Sie sind auf Seite 1von 6

Task 2 (a) : Basic Fitting

TERMINAL PERFORMANCE - Identify 10 common metalworking tools by name and use.


OBJECTIVE
- Make square and circular bends in metal, using an
anvil or vise.

- Determine tap drill sizes for specific applications

- Use files and saw blades correctly.

- Layout and drill holes with a twist drill.

- Operate power tools such as drills and saws after


completing appropriate safety tests.

Purpose: Workshop exercise will be used to relate theory


to practice as standard shop operations and procedures are
explored.

Scope of work: Handling personal safety equipment for workshop practices,


Operating and maintaining measuring & cutting equipment such as
Measuring tool, cutting – drilling.

As per attached practical project worksheet


Procedure:

Methodology:
Operation Sheet

No Operation Essential Illustrations/method


procedure

1 Safety 1. Safety precaution


Awareness 2. Personal safety Briefing by workshop
3. Workshop safety Instructor
4. Machine safety

1. Read and
2 Prepare understanding the
the worksheet given
Material 2. Select the material
and Tools and identify the tools Briefing by workshop
 Marking Tool Instructor
 Measuring
Tool
 Cutting Tool

3. The right tools for the


right jobs

3 Marking 1. Measure and mark


2. Use scriber and L
square
4 Filing 1. File the edge of plate
2. Measure the length
according to the
drawing given.

5 Checking 1. Squareness using L


square
2. Flatness

6 Centre 1. Marking plate using


Marking Steel Scriber
2. Mark all drilling
holes and cutting
lines
3. Used centre punch to
mark drilling holes

7 Drilling 1. Drill centre hole


a -3mm using drilling
dia. machines
8 Cutting 1. Cut the pieces using
hacksaw

9 Filling 1. File the edge of piece


being cut
2. Check the
dimensions is correct

10 Drilling 1. Centre punch first


the location of hole
a. 5mm 2. Drill the hole using
dia. drilling machine
b. 10mm 3. Drill hole size
dia. according to
drawing.

11 Finishing 1. Make sure all burrs


and sharp edges are
removes
2. Flatness of pieces
according to
drawing.
MARKING SCHEME

No Description Score
1 Project 20 %
2 Log Book 20 %
3 Observation 20 %
4 Report 40 %
Total 100 %

Das könnte Ihnen auch gefallen