Sie sind auf Seite 1von 92

Nokia

Project Name LTE

LTE Solution LTE Combiner

Site Name DUMYAT DESR ENT_0744DE

Site ID 0744DE

Site area Dumyat

City Dumyat
0744DE
Nokia

Site Name DUMYAT DESR ENT_0744DE

Site Code 0744DE

2G Site Type Feeder

3G Site Type RRH and Feeder

Site GF or RT GF

Key # 3

visit date Thursday, May 25, 2017

Sub-contractor INNOVATECH GROUP

Eng/ name Mohamed Abd Elrasol

Mobile 1223001442
ENT_0744DE

DE

der

Feeder

ay 25, 2017

CH GROUP

bd Elrasol

01442
log file singed
Site Data photo
3G NODE-B

Front View R Side View

2G BTS 1

Front View R Side View

2G BTS 2 (if found)


Front View R Side View

2G BTS 3 (if found)

Front View R Side View

Tray photos

1 2
5 6

Shelter Wall photos(put outdoor photos if site outdoor)

1 2

Panorama photos
Upper

1 2

Lower
1 2

Rectifier

no

Inside Is there free C.Bs

3G DC-BOX (if found)

C.B inside Bar Photo


Roxtec

Roxtec-1 Roxtec-2

Mobinil LINK

Link type photo No. of links available


L Side View Panorama with jumbers/tray

L Side View Panorama with jumbers/tray


L Side View Panorama with jumbers/tray

L Side View Panorama with jumbers/tray

3 4
7 8

ite outdoor)

3 4

3 4
3 4

yes

Is there are free places to


BAR photo
install new C.Bs

C.B connected to (inside Rectifier Panorama


Panorama Free feeders

Krones Ethernet ports/ for Dual stack


h jumbers/tray SYS-Power Sockets SYS-Optical interface

h jumbers/tray SYS-Power Sockets SYS-Optical interface


h jumbers/tray SYS-Power Sockets SYS-Optical interface

h jumbers/tray SYS-Power Sockets SYS-Optical interface


5
5

ree places to
# rectifier modules Panorama/ rectifer
ew C.Bs

rama
Free feeders if found

for Dual stack Panorama


YS-Optical interfaces

YS-Optical interfaces
YS-Optical interfaces

YS-Optical interfaces
6
6

orama/ rectifer type


7 8
7 8
9 10
11 12
2
Transmission Information

Transmision Type
# of links in sites
M.W lDU type
# Crones/connected
# Ethernet ports for DS (busy)
# Ethernet ports for DS (Free)
Is there is SFP converter on DS ports(yes /no)
# free E1 ports on LINK DDF
Remarks
smission Information

NEC
1
I PASO 200
13 krones/4 connected
1 DS port no ? 2
3 DS port no ? 1,3,4
NO DS port no ? 5,6
11
Antenna System Information:
Desciption Sectors
Tower type Tower
Height of Tower/Pole/Mast
Antenna1
Height of Antenna from ground (m) 36m
Antenna Model N/A
Air Combiner (yes/no) No
Cell has Air Combiner No
Quantity of Antenna/cell 1
Antenna Azimuth (°) 160
Antenna Height 36m
Antenna total# ports 4

12 Port antenna data (fill in for cells have 12-p


free ports on antenna/band
Quantity of Feeder connected
Remarks
probably Sector 2 & Sector 3 in the sam
tors
Tower shared with Etisalat and Vodafone
80m
Antenna 2 Antenna 3 Antenna 4 Antenna 5
36m 37m 36m
N/A Huawei N/A
No No No
No No No
1 1 1
245 250 340
36m 37m 36m
4 6 4

n for cells have 12-port antenna)

ector 3 in the same Azimuth


Existing Generator / Solar power system
■Commercial
Power System Type

Remark:
Existing AC Power Panel
Main Power supply: Commercial
AC Power Type ■380V
Capacity 1: 63A 4Pole
Capacity 2: 32A
Capacity3: 10A
Circuit breakers capacities Capacity4 : 6A
Capacity5 : 25A
Capacity6 :
capacity7:
Rating (Amp):
AC power meter rating AC Cable from AC power meter to AC
distribution box
Remark:
Existing DC Power Equipment Information
Delta
DC Equipment Model (Rectifier
Type)

