REQUERIMIENTO N° 2

FECHA: 11/13/2018 DIA (MARCAR CON X)


OBRA: RESIDENCIAL TORRE DEL ANGEL II MARTES JUEVES
ENCARGADO : ARQ. HYRUM X PROMART
PARTIDA: ESTRUCTURAS - TORRE DEL ANGEL II 1 2 3
COSTO COSTO COSTO COSTO
N° DESCRIPCION CANT. UND UNITARIO COSTO TOTAL TIENDA UNITARIO COSTO TOTAL UNITARIO COSTO TOTAL TIENDA UNITARIO COSTO TOTAL TIENDA

CEMENTO FRONTERA (600 BLS PARA EL DIA VIERNES 16 DEL 2018) PARA VACIADO DE ZAPATAS F
1 1200 BLS
´C 210 KG/CM2
TOTAL = S/0.00

3/4" S/30.00 S/40.00 48 S/118.00


3/8" 500 5/8" S/14.00 S/168.00 450 S/618.00
1/2" 200 1/2" 600
5/8" 500 3/8"
3/4" 200 5.6
METRADO TOTAL SAN BORJA - ENCHAPE
CANT. P.U TOTAL
M2 22 S/ 15.00 S/ 330.00
ML 10 S/ 10.00 S/ 100.00
TOTAL AL 100% S/ 430.00

1 ENCHAPE 75% 322.5 CULMINADO POR OCTAVIO


2 BRUÑAS 15% 64.5 HUMBERTO
3 FRAGUAS 10% S/ 43.00 HUMBERTO

100% S/ 430.00

OCTAVIO COMO CONTRATISTA CORRESPONDE S/ 387.00

DIFERENCIA

TAREA ENCHAPE SAN BORJA


CANT. P.U TOTAL
DIAS - ENCHAPE Y TARRAJEO 3 S/ 85.00 S/ 255.00
DIAS - FRAGUADO 0.5 S/ 85.00 S/ 42.50
S/ 297.50

OCTAVIO COMO CONTRATISTA CORRESPONDE S/ 132.50


TAREA ENCHAPE SAN BORJA
CANT. P.U TOTAL
DIAS - ENCHAPE Y TARRAJEO 3 S/ 80.00 S/ 240.00 CULMINADO POR OCTAVIO
DIAS - FRAGUADO 0.5 S/ 80.00 S/ 40.00 CULMINADO POR HUMBERTO
S/ 280.00

CULMINAD AL 100 % S/ 280.00

OCTAVIO COMO CONTRATISTA CORRESPONDE S/ 240.00

S/ 147.00