1.0. Material Specification
- Concrete = 250 kg/cm2
Compressive Strength Concrete, fc'
- Reinforcing Steel Bar
Minimum yield strength deformed bar, fy = 4000 kg/cm2

2.0. Material Parameter


Material Density:
Concrete (γ conc) = 2400 kg/m 3 24.0 kN/m3
Rebar (γ rebar) = 7850 kg/m 3 78.5 kN/m3
Soil (γ soil) = 1800 kg/m 3 18.0 kN/m3

3.0 DESIGN LOADING


The following loads and forces are considered in the design of Concrete Slab.

3.1 LIVE LOAD (L)


Total load of wheel's crane is classified into live load for this design.

4.0 LOAD COMBINATION

4.1 FACTORED LOAD COMBINATION


The following factored load combination is used to design concrete reinforcement by
Load and Resistance Factored Design method:
LC1-1 1.4[L]

4.2 UNFACTORED LOAD COMBINATION


The following unfactored load combination is used to check foundation stability, design bolt
capacity by Allowable Stress Design
LC2-1 1.0[L]

5.0 CALCULATION DESIGN PER 1 M2

1. PLAN
Plate Length (LP) = 1.00 m
Plate Width. (BP) = 1.00 m
Plate Height (HP) = 0.20 m
B Plate = 1m Cover concrete = 0.050 m

L Plate = 1m

2. LOADING DATA
Loads that applied to the concrete slab (per 1 m2) :

260 kN

Loads of 260 kN is taken for live load design

Load of each wheel = 130 kN

130 kN 130 kN
JASA PERANCANGAN, PENGADAAN, DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI GRESIK-SEMARANG

6-Apr-18
ISSUED FOR INFORMATION CALCULATION OF CONCRETE SLAB KURIPAN
Attachment A.
3. PLATE DESIGN

Input load :

Live Load ( kN )

Analysis Result :

Output Result - Moment ( KN.m)

1 Compressive Strength

fc' = 25.0 Mpa


a = 0.06 m
b = 1.0 m

C = 0.85*fc'*a*b
= 151.33 ton
= 1,513.32 kN

Wheels load = 130.00 kN


Factored wheels load = 182.00 kN

Check = OK
Load design 182.0 kN < Compressive strength 1,513.32 kN

2 Flexuaral Strength

Mult. = 455600.00 kgcm 45.56


HF = 20.00 cm
b = 100.00 cm
d = 14.4 cm (for Footing)
c= 5.00 cm = concrete cover
b1 = 0.85
Φ= 0.9
m= fy / ( 0.85 x f'c ) = 18.82
2
Ru = Mult. / ( Φ x b x d ) = 24.58
0.5
ρreq = ( 1 / m ) x ( 1 - ( 1 - 2 m Ru / fy ) ) = 0.006550
2
ρmin = 14 / fy (kg/cm ) = 0.003500
(ACI 318, Sect.23.3.2.1)
ρmin = (ρmin = 1.33 x r req ) = 0.008711
ρmin = (ρ min = 14/fy if 1.33 x ρ req > 14/fy)
ρmin = (ρ min = 0.18% if 1.33 x ρ req < 14/fy)
ρmin = (ACI 318 Sect. 7.12.2.1) = 0.00180
ρb = ((0.85 x β1 x fc')/fy) x (6120/(6120+fy)) (kg/cm2) = 0.027308
ρmax = 75% ρb = 0.020481
(ACI 318, APPENDIX B.10.3.3)
ρprovided = 0.00180
2
Asreq = ρprovided x d x BF = 9.40 cm
2
Asmin = ρmin x BF x d = 12.50 cm
Use D = 13 mm - 200 mm c/c
As provided = 13.27 cm2
Asmax = ρmax x BF x d = 29.39 cm 2 check : OK