Rectifiers Circuit Breakers


1

Rectifiers Circuit Breakers

SITE DC Box (yes/no) NO


Capacity 1:

Existing DC Box (1) Capacity 2:


Circuit Breakers Capacity 3: A
Capacity 4: A
Dc-BOX has free Holes ? No
(yes/no)

Is there is 3G DC Box NO

Remarks : We need 1 CB 63A and there is a free pl


ommercial
■380V
Total Quantity: 2 In Use: 2
Total Quantity: 2 In Use: 2
Total Quantity: 6 In Use: 6
Total Quantity: 1 In Use: 1
Total Quantity: 1 In Use: 1
Total Quantity: In Use:
Total Quantity: In Use:

cable length (m):

No. of Modules

Capacity 1: 125A Total Quantity: 2


Capacity 2: 80A Total Quantity:1
Capacity 3: 63A Total Quantity: 1
Capacity 4: 6A Total Quantity: 6
Capacity 5: 25A Total Quantity: 1
Capacity 6: Total Quantity:
Capacity 7: Total Quantity:
Capacity 8: Total Quantity:
Capacity 2: A Total Quantity:
Capacity 1: A Total Quantity:
Capacity 2: A Total Quantity:

Total Quantity: In Use:


Total Quantity: In Use:
Total Quantity: In Use:
Total Quantity: In Use:

Quantity : 1

Connected to Rectifier by C.B


Capacity:
rate?

is a free place to install it


54.7V & 39.2A

Amp. Reading No. of connected Batteries

In Use: 2 Capacity : Total Quantity:


In Use: 1 Capacity : Total Quantity:
In Use: 1 Capacity : Total Quantity:
In Use: 0
In Use: 0
In Use:
In Use:
In Use:
In Use:
In Use: Free:
In Use: Free:

Capacity 1: A Total Quantity:


Existing DC Box Capacity 2: A Total Quantity:
(2) Circuit
Breakers

Capacity 1 Total Quantity:


Total Quantity of
C.B in 3G-DC- Capacity 2: Total Quantity:
BOX Capacity 3: A Total Quantity:
8 (SBS)12V, 170 Ah
Batteries
Type

In Use: In Use: Free:


In Use: In Use: Free:
In Use: In Use: Free:
In Use: Free:
In Use: Free:
In Use:
In Use:

In Use:
In Use:
In Use:
Below Antennas da
Tray outdoor

Part 1 Part 2

Tower ( Panorama )

Lower Middle
Tower (1) Tower (2)

3G RF Modules (if RRH)

RF-1 RF-2(U900)

2G RF Modules (if RRH)

RF-1 RF-2
RF-5 RF-6

( Sector 1 ) and Jumpers-Must be provided

Antenna No. of ports(4) Jumpers on Antenna

( Sector 2 ) and Jumpers-Must be provided

Antenna No. of ports (4) Jumpers on Antenna


( Sector 3 ) and Jumpers-Must be provided

Antenna No. of ports(6) Jumpers on Antenna

( Sector 4 ) and Jumpers-Must be provided

Antenna No. of ports (4) Jumpers on Antenna

( Sector 5 ) and Jumpers-Must be provided


Antenna No. of ports (12/6) Jumpers on Antenna
Antennas data must be provided for any solution

Part 3 Panorama

Upper Panorama
Tower (3)

RF-3 RF-4

RF-3 RF-4
RF-7 RF-8

Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)

Panorama

Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)

Panorama
Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)

Panorama

Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)

Panorama

Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)
Panorama
solution

ma

ma
160
N/A
4

No

245
N/A
4
No
255
Huawei
6
No

340
N/A
4
No
Proposal -1

1-Put LTE cabinet here above 3G


cabinet
2-Swap S1,S2 and S4 (4 port
antennas ) to (6 port antennas).
3-we need civil team to install 4 pair
of feeder for LTE

Indoor Preparation Needed:

