT

2,084.50 SQFT

147 SQFT
84 SQFT
70 SQFT
108 SQFT
17.5 SQFT
0 SQFT

426.5 SQFT

1,658.00 SQFT 154.09 156 24,037.92

129.20 SQFT
302.10 SQFT
295.60 SQFT
61.95 SQFT
63.95 SQFT

852.80 SQFT 79.26 182 14,424.68

120.00 SQFT
145.84 SQFT
93.60 SQFT
149.76 SQFT
129.00 SQFT
29.76 SQFT
107.50 SQFT
12.00 SQFT
121.19 SQFT
36.00 SQFT

944.65 SQFT 87.79 172 15,100.33

1,797.45 sqf 167.05 33 5,512.62


852.80 sqf 79.26 38 3,011.75

2,650.25 sqf 246.31 47 11,576.36

696,441.11
8.00% 55,715.29
8.00% 55,715.29

807,871.69

120

40

15

90000

16,189.65 16,189.65

2600

80000

80000

16,700.05 16,700.05
9,000.00 28,994.00
869,755.39

82.08 sqf 7.63 216 1,647.70


30.78 cqf 0.87 5000 4,357.30
87.15 kg 87.15 60 5,228.77
28.88 sqf 0.82 4326 3,536.62

82.08 sqf
15.8125 sqf

97.8925 sqf 9.10 156 1,419.26

16,189.65
44 sqf
31.5 sqf
39 sqf
6.75 sqf

121.25 sqf 11.27 1,482.00 16,700.05

15 rf 15.00 600 9,000.00


2p 2.00 850 1,700.00

30.49 rf 30.49 600 18,294.00

28,994.00

sand aggregate
0.41 0.82
3 0.181818
KG 7.07 cum 14.14
cum

100 KG/CUM 0.28 CUM/CUM 500 P


cement sand brick
1,616.92 KG 4.53 CUM 8,084.58 P
32.34

5.53 Kg/sqm 0.015 cum/sqm


852.11 2.31 cum

F*6.68 F*0.0187
529.43 1.48 cum

F*2.67 F*0.0075
234.41 0.66 cum

9,956.06 kg 11.52 cum


199.12 begs
0.818182 1145.455
Bar banding schedule pile foundation
ALL DIM IN M
Total bar Length in all
pile cap piles bar schedule pile cap col

no Bar c/c Bar len in total bar


foun of dia len widht ht/d #10 #12 #16 one pile #10 #12 #16
datio col epth size dis len
cap
n
type
P1 13 0.3 0.9 0.9 3.2 1 6 1 10 0.2 9.00 117.00 41.6 249.6 41.6
0 0 0
P2 9 0.2 0 0 3.2 4 10 0.2 - - 115.2 0 0
0 0 0
P3 5 0.2 0.6 0.9 3.2 4 10 0.2 5.70 28.50 0 64 0

F1

156.8 313.6 41.6


bar len in meter
bar weight 16 1.58026

strips main bar steel weight

Total strip bar pile cap


Bar size C/c dis no of 1 strips strips steel steel
#10 #12 #16 weight weight
# strips len bar in
all col

8 0.15 21 0.942 257.166 25.679 221.867 36.978 101.60 72.22


0 0 0
8 0.15 21 0.628 118.692 71.1111 0 0 46.89 -
0 0 0
8 0.15 21 0.628 65.94 0 56.8889 0 26.05 17.59

Total bar weight 96.7901 278.756 36.978 174.54 89.81 676.8758


weight in kg Total steel weight

10 %
extra 106.47 306.63 40.68 191.99 98.80 744.56
Bar banding Beam & colm G. F schedule
AL DIM IN M
bar schedule Total bar Length in all col
ht/len( G
col no of len width L TO #8 #10 #12 #16 #8 #10 #12 #16
type col SLAB)
C1 13 0.23 0.23 3.8 6 0 0 296.4 0

C2 5 0.23 0.23 1.52 4 0 0 30.4 0

Total 18 0 0 326.8 0

Plinth beam bar schedule


bar schedule Total bar Length in all col

col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16

PB1 1 0.23 0.23 72.78 5 363.89 0 0

Total 0 363.89 0 0

Floar Beam Bar schedule


bar schedule Total bar Length in all col

col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16

FB1 1 0.23 0.23 62.73 5 - - 313.64 -

FB2
FB3

FB4

FB5

Total - - 313.64 -

PB1 PB2
no len total no len total no
1 19.04 19.04 1
2 25 50 2
1 31 31 1
1 27 27 1
1 7.92 7.92 3
3 11.23 33.69 1
1 10.75 10.75 1
1 4 4
1 9.39 9.39
1 13 13
1 7.92 7.92
1 25 25

Total 238.71 FT Total 0 FT


72.7774 MT 0 MF
Total
bar weight 16 158025
g Beam & colm G. F schedule
AL DIM IN M
strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 25 0.92 299 - - 263.47 - 118.12

8 0.15 10 0.92 46 - - 27.02 - 18.17

Total bar weight - - 290.49 - 136.30


10% Extra - - 319.54 - 149.93 469.46

h beam bar schedule


strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 485 0.92 446.2 0 224.6217 0 0 176.2765

Total bar wieght 0 224.6217 0 0 176.2765


10% Extra - 247.08 - - 193.90 440.99

r Beam Bar schedule


strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 418 0.92 384.56 - - 278.79 - 151.92
Total bar weight - - 278.79 - 151.92
10% Extra - - 306.67 - 167.12 473.79

FB1 FB2 FB3


len total no len total no len total
19.04 19.04 0 0
25 50 0 0
31 31 0 0
27 27 0
11.23 33.69 0
10.75 10.75
34.27 34.27

205.75 FT Total 0 FT 0 FT
62.729 MF - MF - MF
Bar banding Beam & colm G. F schedule
AL DIM IN M
bar schedule Total bar Length in all col
ht/len( G
col no of len width L TO #8 #10 #12 #16 #8 #10 #12 #16
type col SLAB)
C1 13 0.23 0.23 3.8 6 0 0 296.4 0

C2 5 0.23 0.23 1.52 4 0 0 30.4 0

Total 18 0 0 326.8 0

Plinth beam bar schedule


bar schedule Total bar Length in all col
col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16
PB1 1 0.23 0.23 62.74 5 313.7 0 0

Total 0 313.7 0 0

Floar Beam Bar schedule


bar schedule Total bar Length in all col

col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16

FB1 1 0.23 0.23 76.38 5 - - 381.89 -

FB2

FB3
FB4

FB5

Total - - 381.89 -

PB1 PB2
no len total no len total no
1 19.04 19.04 1
2 25 50 1
1 31 31 1
1 27 27 4
1 7.92 7.92 2
3 11.23 33.69 1
1 10.75 10.75 1
1 4 4
1 9.39 9.39
1 13 13
1 7.92
1 25
Total 205.79 FT Total 0 FT
62.7409 MT 0 MF
Total
bar weight 16 158025
g Beam & colm G. F schedule
AL DIM IN M
strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 25 0.92 299 - - 263.47 - 118.12

8 0.15 10 0.92 46 - - 27.02 - 18.17

Total bar weight - - 290.49 - 136.30


10% Extra - - 319.54 - 149.93 469.46

h beam bar schedule


strips main bar steel weight strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len
8 0.15 418 0.92 in all
384.56col 0 193.6446 0 0 151.9249

Total bar wieght - 193.64 - - 151.92


10% Extra - 213.01 - - 167.12 380.13

r Beam Bar schedule


strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 509 0.92 468.28 - - 339.46 - 185.00
Total bar weight - - 339.46 - 185.00
- - 373.40 - 203.50 576.90

FB1 FB2 FB3


len total no len total no len total
19.04 19.04 0 0
25 25 0 0
31 31 0 0
27 108 0
11.23 22.46 0
10.75 10.75
34.27 34.27

250.52 FT Total 0 FT 0 FT
76.378 MF - MF - MF
Bar banding Beam & colm F. F schedule
AL DIM IN M
bar schedule Total bar Length in all col
ht/len( G
col no of len width L TO #8 #10 #12 #16 #8 #10 #12 #16
type col SLAB)
C1 13 0.23 0.23 3.8 6 0 0 296.4 0

C2

C3

Total 13 0 0 296.4 0

Floar Beam Bar schedule


bar schedule Total bar Length in all col

col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16

FB1 1 0.23 0.23 37.44 5 - - 187.18 -

FB2

FB3

FB4

FB5

Total - - 187.18 -

no
1
1
1
1
1
1
2
1
3
1

Total
bar weight 16 158025
g Beam & colm F. F schedule
AL DIM IN M
strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 25 0.92 299 - - 263.47 - 118.12

Total bar weight - - 263.47 - 118.12


10% Extra - - 289.81 - 129.94 419.75

r Beam Bar schedule


strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 250 0.92 230 - - 166.38 - 90.86

Total bar weight - - 166.38 - 90.86


10% Extra - - 183.02 - 99.95 282.97

FB1 FB2 FB3


len total no len total no len total
24.92 24.92 0 0
12.92 12.92 0 0
30.21 30.21 0 0
29.56 29.56 0
12.39 12.39 0
12.79 12.79
10.79
8.79
11.5
30.49

122.79 FT Total 0 FT 0 FT
37.436 MF - MF - MF