Outdoor Preparation Needed:

RRH Preparation Needed:


RRH Preparation Needed:

RET Preparation Needed:


Proposal -1 Proposal -2

1-Put LTE cabinet here over 3G cabinet


ve 3G
2-put RF feeder for S1, S2, S4 note: we
port need to combine between DCS and
ennas). LTE
nstall 4 pair 3-we need civil team to install side
arm on Leg 3 above S3 antenna to put
RF module for S3

we neeed civil team to ins


2 we need baske
r Preparation Needed: 3 we need 20m DC po
4 we need 70m power
5

1 No Prep
2
or Preparation Needed:
3
4

1 we need side
2
H Preparation Needed:
H Preparation Needed: 3
4
5

T Preparation Needed: 1
No Prepa
Proposal -3

1-Put LTE cabinet here over 3G cabinet


2-Remove DCS sectors and put LTE
sectors instead of it at the same
combiners
3-we need civil team to install 1pair
of feeder for the sector 3

we neeed civil team to install Roxtec for Proposal 1 and 3


we need basket tray for any proposal
we need 20m DC power cablefor any proposal
we need 70m power cable for RRH RF module

No Preparation needed

we need side arm for proposal 2


No Preparation needed
Proposal -1

Put LTE cabinet here above 3G


cabinet

Photo of the proposal location


Proposal -2

put LTE Cabinet here as shown


Proposal -3

Put LTE cabinet here above 2G


cabinet
Recommended place for System Module

1st proposal

Put LTE cabinet above 3G cabinet

Recommended place for Side Arm

S3 on leg 3
S4 on leg 3

For Prposal 2 : we need c


install side arm on Leg 3 a
antenna to put RF modul
Shown

Recommended place for Side Arm:


we need side arm as shown on leg 3 above S3 antenna for Proposal 2
2nd Proposal 3rd Proposal

Put LTE cabinet here as shown

S2 on leg 4
S1 on leg 1

For Prposal 2 : we need civil team to


install side arm on Leg 3 above S3
antenna to put RF module for S3 as
Shown
3rd Proposal

S2 on leg 4
S1 on leg 1
2G BTS
2G BTS 2
3G BTS
LTE solution check list-very important to fill in carefully (the below
data is for example)

Item description Master BCF 3G NODE-B


Relocation needed no

1 # sectors/2G and 3G 4
2 BCF ID 441
3 BTS ID 35
4 # RFs 3 3
5 #GSM sectors 3
6 #DCS sectors 3 1
7 # 3G sectors 4
8 RF types 2 FXDA & 1 FXEA 2 FRGT & 1 FXDA
9 SYS-type ESMC FSMD

10 Conn-type/ GSM sectors C/C/C

11 Conn-type/ DCS sectors A/A/A

12 Conn-type/ 3G sectors A/A/A/A


13 # TRXs/sector(GSM) 5/4/3

14 TRXs power (GSM) watt 12W/15W/20W

15 # TRXs/sector(DCS) 1/1/1

16 TRXs power (DCS) watt 12W/15W/20W

17 3G 2nd carrier exist NO


18 # 3G Cells 4
19 3G carrier pow-watt 40W
20 #GSM TRXs/BCF
GSM TRXs ID exceed 18/
21
BCF
Site Info

Shelter/GSM
Site Name Site Code # of AC's
Room/Outdoor

DUMYAT DESR ENT_0744DE 0744DE Shelter N/A


Power Source Battery

AC's Site TE Generator # Of


Capacity Nodality Batteries
Secured Unsecured Main Standby
     N/A BTS secured ### ### ------- 8
Battery Rectifier
# of # of
Batteries Type Brand/V/Ah Rectifier Rectifier Brand Modules/ DC Load
Cabinets rectifier

(SBS)12v/170 Ah 1 Delta 6 54.7V


Transmission 2G & 3G

Mind (Ericsson/NEC)
Vendor # of BTS's # of RF Modules
No. Type (CN,6Por 20P/ IPASO)
1 NEC IPASO 200 Nokia 2 6 2
G & 3G

Add RF Modules